Goldach energy network: Energy center

Published in German. The texts of the publication are machine-translated (AI); only the original is binding. Show original

Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
23.12.2026, 23:5941 days left
Type
Service
Procedure
Open procedure
Eligibility
4 criteria
Site visit
Not stated

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • References requiredNote

    For eligibility you need comparable reference projects. Check number, age and size.

    Zu jedem Eignungskriterium (EK 1.1 bis EK1.5) ist eine entsprechende Referenz des Anbieters einzureichen. From «Eligibility criteria»

  • Securities per contractGood to know

    Whether a surety or guarantee is needed is set out in the contract or the documents. Check there.

    Gemäss vorgesehener Vertragsurkunde From «Securities and guarantees»

2 more notes
  • Online via simap onlyGood to know

    Bids are submitted on simap.ch; you need a bidder account there.

    From «Submission»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    Pauschal- und Globalangebote und/oder Angebote mit Zeitmitteltarif werden ausgeschlossen. From «Variants»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 12.11.2026, 08:09

What is being procured?

Scope of work

Language of the publication

The Regional Water Supply St. Gallen (RWSG) is currently constructing the new Riet II lakewater plant. As part of this project, the municipality of Goldach has the opportunity to make use of the new lake water intake and thereby establish a thermal network providing. Using large-scale heat pumps, lake water can be utilized as a renewable energy source to provide environmentally friendly heating for households, public buildings and commercial premises.

The project is divided into two sub-projects:

Sub-project 1 – Energy Centre

Sub-project 2 – Distribution Network

The contract covers SIA sub-phases 32 (construction project) to 53 (commissioning) for sub-project 1 – Energy Centre.

The general planner’s mandate comprises the following services and specialist areas:

- Overall management and coordination of specialist areas (including construction management)

- Chief site management

- BIM management

- Civil engineering, including specialised civil engineering

- Building construction/structural engineering

- Piping (heating/cooling), including building connections

- Architecture

- Landscape architecture

- Fire protection

- Plant engineering

- HVAC

- Electrical and low-voltage systems

- Building automation

- Building physics

- Geology

Key facts, codes and options

Type of contract
Service
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 71000000 – Architectural, construction, engineering and inspection services
  • CPV 71320000 – Engineering design services
  • CPV 71356000 – Technical services
Options
Not provided for
Variants
Not admitted

Global and lump-sum bids and/or bids with time-averaged rates are excluded.

Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
12.11.2026
Documents available
12.11.2026 to 30.04.2027
Questions untilnext
27.11.2026

Questions must be submitted via www.simap.ch in the "Forum" section of the respective tender. Answers will be provided in the same wording to all recipients of the tender documents via www.simap.ch in the "Forum" by 04.12.2026. Questions received after 27.11.2026 will no longer be answered.

Submission deadline
23.12.2026, 23:59
Opening of bids
05.01.2027, not public

The date of the bid opening is provisional. The bid opening is not public.

Bid valid
until 30.07.2027
Contract
01.04.2027 to 31.12.2030
Execution
01.04.2027 to 31.12.2030

Submission & documents

According to the simap data. We submit nothing for you.

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

Not given: The publication contains nothing on thisNot in the publication data: Documents to submit.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

4 eligibility criteria
  1. EK 1 Technical capability in the tendered disciplines (company references)

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    A corresponding reference from the tenderer must be submitted for each suitability criterion (EK 1.1 to EK 1.5). Several suitability criteria can be demonstrated by a single project, provided that the respective requirements are clearly evident. Alternatively, separate reference projects can be submitted for individual suitability criteria.

    The submitted company references must demonstrate services comparable to the tendered project in terms of task, state of the art and complexity, and must mandatorily fulfill the requirements listed below:

    EK1.1 Overall management / overall coordination (incl. construction management)

    - SIA partial phases 32-53

    - Project completion within the last 10 years

    - Total construction costs > CHF 3 million

    EK1.2 Civil engineering

    - SIA partial phases 32-53

    - Project completion within the last 10 years

    EK1.3 Building construction / structural engineering

    - SIA partial phases 32-53

    - Project completion within the last 10 years

    - Construction costs in the discipline > CHF 2 million

    - Volume > 3000 m³

    EK1.4 Plant engineering

    - SIA partial phases 32-53

    - Project completion within the last 10 years

    - New construction of a heat pump with a thermal output of more than 2 MW and

    a natural refrigerant

    - Boiler with a thermal output of more than 5 MW

    EK1.5 Geology

    - SIA partial phases 32-53

    - Project completion within the last 10 years

    For areas EK1.1-EK1.5, it is expected that SIA partial phases 32 to 53 are completed or have been realized in essential parts. If these requirements cannot be met by a single reference project, two references may be submitted which together cover all requested phases.

    The company references for EK1.2 - EK1.5 may come from a sub-planner. In this case, the tenderer must enclose a confirmation from the sub-planner stating that they will execute the work if awarded the contract.

  2. EK 2 Appropriate ratio of contract amount per year to the turnover of the relevant corporate unit (i.e. relevant division according to the present project) per year (max. 30%)

    TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.

    The average annual fee for this contract must not exceed 30% of the average annual turnover of the corporate unit or division responsible for the project.

    The calculation is made for all tenderers on the same basis:

    • Annual fee: Total offered fee including incidental costs and minus discount, excl. VAT, divided by three.
    • Average annual turnover: Sum of turnovers for the years 2023, 2024 and 2025, excl. VAT, divided by three.

    The annual turnovers must be stated in document C. In the case of planner consortia, the turnovers of the participating corporate units are added together for each year.

    The three years form the fixed calculation basis for this suitability assessment.

  3. EK 3 Sufficient proficiency in the BIM methodology

    TEXFY assessment: What this means: Approach – how you tackle the contract, described in a concept or an analysis of the task.

    1 project reference demonstrating experience with the BIM methodology in a comparable task. The project reference must have completed SIA phase 3.

    If the required reference comes from a sub-planner, the tenderer must enclose a confirmation from the sub-planner that they will execute the work if awarded the contract.

    The BIM platform is to be provided by the tenderer. The specification of the selected BIM platform must be enclosed with the bid and the details in document C2 must be filled out.

  4. EK 4 Organizational and financial capability

    TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.

    Signed self-declaration C1.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK 1 Price

    30 %Price criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Total fee and incidental costs incl. discount; the lowest bid receives the maximum grade; bids that are 100% or more above the lowest price receive 0 points; scoring between is linear

  2. ZK 2 Order and project analysis

    30 %

    TEXFY assessment: What this means: Approach – how you tackle the contract, described in a concept or an analysis of the task.

    Project challenges and opportunities;

    • Presentation of the 5 most significant project-specific challenges as well as possible measures to manage them, and the 2 biggest opportunities including their impact on the project (max. 1 DIN A4 page) (10%).

    Procedural planning and organization:

    • Presentation of the planned procedure, schedule risks and possible measures to mitigate them, as well as the planned organization including expected interfaces and BIM (max. 1 DIN A4 page + schedule + organization chart) (10%).

    Measures to promote sustainability and circular economy:

    • Identification of the most important ecological aspects in the project and presentation of innovative measures for their implementation (max. 1 A4 page) (10%).
  3. ZK 3 Competence of key personnel

    30 %

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Information on the education and professional experience of the designated key personnel:

    1 project reference with comparable complexity and task of the key person involved in the project. The specified references should essentially demonstrate the function, the main focus of tasks and the experience gained. The (partial) phases processed by the key person and specified as a reference must be completed. If the required references come from a sub-planner, the tenderer must enclose a confirmation from the sub-planner that they will execute the work if awarded the contract.

    German language skills (native language or at least language competence level C1)

    References must be provided for the following key personnel:

    • Overall management / coordination
    • Plant engineering specialist
    • Chief site manager
  4. ZK 4 Presentation

    10 %

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    With the designated key personnel, the tenderers present their order and project analysis. They also explain their reference projects and answer open questions from the client.

    If, after the evaluation of the submitted bids, there is no prospect of an award for tenderers, the awarding authority reserves the right not to invite these tenderers to the presentations. There is therefore no entitlement to a bid presentation.

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

9 conditions
Bidding consortia
Allowed

The lead management must be assigned to a company within the bidder consortium. The other participants must be announced in the tender documents. Members of the bidder consortium may not be replaced after submission of the bid.

Subcontractors
Allowed
Contract extension
Possible
Dialogue
Not provided for
Securities and guarantees

According to the intended contract document

Terms of payment

Payments are made exclusively in Swiss francs [CHF].
Payment term: 30 days

Terms and conditions

The undersigned tenderer confirms the correctness of the information provided and explicitly declares agreement with the present submission conditions. Information provided by the tenderer that runs counter to this declaration of consent (e.g. enclosed General Terms and Conditions [GTC]) is invalid and will not be accepted by the awarding authority.

Previously involved bidders

The companies HOLINGER AG, Lucerne, Contegra AG Integrale Planung, St. Gallen and RKL AG, St. Gallen have completed their assignment by preparing the preliminary project. The project documents substantially prepared by the above companies are enclosed with the tender documents. The ongoing services of Holinger in the Seewasserwerk Riet II project are excluded from the general planner mandate in accordance with B, Chapter 2.7.
Based on the above measures, HOLINGER AG, Lucerne, Contegra AG Integrale Planung, St. Gallen and RKL AG, St. Gallen are admitted as tenderers in the procedure (cf. Art. 14 IVöB).

EVU-Beratung AG participated in preparatory work for the transformer station on the project fundamentals. The results of this preparatory work that are relevant for the preparation of the tender are made available to all tenderers with the tender documents. Any potential information advantage is thereby offset. EVU-Beratung AG is admitted to the procedure.

The planning and tendering of the electrical installations in the transformer room in accordance with the spatial delimitation marked in Appendix F18 «P_H_EG_Trafo_Dispo_V4_250725» shall be provided by EVU-Beratung AG on the direct commission of TBG. These services are excluded from the present general planner mandate and are not to be included in the offered general planner fee.

The companies Morgenegg-Gervasi Architektur AG, Arbon and Ehle Wirth Architekten AG, St. Gallen have completed their assignment with the preparation of the preliminary project. They are admitted to the procedure as mandatory sub-planners.

Kobus und Partner GmbH, Leinfelden-Echterdingen 70771 Germany, prepared the model study on the impact of thermal use of lake water at the Riet lake water abstraction and has completed its mandate. Kobus und Partner GmbH has completed its mandate and the model study is fully enclosed with this tender (Appendix F15). Any potential information advantage is thereby offset. Kobus und Partner GmbH is admitted to the procedure.

Bidders from states outside the WTO agreement

Keine

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
47294
Publication number
47294-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Written appeal against this decision can be lodged within 20 days of publication on www.simap.ch with the Administrative Court of the Canton of St. Gallen, Webergasse 8, 9001 St. Gallen (Art. 52 para. 1 in conjunction with Art. 56 of the Intercantonal Agreement on Public Procurement [sGS 841.51]). The deadline is met if the appeal is submitted to the court or handed over to Swiss Post or a Swiss diplomatic or consular representation for forwarding on the last day of the deadline at the latest (Art. 143 para. 1 of the Swiss Civil Procedure Code [SR 272] in conjunction with Art. 30 para. 1 of the Act on Administrative Jurisdiction [sGS 951.1]). The appeal must contain a motion, a presentation of the facts and the reasons. It must be signed and submitted in duplicate. This decision must be enclosed. Court vacations do not apply.

Checked against simap: 12.11.2026, 08:09

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in St. Gallen: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.