- Construction and installation
- NPK 111 Daywork
- NPK 112 Testing and inspection
- +11
Assainissement,aménagement de surface et végétalisation du chemin des Hutins
- Procuring office
- Commune de Confignon
At a glance
- 08.12.2026, 11:0027 days left
- Construction and installation
- Open procedure
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in French.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
What is being procured?
Scope of work
Travaux supervisés par T-Ing – Assainissement et IPR (SIG)
· La Commune de Confignon projette de réfectionner son réseau d’assainissement, EU et EP, sur le tronçon cité en référence.
Le rapport d’exploitation de SIG et la fiche action du PGEE ont relevé de nombreux défauts ou insuffisances sur ce tronçon.
Les travaux prévus dans le cadre de cette autorisation consistent au changement des deux collecteurs sur l’ensemble du tronçon.
Les regards et quelques sacs de route seront également reconstruits.
· Des travaux sont également prévus pour le changement de la conduite d’eau et la pose d’une batterie électrique avec deux armoires de distribution.
Travaux supervisés par iDTech – Aménagement et plantations
· La commune profite également de ces travaux pour réaménager le chemin entièrement avec reprises des bordures, ilots limite de propriété, fosse de Stockholm avec gestion différenciée des eaux de surface et plantations d’arbres. Ces travaux font l’objet d’une autorisation spécifique et piloté par le bureau IDTech. Ils prendront le relai des séances de chantier à la fin des travaux d’assainissement.
· Des travaux de dévoiement d’un tronçon de la conduite de gaz existante sont prévus ainsi que les raccords privés ainsi que la réalisation du nouveau réseau d’éclairage du chemin.
Globalement
· Les travaux devraient démarrer à la fin du 1er semestre 2027 et dépendent du vote du crédit du conseil municipal basé sur le retour des offres.
L’accès aux propriétés à pied doit être maintenu en tout temps.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 111 – Daywork
- NPK 112 – Testing and inspection
- NPK 113 – Site establishment
- NPK 116 – Felling and site clearance
- NPK 117 – Demolition and dismantling
- NPK 151 – Construction works for utility mains
- NPK 181 – Garden and landscape architecture
- NPK 211 – Excavation and earthworks
- NPK 221 – Sub-bases for transport routes
- NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
- NPK 223 – Asphalt and concrete pavements
- NPK 237 – Drainage and sewer systems
- NPK 286 – Markings for traffic areas
- CPV
- CPV 45200000 – Works for complete or part construction and civil engineering work
- CPC
- CPC 60178cd7-4296-4b50-8d27-9d825020767c – Construction work for civil engineering
- Options
- Provided for
L'adjudication des travaux comprendra obligatoirement les trois lots:
assainissement cahier T, aménagement et végétalisation ID Tech
SIG - Variants
- Admitted
Voir document k2
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 10.11.2026
- Questions untilnext
- 19.11.2026
- Submission deadline
- 08.12.2026, 11:00
- Bid valid
Selon document k2
- Execution
Voir document de l'appel d'offre. Démarrage fin du premier semestre 2027
Site visit
L'entrepreneur est libre de se rendre sur place afin de constater les accès, l'exiguïté des lieux et la zone d'installation mise à disposition par la Commune.
Submission & documents
By post or delivery in person
Commune de ConfignonWalter BritoPromenade des Rêveries 21232 ConfignonSource: simap data
- Documents on simap.ch (after signing in)
- French
- French
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Conditions of participation, Documents to submit.
Participation & suitability
Voir document k2
Award criteria
Prix
30 %Price criterion
TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.
Montant de l'offre en rapport avec le cahier des charges (T200)
Qualité technique de l'offre
20 %
TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.
Annexe R14 (degré de compréhension du cahier des charges et des prestations à exécuter),
Annexe R15 (nombre et qualifications des sous-traitants prévus pour l’exécution du marché).
Références
30 %
TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.
Annexe Q9 ((liste de références de travaux de construction)
Les références proposées par le candidat devront au minimum proposer la réalisation des travaux suivants :
Réalisation des travaux de réaménagement de rues, avec une attention particulière portée à la réalisation de fosses de plantation de type Stockholm et à la gestion et à la valorisation des eaux de ruissellement,
Réalisation d’aménagements routiers avec revêtements bitumineux et dallages en béton désactivé,
Réalisation de réseaux enterrés : assainissement et distribution,
Les références devront présenter une échelle de prix similaire et cohérentes avec le projet, devront être réalisées / finalisées dans les 5 et 10 dernières années.
Organisation pour l'exécution du marché
15 %
TEXFY assessment: What this means: Organisation – how your company and team are set up for the contract.
Annexe R6+Q4 (nombre, planification et disponibilité des moyens et des ressources pour l’exécution du marché),
Annexe R8 (répartition des tâches et des responsabilités pour l’exécution du marché),
Annexe R9 (qualifications des personnes-clés désignées pour l’exécution du marché).
Formation des apprentis
5 %
TEXFY assessment: What this means: Training – whether your company trains apprentices.
Annexe R21
Conditions
5 conditions
- Bidding consortia
- Allowed
voir article 8.10 du document k2
- Subcontractors
- Allowed
- Contract extension
- Not provided for
- Dialogue
- Not provided for
- Further information on the conditions
Voir document k2
Official source
- simap project number
- 42881
- Publication number
- 42881-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
Le présent appel d’offres peut faire l’objet d’un recours auprès de la Chambre administrative de la Cour de justice, 10 rue Saint-Léger, case postale 1956, 1211 Genève 1, dans les dix jours dès sa publication. Le recours doit être signé, se référer au présent appel d'offres, contenir les conclusions dûment motivées avec indication des moyens de preuve.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.