Sissach - Chienbergtunnel / Project author overall renovation SIA phases 31 - 53
Machine-translated
12 days left
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
Bid languageNote
The bid must be in German.
References requiredNote
For eligibility you need comparable reference projects. Check number, age and size.
Securities per contractGood to know
Whether a surety or guarantee is needed is set out in the contract or the documents. Check there.
Subcontracting limitedGood to know
The publication limits subcontracting, for example by share or by requiring consent.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
The seven structures of the N07 national highway in section 76 (km 7.9 – 27.0) between Frauenfeld and Engwilen were put into service between 1972 and 1992. They comprise three overpasses (UEF Schaffhauserstrasse, UEF Militärstrasse, UEF Bahnhofstrasse) as well as two pairs of bridges over the Thur (Müllheim) and the Engwiler Tobel (Wäldi).
Between 1995 and 2015, partial repairs were carried out on individual structures (expansion joints, waterproofing, concrete repairs, scour protection). A comprehensive, coordinated repair like the one planned has not yet taken place.
Substantial damage was found on the seven affected structures during the 2023 main inspection and subsequent special inspections (2025/2026).
Structural safety is not currently under acute threat; the damage primarily affects durability, drainage, and expansion joints. Without prompt repair, progressive damage to the concrete components (chloride ingress, corrosion) and further restriction of operational safety are to be expected.
The available archived basics (logbooks, HI reports 2023, inspection reports, object agreements) are available (will be sent to the PV after procurement), but must be summarized and evaluated by the PV for further processing. In particular, the repair documents from 1995 (Thur bridges) and 1995/2010 (Militärstrasse) must be checked regarding measures carried out vs. omitted.
The detailed project perimeters/project contents, etc., can be found in the project compendium.
The procurement comprises the engineering service for the construction project author for the ASTRA phases:
- Measures concept+ (MK+)
- Measures project (MP)
- Tendering, tender comparison, award application
- Documents for execution
- Construction
- Commissioning, completion
A maintenance concept (EK) for engineering services is not procured; EK services that are necessary for the MK+ must be provided within the MK+.
Furthermore, part of this procurement is:
- Local construction management including CBL (which is however described in a separate specifications document)
The main project objectives are as follows:
· Preservation of the load-bearing capacity and durability of all seven structures in section N07/76 (km 7.9-27.0) through targeted repair of damaged components (expansion joints, drainage, concrete surfaces, bridge ends, edge curbs)
· Ensure operational safety: Prevention of progressive damage (chloride ingress, corrosion of reinforcement/prestressed steel, concrete spalling) and securing of traffic management without load restrictions
Coordinated, efficient execution: Bundling of 14 expansion joint replacements and accompanying concrete repairs into · a single overall contract for the optimal use of personnel, equipment, and closure windows (goal: end of construction at the end of 2029)
o Award strategy, in one or multiple lots, to be determined in the MP
· Interface management with third parties: Early coordination with Canton Thurgau (UEF Schaffhauserstrasse, UEF Bahnhofstrasse, Thur bridges) and City of Frauenfeld (UEF Militärstrasse) for combined surfacing replacement/waterproofing closures and traffic management, if applicable coupling of further measures on the part of the canton/municipality
· Cost and schedule reliability: Adherence to the cost framework and the schedule
· Minimization of traffic disruptions: Keeping closures as short as possible, staged lane reduction, night closures, and flyover testing at the Thur and Engwiler Tobel bridges
Scope of services construction PV:
1. Determination of basics: Depending on the structure, varying amounts of existing documents may be available. The available documents must be procured from the archive by the PV. If documents relevant to the project planning are missing, supplementary on-site determinations of basics must be carried out if necessary.
2. Clarify ownership/maintenance boundaries & update object agreements: no object agreement in KUBA for TG_769; check existing agreements (TG_713, TG_719, TG_743-/+, TG_752) for up-to-dateness, contractually secure interfaces (edge finishes, drainage, marking, lighting)
Environmental coordination Thur bridges: Consultation with FU environment according to measures concept 1. (repair areas above bank area, not directly above river)
2. Overall traffic management concept: Staged lane reduction, night closures, flyover deployment testing, closure list comparison, coordination with territorial unit/traffic service – critical path for construction period 2029
3. Proposals for involving additional specialist planners if necessary
Superordinate coordination:
A BHU is not intended for this project. The project planning takes place within the framework of the PV, possibly FPs and the client. Coordination with other participants (FU, Canton Thurgau, Municipality of Frauenfeld, Municipality of Hüttlingen, Municipality of Müllheim, Municipality of Wäldi, territorial unit, KaPo, etc.) is required and must be initiated and carried out under the lead management of the construction PV.
The superordinate coordination of the other FPs with the construction PV is the responsibility of the construction PV. The latter must assume lead management and coordinate deadlines, submissions, or the like from the FPs.
Lump-sum and global bids and/or bids with hourly average rates are excluded.
The hourly rates (according to fee category) must obligatorily correspond to the following pattern: A > B > C > D > E > F > G etc.
The bids must be submitted completely filled out. Modifications to the bid text are not permitted. Partial bids are invalid and will be excluded from the application.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Questions must be submitted in German in the "Forum" at www.simap.ch. They will be answered identically to all recipients of the tender documents in the "Forum" at www.simap.ch until December 16, 2026. Questions arriving after December 10, 2026 will no longer be answered.
No site visit will take place.
By post or delivery in person
Bundesamt für Strassen ASTRA - Filiale WinterthurMP-260025 N07-76 FF-EW Brückeninstands TG PV Bau MK+ bis IBN, BL – Nicht Öffnen - OffertunterlagenGrüzefeldstrasse 418404 WinterthurSource: simap data
In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation.
EK 1
TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.
Technical capability (company reference)
For the tenderer: One reference project regarding completed work with comparable complexity and from the same specialist area.
For the proof of all tendered phases, a second reference project can be provided if necessary. If a second reference project is specified, it will be considered exclusively for the proof of the project phase missing in the first specified reference project.
EK 2
TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.
Qualification of the key person project manager construction project author (PL PV Bau)
For the tenderer: One reference project regarding completed work with comparable complexity and from the same specialist area in an equivalent function or deputy.
For the proof of all tendered phases, a second reference project can be provided if necessary. If a second reference project is specified, it will be considered exclusively for the proof of the project phase missing in the first specified reference project.
The reference should essentially show the main task areas, the function, and the experience.
In addition, a CV of the key person must be enclosed with the bid.
EK 3
TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.
Proof of availability of the key persons
Proof that availability is given for the next two years. Detailed listing and presentation of the time workload on the other projects.
Required minimum availability:
PL PV Bau 15%
Deputy PL PV Bau 20%
CBL Bau 20% (from Q1/2028)
EK 4
TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.
Proof of economic and financial capability
Annual turnover > double the annual turnover of the contract
EC 5
TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.
Proof of the performance share of subcontractors / subplanners
Proof that a maximum of 50% of the services are provided by subcontractors (detailed list of any subcontractors planned, including their share of services).
Characteristic services are defined as those services to be provided by the key personnel in accordance with the Award Criteria (Project Manager Project Author Construction, Dep. Project Manager Project Author Construction). The key personnel must compulsorily be provided by the main tenderer.
All economically and technically capable companies that also provide the following suitability proofs are invited to submit a tender in CHF.
AC 1 Quality of the tenderer
40 %
TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.
The evaluation of the three key personnel (Project Manager Project Author Construction, Dep. Project Manager Project Author Construction, Chief Construction Manager Construction) is based on the reference projects as well as the CVs, with the main focus being on the reference projects.
Qualification of key personnel regarding the requirements in the project:
- Completed works
- Comparable complexity
- Same specialist areas processed
AC1.1 Project Manager Project Author Construction (PM PA Const)
Weighting: 20%
Description:
For the tenderer: One reference project regarding completed work with comparable complexity and from the same specialist area in an equivalent function or deputy.
For the proof of all tendered phases, a second reference project can be provided if necessary. If a second reference project is specified, it will be considered exclusively for the proof of the project phase missing in the first specified reference project.
The reference should essentially show the main task areas, the function, and the experience.
In addition, a CV of the key person must be enclosed with the bid.
AC1.2 Dep. Project Manager Project Author Construction (Dep. PM PA Const)
Weighting: 10%
Description:
For the tenderer: One reference project regarding completed work with comparable complexity and from the same specialist area in an equivalent function or deputy.
For the proof of all tendered phases, a second reference project can be provided if necessary. If a second reference project is specified, it will be considered exclusively for the proof of the project phase missing in the first specified reference project.
The reference should essentially demonstrate the main task areas, the function, and the experience. In addition, a CV of the key person must be enclosed with the tender.
AC1.3 Chief Construction Manager Construction (CCM Const)
Weighting: 10%
Description:
For the tenderer: One reference project on completed works with comparable complexity from the same specialist area as chief construction manager or dep. chief construction manager.
The reference should essentially show the main task areas, the function, and the experience.
In addition, a CV of the key person must be enclosed with the bid.
AC 2 Quality of the tender
30 %
TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.
The quality of the tender is evaluated using the three sub-award criteria 'Task analysis', 'Procedure proposal with project organization', and 'Plausibility of the tender'.
AC2.1 Task analysis
Weighting: 10%
Description:
The task analysis must address the following topics:
a) Initial situation and objective
b) Special technical challenges of the project
c) Special organizational challenges of the project
d) Assessment of the fee hours and distribution specified by the client (fee table)
AC2.2 Procedure proposal with project organization
Weighting: 10%
Description:
The procedure proposal must address the following topics:
a) Structured procedure plan with the main focuses in project processing
b) Special risks from the perspective of the tenderer and measures to manage these risks
c) Project-related organization chart and detailed program phase MK+ up to commissioning with the involvement of specialists and third parties, including information on planned employees per function and coordination of project participants
AC2.3 Plausibility of the tender
Weighting: 10%
Description:
The plausibility of the tender is evaluated as follows: The plausibility check of the tender examines whether the individual tender components are coordinated with one another and comprehensible. It is checked whether the organization chart matches the deployed personnel and the hour allocation and whether it coincides with the schedule. Furthermore, it is also checked whether the hour allocation to the individual functions (e.g. PM hours, engineering hours, draftsman hours, etc.) is plausible.
AC 3 Price
30 %Price criterion
TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.
Price
The information regarding award criteria must be submitted together with the tender documents:
Price evaluation
The lowest adjusted tender receives the maximum grade (5). Tenders whose price is 100% or more above the lowest tender receive grade 0. Evaluation in between takes place linearly (rounded to 2 decimal places). Any discounts offered are not taken into account in the price evaluation.
Grading of the remaining award criteria
The evaluation is always carried out with grades from 0 to 5:
0 = Not assessable; no information provided
1 = Very poorly fulfilled; insufficient, incomplete information 2 = Poorly fulfilled; information without sufficient project reference 3 = Fulfilled, corresponding to the requirements of the tender 4 = Well fulfilled; Qualitatively good
5 = Very well fulfilled; Qualitatively excellent, very large contribution to target achievement
If a main criterion consists of sub-criteria, these are graded. The score of the main criterion results from the sum of the grades of the sub-criteria multiplied by their weighting.
Points calculation: Sum of all grades multiplied by their weighting (maximum points: grade 5 x 100 = 500 points).
Permitted. The lead management must be transferred to a company of the consortium. The other participants must be announced in the tender documents. Members of the consortium may not be replaced after submitting the bid.
Permitted. Subcontractors can be engaged up to a max. of 50%. They must be listed accordingly in the tender documents. Information regarding subcontractors will be co-evaluated. The characteristic service must fundamentally be provided by the contractor.
An extension takes place depending on the availability of credits, the project progress, any project changes, approval in line, and not least the quality of the services provided.
According to the intended contract document.
30 days after receipt of invoice at ASTRA.
The remuneration and prices include all services mentioned in the tender documents and necessary for contract fulfillment.
According to the intended contract document.
1. Subject to the procurement maturity of the project and the availability of credits;
2. The preparation of the tenders will not be remunerated. The tender documents will not be returned;
3. Tender documents are available in German. In the event of contradictions between the versions, the German version is decisive.
4. The project platform CDE-Confederation will be provided for the project. Management is carried out by the PA Construction. Details can be found in the tender.
Keine
Keine
For the tenderer: One reference project regarding completed work with comparable complexity and from the same specialist area.
For the proof of all tendered phases, a second reference project can be provided if necessary. If a second reference project is specified, it will be considered exclusively for the proof of the project phase missing in the first specified reference project.
For the tenderer: One reference project regarding completed work with comparable complexity and from the same specialist area in an equivalent function or deputy.
For the proof of all tendered phases, a second reference project can be provided if necessary. If a second reference project is specified, it will be considered exclusively for the proof of the project phase missing in the first specified reference project.
The reference should essentially show the main task areas, the function, and the experience.
In addition, a CV of the key person must be enclosed with the bid.
Proof that availability is given for the next two years. Detailed listing and presentation of the time workload on the other projects.
Required minimum availability:
PL PV Bau 15%
Deputy PL PV Bau 20%
CBL Bau 20% (from Q1/2028)
Annual turnover > double the annual turnover of the contract
Proof that a maximum of 50% of the services are provided by subcontractors (detailed list of any subcontractors planned, including their share of services).
Characteristic services are defined as those services to be provided by the key personnel in accordance with the Award Criteria (Project Manager Project Author Construction, Dep. Project Manager Project Author Construction). The key personnel must compulsorily be provided by the main tenderer.
In accordance with Art. 56 para. 1 of the Federal Act on Public Procurement (BöB), an appeal against this ruling can be lodged in writing within 20 days of its notification to the Federal Administrative Court, P.O. Box, 9023 St. Gallen. The appeal must be submitted in duplicate and must contain the requests, the grounds for them with the specification of evidence, as well as the signature of the appellant or their representative. A copy of this ruling and available evidence must be enclosed.
The provisions of the Federal Act on Administrative Procedure (VwVG) concerning the suspension of deadlines do not apply in accordance with Art. 56 para. 2 BöB.
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.
The Federal Roads Office ASTRA is procuring engineering and local construction management services for the comprehensive and coordinated renovation of seven structures on the N07 national road between Frauenfeld and …
Continue with ProWith Pro you see the whole summary, each statement with the verbatim quote from the publication.
Sign in. New companies use Pro for the first 30 days.
15 awards, bids (median): 3. Median award price CHF 769’541, middle half CHF 461’639 to CHF 1’297’149.
Awards: Civil and structural engineeringMachine-translated
12 days left
Machine-translated
1 day left
Machine-translated
2 days left
Machine-translated
3 days left