Projects
Planned projects before they are put out to tender: large alpine PV plants with their permit status, transmission lines and rail expansions from the federal sectoral plans, building projects of the City of Zurich under construction, construction and planning credits of the parliaments, neighbourhood plans and urban projects in Geneva, planned public purchases in the French border region and at the SBB, SBB rail projects, Swissgrid grid projects, wastewater plants planning or building a micropollutant stage, the investment plans of Basel-Stadt and the City of Geneva, and the measures of the federal rail expansion and agglomeration programmes.
A project is not a tender. The clients decide whether, when and in which lots contracts are awarded; the tenders follow later, mostly on simap.ch.
Large private and semi-public buyers award many contracts by invitation only. Where to register as a supplier: Supplier portals
- Rail expansion programmeUnder construction
Dorfnest: Überwerfung und Zugfolgezeitverkürzung
Final cost forecast: CHF 62’700’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm ZEB, S. 10, as of Stichtag 31.12.2025
- Rail expansion programmePlannedSolothurn
Dornach-Apfelsee: neue Haltestelle
Final cost forecast: CHF 17’300’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 5, as of Stichtag 31.12.2025
- Rail expansion programmePlannedZurich
Dübendorf – Uster – Aathal: ZfZ-Verkürzung und Doppelspur
Final cost forecast: CHF 152’100’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedLucerne
Ebikon: Anlagenerweiterungen
Final cost forecast: CHF 190’300’000
In the sectoral plan for rail infrastructure: Ebikon (Interim result)
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedVaud
Echallens: Wendegleis
Final cost forecast: CHF 7’100’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedVaud
Eclépens: Zugang zum Standort Holcim
Final cost forecast: CHF 100’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS25, S. 8, as of Stichtag 31.12.2025
- Rail expansion programmePlannedSolothurn
Egerkingen: Perronverlängerung
Final cost forecast: CHF 2’400’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 3, as of Stichtag 31.12.2025
- Rail expansion programmePlanned
En Lugènes: Kreuzungsstation
Final cost forecast: CHF 10’000’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedFribourg
Estavayer-Sévaz: Logistikzentrum Broye
Final cost forecast: CHF 66’600’000
In the sectoral plan for rail infrastructure: Estavayer-Sévaz (Definitive)
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 5, as of Stichtag 31.12.2025
- Rail expansion programmePlanned
Fayot: Kreuzungsstelle
Final cost forecast: CHF 9’000’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedGraubünden
Fideris – Küblis: Neue Linienführung (Fideristunnel)
Final cost forecast: CHF 142’900’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 5, as of Stichtag 31.12.2025
- Rail expansion programmePlannedThurgau
Frauenfeld - Wil: Anpassungen Sicherungsanlagen
Final cost forecast: CHF 1’100’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 5, as of Stichtag 31.12.2025
- Rail expansion programmePlannedThurgau
Frauenfeld: Wendegleise und Güterannahmegleis
Final cost forecast: CHF 70’700’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmeUnder constructionFribourg
Fribourg/Freiburg: Bahnhof, 2.Personenunterführung
Final cost forecast: CHF 108’400’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm ZEB, S. 11, as of Stichtag 31.12.2025
- Rail expansion programmeUnder constructionGeneva
Genève, Erneuerung des Stellwerks
Final cost forecast: CHF 4’200’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS25, S. 7, as of Stichtag 31.12.2025
- Rail expansion programmePlannedGeneva
Genève: Abstellanlage
Final cost forecast: CHF 28’600’000
In the sectoral plan for rail infrastructure: Genève (Definitive)
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 3, as of Stichtag 31.12.2025
- Rail expansion programmePlannedGeneva
Genève: Kapazitätsausbau
Final cost forecast: CHF 1’519’600’000
In the sectoral plan for rail infrastructure: Genève (Definitive)
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS25, S. 7, as of Stichtag 31.12.2025
- Rail expansion programmeUnder constructionGeneva
Genève: Rekonfiguration Abstellanlagen
Final cost forecast: CHF 88’100’000
In the sectoral plan for rail infrastructure: Genève (Definitive)
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS25, S. 7, as of Stichtag 31.12.2025
- Rail expansion programmePlannedZurich
Glattbrugg – Bülach: Zugfolgezeitverkürzung
Final cost forecast: CHF 18’600’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 3, as of Stichtag 31.12.2025
- Rail expansion programmeUnder constructionBern
Grafenried–Jegenstorf: Doppelspurausbau
Final cost forecast: CHF 25’800’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS25, S. 8, as of Stichtag 31.12.2025
- Rail expansion programmeUnder constructionBasel-Landschaft
Grellingen – Duggingen: Doppelspur
Final cost forecast: CHF 120’000’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 3, as of Stichtag 31.12.2025
- Rail expansion programmePlannedBern
Gümligen Süd: Entflechtung
Final cost forecast: CHF 196’400’000
In the sectoral plan for rail infrastructure: Entflechtung Gümligen Süd (Definitive)
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS25, S. 7, as of Stichtag 31.12.2025
- Rail expansion programmePlannedZurich
Herrliberg-Feldmeilen – Meilen: Doppelspur
Final cost forecast: CHF 166’600’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedBern
Ins: Wendegleis
Final cost forecast: CHF 12’000’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 4, as of Stichtag 31.12.2025
- Rail expansion programmePlannedTicino
Intragna: neues 3. Gleis
Final cost forecast: CHF 10’900’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 5, as of Stichtag 31.12.2025
Quelle: Bundesamt für Energie (BFE), Photovoltaik-Grossanlagen in der Schweiz
The information comes from an external source (BFE – Photovoltaik-Grossanlagen in der Schweiz) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BFE – Photovoltaik-Grossanlagen in der Schweiz, opens in a new tab)Terms of use(BFE – Photovoltaik-Grossanlagen in der Schweiz, opens in a new tab)
Quelle: Bundesamt für Energie (BFE), Sachplan Übertragungsleitungen (SÜL)
The information comes from an external source (BFE – Sachplan Übertragungsleitungen (SÜL)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BFE – Sachplan Übertragungsleitungen (SÜL), opens in a new tab)Terms of use(BFE – Sachplan Übertragungsleitungen (SÜL), opens in a new tab)
Quelle: Bundesamt für Verkehr (BAV), Sachplan Verkehr, Teil Infrastruktur Schiene (SIS)
The information comes from an external source (BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS), opens in a new tab)Terms of use(BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS), opens in a new tab)
Quelle: Stadt Zürich, Amt für Hochbauten, AHB-Hochbauprojekte in Ausführung OGD
The information comes from an external source (Stadt Zürich – AHB-Hochbauprojekte in Ausführung) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(Stadt Zürich – AHB-Hochbauprojekte in Ausführung, opens in a new tab)Terms of use(Stadt Zürich – AHB-Hochbauprojekte in Ausführung, opens in a new tab)
Source: OpenParlData.ch
Business with construction and planning credits selected by TEXFY; titles, statuses and dates as delivered.
The information comes from an external source (OpenParlData.ch – Bau- und Projektierungskredite der Parlamente) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(OpenParlData.ch – Bau- und Projektierungskredite der Parlamente, opens in a new tab)Terms of use(OpenParlData.ch – Bau- und Projektierungskredite der Parlamente, opens in a new tab)
Quelle: APProch – Projets d'achats publics, Direction des Achats de l'État, über data.gouv.fr, Licence Ouverte 2.0, Stand der Daten 10.11.2026. Geplante Beschaffungen sind unverbindlich und nicht vollständig; keine Ausschreibung.
The information comes from an external source (APProch – Projets d'achats publics (Frankreich)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(APProch – Projets d'achats publics (Frankreich), opens in a new tab)Terms of use(APProch – Projets d'achats publics (Frankreich), opens in a new tab)
Source : Portail des données SITG (État de Genève), téléchargé et/ou extrait en date du 10.11.2026.
Fields selected and presented by TEXFY (compilation under condition 5.3.2 of the SITG).
Further use of these data is subject to the terms of use of the Portail des données SITG (condition 5.5.1).
The information comes from an external source (SITG Genève – Plans localisés de quartier (adoptés et en procédure)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(SITG Genève – Plans localisés de quartier (adoptés et en procédure), opens in a new tab)Terms of use(SITG Genève – Plans localisés de quartier (adoptés et en procédure), opens in a new tab)
Source : Portail des données SITG (État de Genève), téléchargé et/ou extrait en date du 10.11.2026.
Fields selected and presented by TEXFY (compilation under condition 5.3.2 of the SITG).
Further use of these data is subject to the terms of use of the Portail des données SITG (condition 5.5.1).
The information comes from an external source (SITG Genève – Projets urbains du plan directeur cantonal) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(SITG Genève – Projets urbains du plan directeur cantonal, opens in a new tab)Terms of use(SITG Genève – Projets urbains du plan directeur cantonal, opens in a new tab)
Quelle: Schweizerische Bundesbahnen SBB, Bahnprojekte und regionale Bauprogramme (company.sbb.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (SBB – Bahnprojekte und regionale Bauprogramme) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(SBB – Bahnprojekte und regionale Bauprogramme, opens in a new tab)Operator's legal notice(SBB – Bahnprojekte und regionale Bauprogramme, opens in a new tab)
Quelle: Schweizerische Bundesbahnen SBB, Geplante Beschaffungen SBB Infrastruktur (Excel-Liste)
Die veröffentlichten Einträge dienen ausschliesslich zu Informationszwecken. Aus der Veröffentlichung entsteht kein Anspruch auf den Rechtsweg oder sonstige rechtliche Ansprüche gegenüber dem Herausgeber.
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (SBB – Geplante Beschaffungen SBB Infrastruktur) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(SBB – Geplante Beschaffungen SBB Infrastruktur, opens in a new tab)Operator's legal notice(SBB – Geplante Beschaffungen SBB Infrastruktur, opens in a new tab)
Quelle: Swissgrid AG, Projektübersicht der Netzprojekte (swissgrid.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Dates as written on the project page, sorted by kind by TEXFY; Swissgrid states them for an optimal course without court proceedings.
The information comes from an external source (Swissgrid – Netzprojekte (Projektübersicht)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Swissgrid – Netzprojekte (Projektübersicht), opens in a new tab)Operator's legal notice(Swissgrid – Netzprojekte (Projektübersicht), opens in a new tab)
Quelle: VSA-Plattform «Verfahrenstechnik Mikroverunreinigungen», Liste der ARA mit MV-Stufe (micropoll.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe, opens in a new tab)Operator's legal notice(VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe, opens in a new tab)
Quelle: Kanton Basel-Stadt, Budgetbericht 2026, Investitionsübersichtsliste (Kap. 5.1.3)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Only the building and infrastructure part of the list is taken over: urban development and public space infrastructure, public transport, administrative buildings.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht), opens in a new tab)Operator's legal notice(Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht), opens in a new tab)
Source : Ville de Genève, 21ème Plan financier d'investissement 2026-2037
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The lists of voted and submitted credits and of the plan's active projects are taken over, without the revenue.
The information comes from an external source (Ville de Genève – Plan financier d'investissement (PFI)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Ville de Genève – Plan financier d'investissement (PFI), opens in a new tab)Operator's legal notice(Ville de Genève – Plan financier d'investissement (PFI), opens in a new tab)
Quelle: Bundesamt für Verkehr BAV, Kennzahlen zu Standbericht Eisenbahnausbauprogramme (Datenbeilage zum Standbericht 2025)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Measures as of the report's reference date; TEXFY does not show measures marked as suspended (“sistiert”) or finished (“beendet”) as projects.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme, opens in a new tab)Operator's legal notice(BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme, opens in a new tab)
Quelle: Bundesamt für Raumentwicklung ARE, Factsheets «Mitfinanzierte Agglomerationsprogramme der 5. Generation» (Vernehmlassung Verkehr ’45)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
State of the consultation “Transport ’45” of 19.06.2026: Parliament decides on the federal contributions. Measures of priority B and C are not co-financed by the Confederation in this generation.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (ARE – Massnahmen der Agglomerationsprogramme (5. Generation)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(ARE – Massnahmen der Agglomerationsprogramme (5. Generation), opens in a new tab)Operator's legal notice(ARE – Massnahmen der Agglomerationsprogramme (5. Generation), opens in a new tab)