Contract awards in Bern, July 2026
All awards with the place of performance in the canton of Bern published on simap.ch in July 2026: who won the contract and at which price, as published. No ranking, no rating of companies.
124Awards
117with a published price
30awarded directly
4Median offers
Total of the published award prices: CHF 785’068’725 from 117 awards (with or without VAT, as published).
Median award price CHF 655’851; the middle half was between CHF 260’827 and CHF 1’586’615.
Only one offer: 8 % of the awards stating the number of offers (96 awards).
By service, contracting authority and procedure
Services
Contracting authorities
- Bundesamt für Bauten und Logistik BBL (Eidgenössisches Departement für auswärtige Angelegenheiten (EDA))14
- Einwohnergemeinde Oberhofen am Thunersee9
- Amt für Grundstücke und Gebäude des Kantons Bern (AGG)8
- armasuisse Ressourcen und Support CC WTO6
- BLS AG - Finance & SCM - Strategische Beschaffung4
- Swissgrid AG - Engineering & Construction4
- Tiefbauamt des Kantons Bern4
- BKW Energie AG - Procurement Services3
- Einwohnergemeinde Signau (Itten+Brechbühl)3
- Einwohnergemeinde Worb3
Procedures
- Open procedure8972%
- Direct award procedure2823%
- Selective procedure54%
- Invitation procedure22%
For comparison
All 124 awards
- Erlach: Sanierung Gostel
- Awarded to Fritz Gugger AG, MurtenCHF 633’946.30
- Beschaffung eines hochauflösenden Benchtop-mikroCT-Scanners Poseidon X4
- Awarded to OncoMed-Solutions GmbH, Wilen b. WollerauCHF 484’288.00
- arabern, BIO II Block 1 und 2 – Ersatz Schlammwasserklappen EM01
- Awarded to Ebro Armaturen International Establishment & Co. Kommanditgesellschaft, Eschen, Zweigniederlassung Cham, ChamCHF 377’447.36
- N16.14 MP-080191 Upn.Tavannes-Bözingenfeld BAMO - TP1 - TP5
- Awarded to OPAN concept SA, NeuchâtelCHF 287’643.30
- Technischer Betrieb für die Föderation der Identitätsdienste im Bildungsraum Schweiz (Edulog) 2027-2028
- Awarded to ELCA Informatique SA, PullyCHF 654’000.00
- N16.14 MP-080191 Upn.Tavannes-Bözingenfeld - Adaptation système de gestion pour voie montante ID 12099
- Awarded to Viscom Visual Communications AG, BernCHF 320’016.15
- Delivery from a TLF tank fire engine
- Awarded to Rosenbauer Schweiz AG, Oberglatt ZHCHF 509’500.00
- Verkehrssicherheitsmassnahmen Neueneggstrasse, 2. Etappe Oberau West, Baumeisterarbeiten
- Awarded to STRABAG AG, SchlierenCHF 548’573.14
- Erweiterung Schule Champagne - BKP 272.2 Äussere Metallbauarbeiten
- Awarded to muttscheller metallbau gmbh, Biel/BienneCHF 566’247.55
- Erweiterung Schule Champagne - BKP 271.1 Allgemeine Gipserarbeiten
- Awarded to Baronello GmbH, Biel/BienneEUR 535’169.00
- Hosting Enterprise Service Management Plattform «ServiceNow»
- Awarded to Swisscom (Schweiz) AG, BernCHF 804’264.00
- Beschaffung Thin Clients
- Awarded to BitHawk AG, SurseeCHF 657’702.00
- EBP-437_AFW Fellerstrass/Asylweg Teil 2
- Awarded to Marti AG Bern, Moosseedorf, MoosseedorfCHF 5’811’985.40
- Lieferung von vollelektrischen Saugkehrmaschinen
- Awarded to Bucher Municipal AG, NiederweningenCHF 850’893.20
- Lieferung von vollelektrischen Saugkehrmaschinen
- Awarded to Bucher Municipal AG, NiederweningenCHF 242’715.65
- Generalplaner SIA 32-53 für Kompensationsanlage im UW Mühleberg
- Awarded to BKW Energie AG, BernCHF 2’327’317.33
- Lieferung von vollelektrischen Saugkehrmaschinen
- Awarded to Bucher Municipal AG, NiederweningenCHF 393’713.20
- (b26024-4) Bern, Bollwerk 27, Sanierung / BKP 261
- Awarded to Schindler Aufzüge AG, BernCHF 212’108.42
- Sanierungs-, Revisions- und Unterhaltsarbeiten an Kugelfanganlagen
- Awarded to Leu & Helfenstein AG, St. ErhardCHF 941’551.00
- Fachtechnische Ausbildung ICT Warrior Academy
- Awarded to Stiftung Fernfachhochschule Schweiz, Brig FFH-CH, BrigCHF 1’946’259.43
- Bern, Schänzlihalde 31, Gesamtsanierung, BKP 225 Brandabschottungen
- Awarded to Jimmy's-Brandschutz GmbH, LiebefeldCHF 66’539.00
- Sortiment Navigationsgeräte
- Awarded to Garmin Switzerland Distribution GmbH, SchaffhausenCHF 553’901.70
- EBP-616_KVA, Versuchsanlage MinPlus
- Awarded to MinPlus B.V., AV SpankerenEUR 455’000.00
- Tee in Beuteln
- Awarded to Crowning's AG, AppenzellCHF 1’374’840.00
- N05.70 MP-080012 - Tun.Twann-Ligerz - Prestations de mandataire Environnement (RIE + SER) (ID 11751)
- Awarded to IC INFRACONSULT AG, BernCHF 1’676’771.55
- Modular medium-voltage (MV) system
- Awarded to ABB Schweiz AG, BadenCHF 5’438’103.46
- EBP-571-WV Bern-Wabern TP Netz Wabern Zentrum, Baumeister
- Awarded to Frutiger AG, BernCHF 3’720’763.25
- Planung und Realisierung des Innenausbaus von Büroräumlichkeiten
- Awarded to Integral design-build AG, SchlierenCHF 1’573’536.00
- JVA Thorberg Areal IS Park- und Lagerplätze/ Ladestationen
- Awarded to Kästli Bau AG, RubigenPrice not published
- Monitoring of public car parks in the city of Thun
- Awarded to Securitas AG Schweizerische Bewachungsgesellschaft, ThunCHF 473’062.90
- Sicherung Lawinengalerie Spreitgraben
- Awarded to SOLING AG, ThunCHF 1’320’338.90
- BKP 281.0 Subfloors
- Awarded to Walo Bertschinger AG Bern, BernCHF 768’750.70
- (b26024-9) Bern, Bollwerk 27, Sanierung / BKP 272.2
- Awarded to Karl Zimmermann AG, BernCHF 208’638.41
- (b26024-6) Bern, Bollwerk 27, Sanierung / BKP 271
- Awarded to Groupe Egli AG, Biel/BienneCHF 229’795.73
- CFF, Construction GC - Gare de St-Imier - La Clef nouvelle halte
- Awarded to Laurent Membrez SA, succursale de Delémont, DelémontCHF 4’970’869.20
- Beschaffung IKT Material
- Awarded to NÄGELE-CAPAUL AG, Triesen (LI), Zweigniederlassung Mörschwil, MörschwilCHF 864’739.12
- (b26024) Bern, Bollwerk 27, Sanierung / BKP 232
- Awarded to Gasser + Bertschy Elektro AG, BernCHF 1’549’958.10
- (b25016-11) Bern, Fe15a, Unterhalt / BKP 281.8
- Awarded to Lenzlinger Söhne AG, NänikonCHF 317’767.52
- Projekt 487 Stellwerkersatz Forch: Innenausbau BTG Scheuren
- Awarded to Premoco System AG, SarnenCHF 254’746.52
- QRM
- Awarded to CSP AG Competence Solutions Projects, St. GallenCHF 248’630.00
- Multifunktionaler Grimseltunnel: Zuschlag Projektallianz
- Awarded to Marti Tunnel AG, MoosseedorfCHF 551’522’104.80
- 20.0215 Gesamtsanierung Gebäude D sowie Erweiterung und technische Ertüchtigung der Laborinfrastruktur in den Gebäuden A, C und D
- Awarded to AAP Atelier für Architektur und Planung AG, BolligenCHF 941’500.00
- Erneuerung Cohesity Data Cloud Subscription
- Awarded to Sonio AG, BaarEUR 413’050.10
- (b26000-4) Bern, Fe15a, Unterhalt / BKP 285.1
- Awarded to Frepa Malerei AG, Biel/BienneCHF 119’406.50
- (b26000-5) Bern, Fe15a, Unterhalt / BKP 271
- Awarded to Frepa AG, LyssCHF 104’490.43
- Ergänzungsneubau Schulhaus Selhofen Kehrsatz - Einstufiger Projektwettbewerb für Architektur- und Landschaftsarchitekturbüros im selektiven Verfahren nach SIA 142
- Awarded to Arcollage AG, BernPrice not published
- Awarded to Sara Gelibter Architecte Sàrl, Biel/BiennePrice not published
- Awarded to vizo Architekten AG, BernPrice not published
- Awarded to W2H Architekten AG, BernPrice not published
- Rank 1 Ernst Gerber Architekten + Planer AG, LiebefeldCHF 48’645.00
- Rank 2 SSM Architekten AG, SolothurnCHF 27’025.00
- Rank 3 Atelier 5, Architekten und Planer, Aktiengesellschaft, BernCHF 21’620.00
- Rank 4 3B Architekten AG, BernCHF 10’810.00
- (b25016-13) Bern, Fe15a, Unterhalt / BKP 213
- Awarded to Mauchle Stahlbau AG, SurseeCHF 539’777.12
- Ergänzungsneubau Dorfschulhaus Kehrsatz - Einstufiger Projektwettbewerb für Architektur- und Landschaftsarchitekturbüros im selektiven Verfahren nach SIA 142
- Awarded to 3B Architekten AG, BernPrice not published
- Awarded to Aequipe GmbH, BaselPrice not published
- Awarded to ds.architekten gmbh, BaselPrice not published
- Awarded to W2H Architekten AG, BernPrice not published
- Rank 1 Arcollage AG, BernCHF 48’645.00
- Rank 2 SSM Architekten AG, SolothurnCHF 32’430.00
- Rank 3 Rykart Architekten AG, LiebefeldCHF 27’025.00
- Rank 4 Zenklusen Pfeiffer Architekten AG, BrigCHF 10’810.00
- 50-kV switchgear
- Awarded to GE Grid (Switzerland) GmbH, OberentfeldenCHF 25’253’351.90
- (Fb26062) Nachtrag 1, Sanierung und Umbau, Mühlestrasse 2, Ittigen / BKP 230
- Awarded to ISP Electro Solutions AG, OstermundigenCHF 1’243’150.00
- (b26000) Bern, Fe15a, Unterhalt / BKP 224.1
- Awarded to Growe-Siegenthaler AG, Gwatt (Thun)CHF 288’850.57
- Projektbegleitung eQV
- Awarded to Alcedo & Più Consulting AG, BernCHF 451’920.00
- Öffentliche Ausschreibung Sachversicherung des Kantons Bern per 1. Januar 2027
- Awarded to Zürich Versicherungs-Gesellschaft AG, ZürichCHF 695’689.40
- Arbeitsmittelkontrolle 2026
- Awarded to Immer AG, UetendorfCHF 191’903.30
- CFF, Ligne n° 210 La Neuveville-Ligerz-Twann / Ligerz-Twann : Augmentation de la capacité / Doublement de la voie Gléresse-Douanne / Tunnel de Ligerz / Lot 2 - Avenant 5
- Awarded to Consortium IBD, EchandensCHF 4’292’759.80
- Support Program for Agropastoral Sectors in the Sikasso, Bougouni, and Koutiala Regions (PAFA III) from November 1, 2026, to October 31, 2030
- Awarded to HELVETAS Swiss Intercooperation, ZürichCHF 2’210’000.00
- Energielieferung Labor Spiez
- Awarded to Oberland Energie AG, ThunCHF 10’004’114.50
- N08.64 MP-080145 - Brünig Gnoll - Kurve Wacht - Örtliche Bauleitung Bau (Phasen 41, 52 und 53) (ID 11856)
- Awarded to Infranext AG, KriensCHF 1’424’271.55
- WL Rohrmatt-Tannackerstrasse
- Awarded to Walo Bertschinger AG Bern, BernCHF 893’912.95
- Beschallungsanlagen (Audioverstärker, Lautsprecher und verstellbare Halterungen)
- Awarded to PKE Electronics AG, DietikonCHF 1’625’851.80
- Ablösung Serverumgebung
- Awarded to soulTec AG, DübendorfCHF 714’841.52
- Mikro CNC Fräsmaschine HSM 2.0
- Awarded to CHIRON Swiss SA, IsérablesCHF 571’373.00
- Qualitäts- und Risikomanager für das Projekt Einführung elektronische Verwaltungsrechtspflege (EVRP)
- Awarded to PvL Partners AG, ZürichCHF 196’525.80
- Apfelmus
- Awarded to MELINDA LAB SOCIETA' AGRICOLA ARL, CLESCHF 666’900.00
- Dienstpistolen / Holster zu Dienstpistolen
- Awarded to Schild Waffen AG, WallbachCHF 520’366.40
- (b25016-7) Bern, Fe15a, Unterhalt / BKP 211
- Awarded to Wirz AG Bauunternehmung, BernCHF 2’158’042.28
- Pädagogisches Zentrum Hofachern Spiez - Einstufiger Studienauftrag im selektiven Verfahren SIA 143
- Awarded to COMAMALA ISMAIL ARCHITECTES SARL, DelémontCHF 43’240.00
- Awarded to Froelich & Hsu Architekten AG, Brugg AGCHF 43’240.00
- Awarded to Rykart Architekten AG, LiebefeldCHF 43’240.00
- Awarded to Zenklusen Pfeiffer Architekten AG, BrigCHF 43’240.00
- Rank 1 Stoa architectes Sàrl, NeuchâtelCHF 43’240.00
- Ersatz des Kommunalfahrzeugs Ladog T1550
- Awarded to Viktor Meili AG, SchübelbachCHF 389’143.20
- Erweiterung IVU.suite (Flottenelektrifizierung und Personaldisposition)
- Awarded to IVU Traffic Technologies Schweiz AG, OltenCHF 2’287’007.00
- Energiezentrale ARA / Heizungsinstallationen
- Awarded to Guggisberg Kurz AG, OstermundigenCHF 1’512’973.05
- Dienstkleider FDA 2027
- Awarded to ALBIRO AG, SumiswaldCHF 2’453’634.35
- Langnau i.E. / Erneuerung Belag Ilfiskreisel / PMS 132
- Awarded to KIBAG Bauleistungen AG Langnau, Langnau im EmmentalCHF 799’381.10
- Ersatz Sitzpolster inkl. Armlehnen Refit RABe 515
- Awarded to SSC Swiss Shielding Corporation AG, GoldachCHF 1’132’498.58
- Buchwandtafeln und audiovisuelle Installationen
- Awarded to Embru-Werke AG, Rüti ZHCHF 531’417.00
- TR1570, 220kV Mühleberg-St-Triphon, Demontage- und Montagearbeiten Freileitung zur Leitungssanierung
- Awarded to Eduard Steiner AG Rikon, Rikon im TösstalCHF 1’728’506.17
- Beschaffung Sicherheitsschuhe TBA
- Awarded to Haix Vertriebs AG, EgerkingenCHF 400’940.20
- TR1570, 220kV Mühleberg-St-Triphon, Demontage- und Montagearbeiten Freileitung zur Leitungssanierung
- Awarded to RELE GmbH, Ringgenberg BECHF 4’467’278.23
- TR1570, 220kV Mühleberg-St-Triphon, Demontage- und Montagearbeiten Freileitung zur Leitungssanierung
- Awarded to Eduard Steiner AG Rikon, Rikon im TösstalCHF 3’626’386.72
- UW Zollikofen, 132kV SF-6 Kombiwandler
- Awarded to herzogenergy GmbH, HitzkirchCHF 711’294.75
- BB07 Forschungszentrum Medizin Universität Bern - BKP 231 Notlichtanlage
- Awarded to Zumtobel Licht AG, ZürichCHF 444’275.61
- E-Mitwirkung des Kantons Bern 2027-2028
- Awarded to Konova AG, ZugCHF 289’708.00
- Smart Wasserzähler
- Awarded to KAMSTRUP A/S, Skanderborg, Zweigniederlassung Rümlang, GlattbruggCHF 777’589.56
- (b26010) Besuchs- und Informationszentrum des Parlaments Bundesplatz 2, Bern
- Awarded to Co. Architekten AG, BernCHF 1’986’307.23
- (b26029) Besuchs- und Informationszentrum des Parlaments Bundesplatz 2, Bern
- Awarded to Bellprat Partner AG, ZürichCHF 3’923’251.68
- Comprehensive Renovation of the Worbboden Secondary School, BKP 273.0: Wooden Interior Doors
- Awarded to Schreinerei Siegfried AG, GrosshöchstettenCHF 717’986.90
- Sicherheitstechnischer Werterhalt, Verlängerung Wartung und Support der Applikation für die Sondereinheiten der Polizei
- Awarded to Neoos GmbH, ZürichCHF 1’320’000.00
- (b25016-6) Bern, Fe15a, Unterhalt / BKP 225.4
- Awarded to AGI AG für Isolierungen, DällikonCHF 137’757.60
- Comprehensive Renovation of the Worbboden Secondary School, BKP 285.1: Painting Work
- Awarded to Peter Spring AG, Gwatt (Thun)CHF 180’371.35
- ARA Worblental, Neubau EMV-Stufe, Sanitärarbeiten
- Awarded to Neuenschwander-Neutair AG, MünchenbuchseeCHF 262’853.40
- Comprehensive renovation of the Worbboden Upper Secondary School, BKP 273.1: Wall cabinets, shelving units, and similar items
- Awarded to Röthlisberger AG, Die Schreinermanufaktur, SchüpbachCHF 451’135.15
- Schulhaus Campus Signau - Submission BKP 250 Sanitäranlagen
- Awarded to CA Gebäudetechnik AG, Muri b. BernCHF 493’170.17
- Bern, Jupiterstrasse 2-2c, Beleuchtungsersatz, Ecole Cantonale de Langue Française (ECLF)
- Awarded to Regent Schweiz AG, BaselCHF 123’601.45
- Schulhaus Campus Signau - Submission BKP 214 Montagebau in Holz
- Awarded to LIGNOX Holzbau AG / TU AG, MärstettenCHF 1’629’800.35
- Sanierung Bruchweg, Wattenwil - Baumeisterarbeiten
- Awarded to Walo Bertschinger AG Bern, BernCHF 523’454.20
- Schulhaus Campus Signau - Submission BKP 175 Grundwasserabdichtung
- Awarded to Anliker AG Bauunternehmung, EmmenbrückeCHF 102’995.35
- Generalplaner – Labor Spiez, Erneuerung Areal Lattigen, 3700 Spiez
- Awarded to ANS Generalplaner AG, WorbCHF 6’241’716.25
- Veloverleihsystem in der Stadt Biel und Agglomeration (Bellmund, Büetigen, Brügg, Dotzigen, Erlach, Ipsach, Kallnach, Nidau, La Neuveville, Lyss, Port, Sutz-Lattrigen, Worben)
- Awarded to PubliBike AG, BernCHF 847’504.00
- Kommunikationsdienstleistungen FVS
- Awarded to Partner & Partner AG, WinterthurCHF 968’467.90
- Abwasserleitungen Saanematte / Regenbecken Gstaad; Planer- / Ingenieurleistungen Phasen 41-53
- Awarded to Emch+Berger AG Bern, Zweigniederlassung Spiez, SpiezCHF 935’281.20
- (24197) 101 Medienmonitoring (Clipping-/Capture-Services), Warten, Betreiben (SaaS) und Weiterentwickeln der Medienmonitoring-Plattform
- Awarded to pressrelations Schweiz AG, StansCHF 3’982’058.08
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 15’433.45
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 259.45
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 2’620.90
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 5’420.15
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 3’874.30
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 12’421.75
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 2’836.55
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 8’627.45
- Grünpflegearbeiten Oberhofen am Thunersee 2027-2029
- Awarded to Eugster Garten GmbH, Oberhofen am ThunerseeCHF 10’566.80
- Fachanwendung Verkehrsunfälle - Analysen mit GIS (FA VUGIS): Grundwartung, erweiterte Wartung und Support 2027-2033
- Awarded to ELCA Informatique SA, PullyCHF 4’362’916.00
- Sanierung Schulhaus Eichbühl in Hünibach - Elektroinstallationen
- Awarded to Vogt Elektro AG, HünibachCHF 140’961.55
- Orgelneubau in bestehendem Gehäuse der evang. ref. Kirchgemeinde Herzogenbuchsee
- Awarded to Orgelbau Kuhn AG, MännedorfCHF 1’500’000.00
- 13.0457 Langenthal, Sanierung Gymo - PKP 273.3 Allg. Schreinerarbeiten
- Awarded to rothenbühler AG, ZollbrückCHF 1’841’412.00
- Beschaffung von Weichen-Herzstücke
- Awarded to voestalpine Turnout Technology Zeltweg GmbH, ZeltwegCHF 864’800.00
- VS Wankdorf, Teilsanierung, Bedachungsarbeiten
- Awarded to Abdichtungsbau Durrer AG, Alpnach DorfCHF 380’641.00
- Erdungsstangen
- Awarded to Arthur Flury AG, DeitingenCHF 182’670.08
- Erdungsstangen
- Awarded to Arthur Flury AG, DeitingenCHF 618’550.90
- Köniz Neubau Fuss- und Radweg Muhlernstrasse zu Stapfenstrasse
- Awarded to H. Teuscher AG, DärstettenPrice not published
- MOB: Fahrbahnerneuerung Schönried-Saanenmöser
- Awarded to Walo Bertschinger AG Bern, BernCHF 13’822’723.06
- Amtliche Vermessung Dürrenroth Los 5
- Awarded to W+H AG, BiberistCHF 368’621.00
- VS Weissenbühl, Neubau, BKP 251 Sanitäranlagen
- Awarded to Neuenschwander-Neutair AG, MünchenbuchseeCHF 960’068.25
- P25.0244 / Bern, Wankdorfcity 3, Baufeld 1, Mieterausbau Schulraum SEK II, Doppelsporthalle und Aula
- Awarded to Immosol AG, ZürichCHF 12’000’000.00
- P25.0238 / Bern, Wankdorfcity 3, Baufeld 7/8, Mieterausbau Schulraum SEKII
- Awarded to Immosol AG, ZürichCHF 48’000’000.00
- Rahmenvertrag, Wandtafeln Stadt Bern, 903 Schulmobiliar
- Awarded to mobil Werke AG, BerneckCHF 2’597’567.85