The contract is awarded to the Consortium consisting of NIRAS, Implenia, EGIS Ukrainia. The winning offer was selected based on the consortium’s demonstrated strong track record in managing complex, multi-component projects, an experienced core team with international expertise, a robust and thematically relevant expert pool, a clear and coherent intervention methodology, an established network in Ukraine and the solid network with relevant Swiss actors and knowledge of Swiss approaches.
- Service
International Implementing Agency for the Municipal Infrastructure Development Programme – Project Preparation Facility Ukraine (with option for a second phase)
- Lieu
- Ukraine
- Service d'achat
- Swiss State Secretariat for Economic Affairs (SECO)/ WEIN
Adjugé
Adjugé à
- Niras A/S, AllerødCHF 17’155’020.00
Qu'est-ce qui est acquis ?
Étendue des prestations
The Municipal Infrastructure Development Programme (MIDP) - Project Preparation Facility (PPF) seeks to enable urban infrastructure projects in Ukraine through the inclusion of Swiss expertise by supporting project preparation, implementation of quick-win measures, co-financing of projects and strengthening of business networks.
The overall objective of the MIDP is that the Ukrainian population benefits from improved or re-established urban public services. The Facility seeks to contribute to this overall objective by enabling the implementation of urban infrastructure projects for Ukraine’s reconstruction. The underlying assumption is that well-prepared urban infrastructure projects are more likely to be implemented and to contribute sustainably to improved public services.
The Facility is structured along three components with a focus on basic urban infrastructure, flexibility and scalability. Component 1 finances preparatory work for urban infrastructure projects as well as quick-win measures. Component 2 co-finances the implementation of selected urban infrastructure projects. Component 3 strengthens established Swiss-Ukraine business networks. The Facility will actively screen the priority list of projects within Ukraine’s PIM, check those against Switzerland’s criteria, seize upcoming opportunities and react to ad hoc demands through different means. Quick-win measures are small operational measures, demonstration projects or investment projects that can be implemented rapidly, can serve as a demonstration of a new concept, and generate momentum and pave the way for larger investments or reforms.
The mandate of the Implementing Agency comprises all services that are deemed necessary to implement Components 1, 2 and 3 of the MIDP and achieve the project objectives. The Implementing Agency bears the main responsibility towards SECO for the activities and their results. The scope of services is described in more details in the attached documents.
Données clés, codes et options
Données clés, codes et options
- Type de marché
- Service
- Procédure
- Procédure sélective
- Corps de métier
- Ne ressort pas des données de publication disponibles.
- CPV
- CPV 65000000 – Services publics
- CPV 45000000 – Travaux de construction
- Options
- Ne ressort pas des données de publication disponibles.
- Variantes
- Ne ressort pas des données de publication disponibles.
- Offres partielles
- Ne ressort pas des données de publication disponibles.
Appréciation de TEXFY : Produits, installations, quantités, spécifications techniques et exclusions ne sont pas des champs structurés de la publication. TEXFY n'analyse pas le texte libre à ce sujet : à vérifier dans le texte original et dans les documents d'appel d'offres.
Source officielle
- Numéro de projet simap
- 7106
- Numéro de publication
- 7106-04
- Soumis aux accords internationaux
- Non
En savoir plus dans le guide
Signaler une erreur
Quelque chose est faux sur cette page, manque ou est mal traduit ? Nous examinons chaque signalement. Nous corrigeons nous-mêmes notre classement et nos traductions ; ce que simap publie, seul l'adjudicateur peut le modifier.