- Construction and installation
- NPK 111 Daywork
- NPK 112 Testing and inspection
- +11
Sanitation, surface landscaping and greening of the Chemin des Hutins
- Procuring office
- Commune de Confignon
At a glance
- 08.12.2026, 11:0027 days left
- Construction and installation
- Open procedure
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in French.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
What is being procured?
Scope of work
Works supervised by T-Ing – Sanitation and IPR (SIG)
· The Municipality of Confignon plans to renovate its sanitation network, WW and SW, on the section mentioned for reference.
The SIG operation report and the PGEE action sheet noted numerous defects or insufficiencies on this section.
The works planned under this authorization consist of replacing the two collectors along the entire section.
Manholes and some road gullies will also be rebuilt.
· Works are also planned for replacing the water pipe and installing an electrical battery with two distribution cabinets.
Works supervised by iDTech – Landscaping and plantings
· The municipality also takes advantage of these works to completely redesign the path with reconstruction of kerbs, property boundary islands, Stockholm tree pits with differentiated surface water management, and tree planting. These works are subject to a specific authorization and managed by the IDTech office. They will take over the site meetings at the end of the sanitation works.
· Diversion works for a section of the existing gas pipe are planned, as well as private connections and the construction of the path's new lighting network.
Overall
· The works are expected to start at the end of the 1st semester of 2027 and depend on the municipal council's credit vote based on the returned bids.
Pedestrian access to properties must be maintained at all times.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 111 – Daywork
- NPK 112 – Testing and inspection
- NPK 113 – Site establishment
- NPK 116 – Felling and site clearance
- NPK 117 – Demolition and dismantling
- NPK 151 – Construction works for utility mains
- NPK 181 – Garden and landscape architecture
- NPK 211 – Excavation and earthworks
- NPK 221 – Sub-bases for transport routes
- NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
- NPK 223 – Asphalt and concrete pavements
- NPK 237 – Drainage and sewer systems
- NPK 286 – Markings for traffic areas
- CPV
- CPV 45200000 – Works for complete or part construction and civil engineering work
- CPC
- CPC 60178cd7-4296-4b50-8d27-9d825020767c – Construction work for civil engineering
- Options
- Provided for
The award of the works will obligatorily include all three lots:
sanitation T specification, landscaping and vegetation ID Tech SIG - Variants
- Admitted
See document k2
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 10.11.2026
- Questions untilnext
- 19.11.2026
- Submission deadline
- 08.12.2026, 11:00
- Bid valid
According to document k2
- Execution
See call for tenders document. Start at the end of the first semester of 2027
Site visit
The contractor is free to visit the site in order to check the accesses, the cramped nature of the premises, and the installation area made available by the Municipality.
Submission & documents
By post or delivery in person
Commune de ConfignonWalter BritoPromenade des Rêveries 21232 ConfignonSource: simap data
- Documents on simap.ch (after signing in)
- French
- French
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Conditions of participation, Documents to submit.
Participation & suitability
See document k2
Award criteria
Price
30 %Price criterion
TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.
Amount of the bid in relation to the specifications (T200)
Technical quality of the bid
20 %
TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.
Appendix R14 (degree of understanding of the specifications and services to be performed),
Appendix R15 (number and qualifications of subcontractors planned for the execution of the contract).
References
30 %
TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.
Appendix Q9 (list of references for construction works)
The references proposed by the candidate must at least propose the execution of the following works:
Execution of street redevelopment works, with particular attention paid to the creation of Stockholm-type planting pits and the management and enhancement of runoff water,
Execution of road developments with bituminous surfacings and exposed aggregate concrete paving,
Execution of underground networks: sanitation and distribution,
The references must present a price scale similar and consistent with the project, and must have been carried out / finalized within the last 5 and 10 years.
Organization for the execution of the contract
15 %
TEXFY assessment: What this means: Organisation – how your company and team are set up for the contract.
Appendix R6+Q4 (number, planning, and availability of means and resources for the execution of the contract),
Appendix R8 (distribution of tasks and responsibilities for the execution of the contract),
Appendix R9 (qualifications of key personnel designated for the execution of the contract).
Training of apprentices
5 %
TEXFY assessment: What this means: Training – whether your company trains apprentices.
Appendix R21
Conditions
5 conditions
- Bidding consortia
- Allowed
see article 8.10 of document k2
- Subcontractors
- Allowed
- Contract extension
- Not provided for
- Dialogue
- Not provided for
- Further information on the conditions
See document k2
Official source
- simap project number
- 42881
- Publication number
- 42881-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
This call for tenders may be appealed to the Administrative Chamber of the Court of Justice, 10 rue Saint-Léger, PO Box 1956, 1211 Geneva 1, within ten days of its publication. The appeal must be signed, refer to this call for tenders, and contain duly substantiated conclusions indicating the means of proof.