All tenders
Open · 6 days left
  • Construction and installation

MP-070054, N01-54/55 UPlaNS St.Gallen West - St.Gallen East (signage part): TP411, supply, assembly, installation and connection of tunnel safety equipment signage

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
17.11.2026, 23:596 days left
Type
Construction and installation
Procedure
Open procedure
Site visit
Not mandatory

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Tight deadlineNote

    6 days left to submit. Plan documents, proofs and delivery now.

    From «Submission deadline»

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • References requiredNote

    For eligibility you need comparable reference projects. Check number, age and size.

    Technische Leistungsfähigkeit Für Anbieter: 1 Referenzobjekt über abgeschlossene Arbeiten mit vergleichbarer Komplexität und aus dem gleichen Fachbereich. From «Eligibility criteria»

4 more notes
  • Securities per contractGood to know

    Whether a surety or guarantee is needed is set out in the contract or the documents. Check there.

    Gemäss Ziffer 5 der vorgesehenen Vertragsurkunde. From «Securities and guarantees»

  • Subcontracting limitedGood to know

    The publication limits subcontracting, for example by share or by requiring consent.

    Subunternehmer können zu max. 70% beigezogen werden. From «Subcontractors»

  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    Pauschal- und Globalangebote und/oder Angebote mit Zeitmitteltarif werden ausgeschlossen. From «Variants»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Language of the publication

Lieferung und Montage Sicherheitseinrichtung Tunnel im NS-Perimeter N01-54. Angebot und Realisierung der vorliegenden Ausschreibung TP411 für die Sicherheitseinrichtungen Tunnel erfolgt gemäss Leistungsverzeichnis.

Das TP411 umfasst alle Signalisationen der Sicherheitseinrichtungen in den Tunnels Rosenberg, Schoren, Stephanshorn, St. Fiden sowie in der Galerie Lindental Harzbüchel. Dies beinhaltet bei den SOS-Nischen 54 Stk. innen ausgeleuchtete SOS-Signale und 54 Stk. 4-sprachige SOS-Hinweistafeln. Bei den Notausgängen sind es 38 Stk. grüne Balken inklusive Blitzleuchten (links + rechts) und 38 Stk. innen ausgeleuchtete Fluchtwegsignale.

Die Erschliessung der SOS-Signale erfolgt ab den Alarmkästen (AK) oder WELK-Kabinen der jeweiligen SOS-Nischen. Die Erschliessung der Signalisation Fluchtwegtüren erfolgt direkt ab der Lokalsteuerung (LS) Signalisation der zugeordneten Tunnelzentrale.

Die SOS-Signale, die Notausgang-Signale und die grünen Balken leuchten im Dauerbetrieb und werden nicht geschaltet. Die in den grünen Balken integrierten Blitzleuchten werden im Endzustand von der LS Signalisation über die Tunnelreflexe angesteuert. Bis die neue LS Signalisation in Betrieb ist, allerdings noch wie bisher, über die LS Divers.

Die Schnittstelle zu der Signalisation Sicherheitseinrichtungen Tunnels befindet sich für die SOS-Signale bei den Abgangsklemmen im jeweiligen AK oder WELK-Kabine, bei den Fluchtwegtüren bei den Abgangsklemmen der LS Signalisation.

Sämtliche Dienstleistungen (Arbeiten erfolgen gem. Vorgehensplanung. Details gem. Spezifikationen) für das TP411 sind Bestandteil des Auftrags, Zusammenfassung (nicht abschliessend, siehe auch Spezifikationen):

  • Realisierungspflichtenheft, technische Bearbeitung/Engineering ganze Anlage, Ausführungsunterlagen, Installationsplanung etc.
  • Montage, Inbetriebnahmen, Abnahmen, Mitarbeit (Monteur) für weitere Abnahmen des UN TP401 (BZ- und Fkt.-Test vor Ort, tech. Abnahmen mit speziellen Verk.-Führungen, SAT)
  • sämtliche notwendigen Dienstleistungen inkl. allfällige Provisorien und Probebetrieb
  • Rückbau, Demontage und Entsorgung alte Signalisation Sicherheitseinrichtung
  • Projektbesprechungen in St.Gallen und/oder Winterthur
  • Bereinigte Gesamtdokumentation und Garantieleistungen.

Der Unternehmer übernimmt die Schulung/Instruktion der Mitarbeiter der Unterhaltsdienste gemäss Leistungsverzeichnis und Pos. 781.700 der BB BSA.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • OAG 1.11 – Transport
  • OAG 2.1 – Road and pathway
  • OAG 3.3 – Cut-and-cover and underground works
CPV
  • CPV 31720000 – Electromechanical equipment
  • CPV 34996000 – Control, safety or signalling equipment for roads
Options
Not provided for
Variants
Not admitted

Pauschal- und Globalangebote und/oder Angebote mit Zeitmitteltarif werden ausgeschlossen.

Partial offers
Not admitted

Die Angebote sind vollständig ausgefüllt einzureichen. Abänderungen am Angebotstext sind nicht zulässig. Teilangebote sind ungültig und scheiden aus der Bewerbung aus.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
29.09.2026
Questions untilpast
16.10.2026

Fragen sind in deutscher Sprache unter www.simap.ch im "Forum" einzureichen. Sie werden bis am 28.10.2026 allen Bezügern der Ausschreibungsunterlagen gleichlautend unter www.simap.ch im "Forum" beantwortet. Nach dem 16.10.2026 eintreffende Fragen werden nicht mehr beantwortet.

Submission deadlinenext
17.11.2026, 23:59
Opening of bids
20.11.2026, not public
Bid valid
180 days after the deadline

180 Tage ab Schlusstermin für den Eingang der Angebote.

Contract
01.02.2027 to 30.04.2029
Execution
01.09.2027 to 30.04.2029

Site visit

Note of the contracting authority (date, time and place as published)

Es findet keine Begehung statt.

Submission & documents

The tender names 2 routes. We submit nothing for you.

  • By post or delivery in person

    Bundesamt für Strassen ASTRA - Filiale WinterthurGrüzefeldstrasse 418404 Winterthur

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

  • Special submission route

    Es sind zwei (2) Exemplare des Angebots (der Angebotsunterlagen) in Papierform mit Originalunterschriften einzureichen. Zusätzlich ist das Angebot in elektronischer Form (z.B. auf USB-Stick) einzureichen. Dabei hat es aus einer einzigen PDF-Datei zu bestehen, welche das gesamte physische Angebot umfasst. Einzig Dateien in Spezialformaten sind von dieser Regelung ausgenommen und können separat (nebst dem PDF-File) eingereicht werden.

    Einreichung auf dem Postweg:

    A-Post oder PostPac Priority (Datum Poststempel einer Schweizerischen oder staatlich anerkannten ausländischen Poststelle; Firmenfrankaturen gelten nicht als Poststempel). Die Anbieter bzw. der Anbieter hat in jedem Fall den Beweis für die Rechtzeitigkeit der Angebotseinreichung sicherzustellen. Verspätete Angebote werden nicht mehr berücksichtigt. Auf dem Couvert ist neben der Projektbezeichnung deutlich der Vermerk "Nicht öffnen - Offertunterlagen" anzubringen.

    Persönliche Abgabe:

    Die Abgabe hat bis spätestens am oben erwähnten Abgabetermin während den Öffnungszeiten der Loge (07:45 - 11:45 Uhr und 13:15 - 16:45 Uhr (Freitag bis 16:00 Uhr)) gegen Ausstellung einer Empfangsbestätigung zu erfolgen.

    Übergabe an eine diplomatische oder konsularische Vertretung der Schweiz:

    Ausländische Anbieter können ihr Angebot bis spätestens am oben erwähnten Abgabetermin einer diplomatischen oder konsularischen Vertretung der Schweiz in ihrem Land, während den Öffnungszeiten gegen Ausstellung einer Empfangsbestätigung, übergeben.

    Die Anbieter sind in diesem Fall verpflichtet, die Empfangsbestätigung vor dem Abgabetermin per E-Mail der Beschaffungsstelle zu senden.

    Auf Angebote, die per E-Mail oder Fax zugestellt werden, wird nicht eingetreten!

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

5 eligibility criteria
  1. EK 1

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Technische Leistungsfähigkeit

    Evidence

    Für Anbieter: 1 Referenzobjekt über abgeschlossene Arbeiten mit vergleichbarer Komplexität und aus dem gleichen Fachbereich.

  2. EK 2

    TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.

    Wirtschaftliche Leistungsfähigkeit

    Evidence

    Für Anbieter: Jahresumsatz Anbieter > doppelter Jahresumsatz des Auftrages.

  3. EK 3

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Erfahrung, Fachkenntnis, Referenz der Schlüsselperson Projektleiter und Montageleiter

    Evidence

    Für Anbieter: 1 Referenzobjekt über abgeschlossene Arbeiten in gleichwertiger Funktion oder Stv.-Funktion mit vergleichbarer Komplexität und aus dem gleichen Fachbereich für die Schlüsselpersonen Projektleiter und Montageleiter.

  4. EK 4

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Verfügbarkeit Schlüsselperson Projektleiter und Montageleiter

    Evidence

    Nachweis der erforderlichen Verfügbarkeit der Schlüsselperson (Projektleiter „PL“ und Montageleiter «ML») während den ersten 24 Monaten des Projekts. Detaillierte Aufzählung und Darstellung der zeitlichen Belastung an den übrigen, relevanten Projekten.

  5. EK 5

    TEXFY assessment: What this means: Subcontracting – how much of the work you may pass on to other companies.

    Maximaler Anteil Leistungen durch Subunternehmer

    Evidence

    Nachweis, dass max. 70% der Leistung durch Subunternehmer erbracht werden.

Note of the contracting authority

Alle wirtschaftlich und technisch leistungsfähigen Firmen, die zudem die nachfolgenden Eignungsnachweise erbringen, sind aufgerufen, ein Angebot in CHF zu unterbreiten.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK 1

    40 %Price criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Preis

  2. ZK 2

    30 %

    TEXFY assessment: What this means: Schedule – whether your timetable meets the deadlines and is realistic.

    Qualität Ausrüstungen und Ausführungen. Unterteilt in:

    • ZK2.1 Auftragsanalyse und Vorgehensvorschlag: 15%
    • ZK2.2 Technische Auslegung und Qualität der angebotenen Anlagen, eingesetzte Produkte: 10%
    • ZK2.3 Bauprogramm/Terminplanung: 5%
  3. ZK 3

    30 %

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Unterteilt in:

    • ZK3.1 Erfahrungen/Fachkenntnisse und Referenzen Schlüsselpersonen. Projektleiter 10%, Montageleiter 5%
    • ZK3.2 Projektorganisation Anbieter 10%
    • ZK3.3 Risikobeurteilung mit den dazugehörigen Massnahmen 5%
Note of the contracting authority

Die Angaben betreffend Zuschlagskriterien müssen zusammen mit den (vorgegebenen) Angebotsunterlagen eingereicht werden:

Preisbewertung

Das tiefste bereinigte Angebot erhält die maximale Note (5). Angebote, deren Preis 50% oder mehr über dem tiefsten Angebot liegen, erhalten die Note 0. Dazwischen erfolgt die Bewertung linear (auf 2 Stellen nach dem Komma gerundet). Allfällig offerierte Skonti werden bei der Bewertung des Preises nicht berücksichtigt.

Benotung der übrigen Zuschlagskriterien

Die Bewertung erfolgt immer mit Noten von 0 bis 5:
0 = Nicht beurteilbar; keine Angabe

1 = Sehr schlecht erfüllt; ungenügende, unvollständige Angaben

2 = Schlecht erfüllt; Angaben ohne ausreichenden Projektbezug

3 = Erfüllt, den Anforderungen der Ausschreibung entsprechend

4 = Gut erfüllt; Qualitativ gut

5 = Sehr gut erfüllt; Qualitativ ausgezeichnet, sehr grosser Beitrag zur Zielerreichung

Sofern ein Hauptkriterium aus Subkriterien besteht, werden diese benotet. Die Punktzahl des Hauptkriteriums ergibt sich aus der Summe der Noten der Subkriterien multipliziert mit ihrer Gewichtung.

Punkteberechnung: Summe aller Noten multipliziert mit ihrer Gewichtung (Maximalpunktzahl: Note 5 x 100 = 500 Punkte).

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

12 conditions
Bidding consortia
Allowed

Zugelassen. Die Federführung muss einem Unternehmen der Bietergemeinschaft übertragen werden. Die weiteren Beteiligten sind in den Angebotsunterlagen bekannt zu geben. Mitglieder der Bietergemeinschaft dürfen nach Eingabe der Offerte nicht ausgewechselt werden.

Subcontractors
Allowed

Zugelassen. Subunternehmer können zu max. 70% beigezogen werden. Sie sind in den Angebotsunterlagen entsprechend aufzuführen. Angaben betreffend Subunternehmern werden mitbewertet. Die charakteristische Leistung ist grundsätzlich vom Auftragnehmer zu erbringen.

Contract extension
Possible

Eine Verlängerung erfolgt abhängig von der Verfügbarkeit der Kredite, des Projektfortschrittes, allfälligen Projektänderungen, der Zustimmung in Linie und nicht zuletzt von der Qualität der bereits erbrachten Leistungen.

Dialogue
Not provided for
Securities and guarantees

Gemäss Ziffer 5 der vorgesehenen Vertragsurkunde.

Terms of payment

45 Tage nach Rechnungseingang im ASTRA.

Costs included in the bid price

Die Vergütung und die Preise umfassen sämtliche Leistungen, die in den Ausschreibungsunterlagen genannt und zur Vertragserfüllung notwendig sind.

Die Umlagerung von Einheitspreisen in Globalpositionen wie zum Beispiel die Baustelleneinrichtungen ist strikt verboten.

Der Unternehmer hat alle Positionen des Leistungsverzeichnisses auszufüllen; er schreibt „0“ bei allen Positionen, bei welchen er formell auf die Angabe eines Betrags sowie darauf verzichtet, später eine Vergütung für die betreffende Leistung zu verlangen. Ein solcher Eintrag muss im technischen Bericht begründet werden.

Die Aufsichts- und Führungskosten sowie die Kosten des Zeitaufwands für den Personaltransport dürfen nicht in den Baustelleneinrichtungskosten enthalten sein, sondern müssen gemäss Kalkulationsschema des SBV in den Einheitspreisen enthalten sein.
Gleichermassen müssen alle Endkostenzuschläge wie beispielsweise die technische und die kaufmännische Leitung, die Baustellenführung sowie die Finanzkosten im Kalkulationsschema des SBV in den entsprechenden Rubriken erfasst sein. Diese Kosten dürfen auf keinen Fall in den Baustelleneinrichtungen enthalten sein.

Terms and conditions

Gemäss vorgesehener Vertragsurkunde.

Other requirements

1. Vorbehalten bleiben die Beschaffungsreife des Projektes sowie die Verfügbarkeit der Kredite;
2. Die Erarbeitung der Angebote wird nicht vergütet. Die Angebotsunterlagen werden nicht zurückgegeben;

3. Ausschreibungsunterlagen sind in deutscher Sprache erhältlich. Bei Widersprüchen zwischen den Fassungen ist die deutsche Version massgebend.

4. Angebote der Firma Sensor Elektronic GmbH, Adlikerstrasse 79, 8105 Regensdorf oder Angebote, an welchen sich die Sensor Elektronic GmbH in irgendeiner Weise beteiligt, sei es in Bietergemeinschaft, sei es als Subunternehmerin oder Lieferantin, werden gestützt auf Art. 44 Abs. 1 lit. h BöB vom Beschaffungsverfahren ausgeschlossen.

5. Angebote der Einzelunternehmung Marcel Gurtner Automation, Udelbodenstrasse 9, 6014 Luzern oder Angebote, an welchen sich die Einzelunternehmung Marcel Gurtner Automation in irgendeiner Weise beteiligt, sei es in Bietergemeinschaft, sei es als Subunternehmerin oder Lieferantin, werden gestützt auf Art. 44 Abs. 1 lit. h BöB vom Beschaffungsverfahren ausgeschlossen.

Previously involved bidders

Keine.

Bidders from states outside the WTO agreement

Keine.

Further information on the conditions

Gemäss Ausführungen im Lastenheft.

Documents to submit

Only evidence that the publication itself names. This evidence belongs in the bid. The tender documents may ask for more.

5 pieces of evidence according to the publication
  • Suitability · EK 1

    Für Anbieter: 1 Referenzobjekt über abgeschlossene Arbeiten mit vergleichbarer Komplexität und aus dem gleichen Fachbereich.

  • Suitability · EK 2

    Für Anbieter: Jahresumsatz Anbieter > doppelter Jahresumsatz des Auftrages.

  • Suitability · EK 3

    Für Anbieter: 1 Referenzobjekt über abgeschlossene Arbeiten in gleichwertiger Funktion oder Stv.-Funktion mit vergleichbarer Komplexität und aus dem gleichen Fachbereich für die Schlüsselpersonen Projektleiter und Montageleiter.

  • Suitability · EK 4

    Nachweis der erforderlichen Verfügbarkeit der Schlüsselperson (Projektleiter „PL“ und Montageleiter «ML») während den ersten 24 Monaten des Projekts. Detaillierte Aufzählung und Darstellung der zeitlichen Belastung an den übrigen, relevanten Projekten.

  • Suitability · EK 5

    Nachweis, dass max. 70% der Leistung durch Subunternehmer erbracht werden.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
44627
Publication number
44627-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Verfügung kann gemäss Art. 56 Abs. 1 des Bundesgesetzes über das öffentliche Beschaffungswesen (BöB) innert 20 Tagen seit Eröffnung schriftlich Beschwerde beim Bundesverwaltungsgericht, Postfach, 9023 St. Gallen, erhoben werden. Die Beschwerde ist im Doppel einzureichen und hat die Begehren, deren Begründung mit Angabe der Beweismittel sowie die Unterschrift der beschwerdeführenden Person oder ihrer Vertretung zu enthalten. Eine Kopie der vorliegenden Verfügung und vorhandene Beweismittel sind beizulegen.
Die Bestimmungen des Verwaltungsverfahrensgesetzes (VwVG) über den Fristenstillstand finden gemäss Art. 56 Abs. 2 BöB keine Anwendung.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in St. Gallen: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.