All tenders
Open · 19 days left
  • Supply

API Management System

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
Stadt St.Gallen, Stadtwerke
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
30.11.2026, 12:0019 days left
Type
Supply
Procedure
Open procedure
Award weighting
In the documents
Eligibility
4 criteria
Site visit
Not stated

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • No bidding consortiumNote

    A joint bid with other companies is not allowed.

    From «Bidding consortia»

  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    From «Variants»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Language of the publication

The following objectives are to be achieved through the API Management Solution procurement project:

  1. Procure a standardized API management system that meets the requirements of all use cases across the OT-OT, OT-IT, IT-IT, and IT-Public domains. The rollout shall be carried out incrementally, starting with the OT environment and the OT-IT transition. The additional IT and IT Public Gateway environments shall be available as optional orderable extensions.
  2. The integration of web interfaces shall provide logical decoupling between requesting and source systems, while ensuring that systems are protected against unauthorized access and excessive traffic through authentication, authorization, and appropriate security mechanisms.
  3. The new partner shall support sgsw flexibly and according to operational needs, both during the implementation phase and throughout the subsequent years of operation.
  4. The IT-OT transition implemented via the API management solution shall be designed in such a way that it can be centrally deactivated, if required, using a small number of predefined steps (discrete OT environment).

A comprehensive API management solution shall be procured and implemented in phases, separated by system environment:

  • OT Environment (initial scope of supply)
  • IT-OT Transition (initial scope of supply)
  • IT Environment (option / extension without any acceptance guarantee)
  • IT Public Gateway (option / extension without any acceptance guarantee)

As part of this software procurement, the API management solution shall support scalable licensing that can grow in line with demand (flexible/tiered licensing model within the respective system environments). No hardware procurement is envisaged. The central components are described below.

Key facts, codes and options

Type of contract
Supply
Type of supply
Contract for work
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 48219100 – Gateway software package
Options
Provided for

Die Optionen sind im Preisblatt sowie in der Technischen Spezifikation explizit vermerkt.

Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
21.10.2026
Documents available
21.10.2026 to 30.11.2026
Questions untilpast
04.11.2026

Es werden ausschliesslich auf simap.ch eingereichte Fragen beantwortet.

Submission deadlinenext
30.11.2026, 12:00
Opening of bidsnext
30.11.2026, not public
Bid valid
365 days after the deadline
Contract
Term 1827 days
Execution
01.06.2027 to 31.12.2027

Special deadlines and formal requirements

Massgebend ist das Datum des Eintreffens bei der Eingabeadresse und nicht der Poststempel.

Submission & documents

According to the simap data. We submit nothing for you.

  • By post or delivery in person

    Stadt St.Gallen, StadtwerkeGino ScottoVadianstrasse 89001 St.Gallen

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German, English
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

In the documents according to the source: Content only in the tender documentsIn the tender documents: Award criteria, Conditions of participation, Documents to submit.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

4 eligibility criteria
  1. EK 1

    TEXFY assessment: What this means: Subcontracting – how much of the work you may pass on to other companies.

    Die Anbieterin bestätigt, dass mindestens 6 Fachexperten für die API-Management-Lösung für die Lösung (inkl. allfälliger Subunternehmer) angestellt sind.

  2. EK 2

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Die Anbieterin bestätigt, dass mindestens 2 Projektleiter mit Erfahrung in der Lösung (inkl. allfälliger Subunternehmer) angestellt sind.

  3. EK 3

    TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.

    Die Anbieterin bestätigt, dass eine Haftpflichtversicherung gegen Haftpflichtansprüche für mindestens 5 Mio. CHF pro Schadensfall abgeschlossen ist.

  4. EK 4

    TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.

    Wirtschaftliche und finanzielle Leistungsfähigkeit

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

6 conditions
Bidding consortia
Not allowed
Subcontractors
Allowed
Contract extension
Not provided for
Dialogue
Not provided for
Terms and conditions

Allgemeine Geschäftsbedingungen für IKT-Leistungen der Digitalen Verwaltung Schweiz. Siehe Dokument B.04 AGB-IKT-Leistungen-2025-DE.pdf

Other requirements

Die Prüfung und Bewertung der Angebote erfolgen zweistufig. Siehe Pflichtenheft Kapitel 5.5.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
46061
Publication number
46061-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Verfügung kann innert 20 Tagen seit Publikation auf www.simap.ch beim Verwaltungsgericht des Kantons St.Gallen, Webergasse 8, 9001 St.Gallen, schriftlich Beschwerde erhoben werden (Art. 52 Abs. 1 i.V.m. Art. 56 der Interkantonalen Vereinbarung über das öffentliche Beschaffungswesen [sGS 841.51]). Die Frist ist eingehalten, wenn die Beschwerde spätestens am letzten Tag der Frist beim Gericht eingereicht oder zu dessen Handen der Schweizerischen Post oder einer schweizerischen diplomatischen oder konsularischen Vertretung übergeben wird (Art. 143 Abs. 1 der Schweizerischen Zivilprozessordnung [SR 272] i.V.m. Art. 30 Abs. 1 des Gesetzes über die Verwaltungsrechtspflege [sGS 951.1]). Die Beschwerde muss einen Antrag sowie eine Darstellung des Sachverhaltes und eine Begründung enthalten. Sie ist zu unterzeichnen und im Doppel einzureichen. Diese Verfügung ist beizulegen. Es gelten keine Gerichtsferien.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in St. Gallen: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.