Tender, extract

Smart Metering System (iMS) – Zuzwil

Contracting authority
Politische Gemeinde Zuzwil (IBG Engineering AG)
Place
Canton SG
Submission deadline
28.01.2027, 11:30
Published
20.11.2026
Procedure
Open procedure
Type
Supply
Project number
47915
CPV code
38551000 Energy meters
Languages of the bid
German

Description

The contract covers the supply, implementation and commissioning of a smart metering system (iMS) for the Zuzwil Electricity Utility.

The scope of supply and services comprises an integrated solution consisting of:

  • Smart meters for direct metering and transformer-operated metering at low and medium voltage
  • A head-end system (HES) delivered as software as a service (SaaS)
  • A key management system (KMS)
  • The required communications components and modules
  • The interfaces required for integration with the contracting authority’s existing systems
  • Project planning, migration, training, commissioning and support services

The solution must integrate with the Zuzwil Electricity Utility’s existing systems, including innosolvenergy and ZRM, as well as with a future work order management solution. Data exchange with the meter data management system (ZRM) must take place via the HES connector in accordance with IEC 61968-9.

The communications solution must primarily use the contracting authority’s existing fibre-to-the-home (FTTH) infrastructure. Alternative communications solutions are permitted for sites with special requirements. Gateway-based communications solutions are expressly permitted.

The tenderer will act as the single contractual point of contact and assume overall responsibility for supplying the smart metering hardware, providing the HES and KMS, integrating the systems and providing manufacturer support. The solution must be designed so that its day-to-day operation can be handled by a metering service provider appointed by the contracting authority.

The tender must also include the following options:

  • A load switching solution with at least two switching contacts and an option for expansion
  • Integration of water meters via wired M-Bus
  • Integration of water meters via wireless M-Bus

Dates

  • Questions until: 04.12.2026
  • Submission deadline: 28.01.2027, 11:30
  • Opening of bids: 29.01.2027