Planned projects before they are put out to tender: large alpine PV plants with their permit status, transmission lines and rail expansions from the federal sectoral plans, building projects of the City of Zurich under construction, construction and planning credits of the parliaments, neighbourhood plans and urban projects in Geneva, planned public purchases in the French border region and at the SBB, SBB rail projects, Swissgrid grid projects, wastewater plants planning or building a micropollutant stage, the investment plans of Basel-Stadt and the City of Geneva, and the measures of the federal rail expansion and agglomeration programmes.
A project is not a tender. The clients decide whether, when and in which lots contracts are awarded; the tenders follow later, mostly on simap.ch.
Large private and semi-public buyers award many contracts by invitation only. Where to register as a supplier: Supplier portals
- Agglomeration programmePlannedZurich
Zürich – Bahnhof Altstetten - Personenunterführung und Veloabstellplätze
Amount in the plan: CHF 50’000’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 43, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Beschaffung Batterie-Busse und Batterie-Trolleybusse
Amount in the plan: CHF 20’600’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Franca-Magnani-Brücke (Verbindung Stadtkreise 4 und 5 / Netzlückenschliessung Hauptrouten Velo)
Amount in the plan: CHF 80’000’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Hardturmstrasse – Umgestaltung Strassenraum
Amount in the plan: CHF 17’850’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 42, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Hofwiesenstrasse - Schaffhauserplatz bis Bucheggplatz
Amount in the plan: CHF 8’930’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Neubau Busgarage Zürich-Nord, Teil Ladeinfrastruktur
Amount in the plan: CHF 12’200’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 42, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Personenunterführung Mühlebachstrasse
Amount in the plan: CHF 17’850’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Quartierverbindung Seebach
Amount in the plan: CHF 20’000’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 42, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Tramtangente Nord (Affoltern - Stettbach)
Amount in the plan: CHF 325’000’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 42, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Tramwendeschleife Hermetschloo
Amount in the plan: CHF 9’000’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Umsetzung Vorzugsroutennetz Velo, 2. Etappe
Amount in the plan: CHF 15’000’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedZurich
Zürich – Uraniastrasse
Amount in the plan: CHF 12’500’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Stadt Zürich-Glattal, S. 41, as of 11.06.2026
- Agglomeration programmePlannedSt. Gallen
eBusse, Kanton SG
Amount in the plan: CHF 1’300’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Obersee, S. 34, as of 11.06.2026
- Agglomeration programmePlannedZurich
eBusse, Kanton ZH
Amount in the plan: CHF 500’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Obersee, S. 34, as of 11.06.2026
- Agglomeration programmePlannedBern
eMobilität Nidau
Amount in the plan: CHF 200’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Biel/Lyss, S. 14, as of 11.06.2026
- Agglomeration programmePlannedVaud
m2, Doublement de la voie du métro m2 sous la gare CFF à Lausanne
Amount in the plan: CHF 34’980’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Lausanne-Morges, S. 63, as of 11.06.2026
- Agglomeration programmePlannedVaud
tl 21 - Prolongement Le Mont
Amount in the plan: CHF 7’220’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Lausanne-Morges, S. 62, as of 11.06.2026
- Agglomeration programmePlannedVaud
tl, Acquisition de 4 trolleybus articulés à batterie, lignes tl 3 et tl 6
Amount in the plan: CHF 3’400’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Lausanne-Morges, S. 63, as of 11.06.2026
- Agglomeration programmePlannedVaud
tl, Acquisition de bus électriques, période 2028-2032
Amount in the plan: CHF 50’350’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Lausanne-Morges, S. 63, as of 11.06.2026
- Agglomeration programmePlannedVaud
tl, Implantation 23 mâts de charge pour bus électriques
Amount in the plan: CHF 15’330’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Lausanne-Morges, S. 62, as of 11.06.2026
- Agglomeration programmePlannedVaud
tl, Installations de supervision et de recharge aux dépôts pour bus électriques
Amount in the plan: CHF 18’300’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Lausanne-Morges, S. 62, as of 11.06.2026
- Agglomeration programmePlanned
Équipement de bornes publique de quartier (horizon B)
Amount in the plan: CHF 190’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Mobul, S. 65, as of 11.06.2026
- Agglomeration programmePlanned
Équipement de bornes publiques de quartier
Amount in the plan: CHF 1’010’000
Source: Federal Office for Spatial Development ARE, Factsheets: Mitfinanzierte Agglomerationsprogramme der 5. Generation, Mobul, S. 65, as of 11.06.2026
- Rail expansion programmePlannedBasel-Landschaft
Aesch BL: Wendegleis
Final cost forecast: CHF 11’300’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 3, as of Stichtag 31.12.2025
- Rail expansion programmePlannedVaud
Aigle: zentrales Wendegleis
Final cost forecast: CHF 74’400’000
Source: Federal Office of Transport FOT, Kennzahlen zu Standbericht Eisenbahnausbauprogramme 2025, Programm AS35, S. 3, as of Stichtag 31.12.2025
Quelle: Bundesamt für Energie (BFE), Photovoltaik-Grossanlagen in der Schweiz
The information comes from an external source (BFE – Photovoltaik-Grossanlagen in der Schweiz) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BFE – Photovoltaik-Grossanlagen in der Schweiz, opens in a new tab)Terms of use(BFE – Photovoltaik-Grossanlagen in der Schweiz, opens in a new tab)
Quelle: Bundesamt für Energie (BFE), Sachplan Übertragungsleitungen (SÜL)
The information comes from an external source (BFE – Sachplan Übertragungsleitungen (SÜL)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BFE – Sachplan Übertragungsleitungen (SÜL), opens in a new tab)Terms of use(BFE – Sachplan Übertragungsleitungen (SÜL), opens in a new tab)
Quelle: Bundesamt für Verkehr (BAV), Sachplan Verkehr, Teil Infrastruktur Schiene (SIS)
The information comes from an external source (BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS), opens in a new tab)Terms of use(BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS), opens in a new tab)
Quelle: Stadt Zürich, Amt für Hochbauten, AHB-Hochbauprojekte in Ausführung OGD
The information comes from an external source (Stadt Zürich – AHB-Hochbauprojekte in Ausführung) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(Stadt Zürich – AHB-Hochbauprojekte in Ausführung, opens in a new tab)Terms of use(Stadt Zürich – AHB-Hochbauprojekte in Ausführung, opens in a new tab)
Source: OpenParlData.ch
Business with construction and planning credits selected by TEXFY; titles, statuses and dates as delivered.
The information comes from an external source (OpenParlData.ch – Bau- und Projektierungskredite der Parlamente) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(OpenParlData.ch – Bau- und Projektierungskredite der Parlamente, opens in a new tab)Terms of use(OpenParlData.ch – Bau- und Projektierungskredite der Parlamente, opens in a new tab)
Quelle: APProch – Projets d'achats publics, Direction des Achats de l'État, über data.gouv.fr, Licence Ouverte 2.0, Stand der Daten 10.11.2026. Geplante Beschaffungen sind unverbindlich und nicht vollständig; keine Ausschreibung.
The information comes from an external source (APProch – Projets d'achats publics (Frankreich)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(APProch – Projets d'achats publics (Frankreich), opens in a new tab)Terms of use(APProch – Projets d'achats publics (Frankreich), opens in a new tab)
Source : Portail des données SITG (État de Genève), téléchargé et/ou extrait en date du 10.11.2026.
Fields selected and presented by TEXFY (compilation under condition 5.3.2 of the SITG).
Further use of these data is subject to the terms of use of the Portail des données SITG (condition 5.5.1).
The information comes from an external source (SITG Genève – Plans localisés de quartier (adoptés et en procédure)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(SITG Genève – Plans localisés de quartier (adoptés et en procédure), opens in a new tab)Terms of use(SITG Genève – Plans localisés de quartier (adoptés et en procédure), opens in a new tab)
Source : Portail des données SITG (État de Genève), téléchargé et/ou extrait en date du 10.11.2026.
Fields selected and presented by TEXFY (compilation under condition 5.3.2 of the SITG).
Further use of these data is subject to the terms of use of the Portail des données SITG (condition 5.5.1).
The information comes from an external source (SITG Genève – Projets urbains du plan directeur cantonal) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(SITG Genève – Projets urbains du plan directeur cantonal, opens in a new tab)Terms of use(SITG Genève – Projets urbains du plan directeur cantonal, opens in a new tab)
Quelle: Schweizerische Bundesbahnen SBB, Bahnprojekte und regionale Bauprogramme (company.sbb.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (SBB – Bahnprojekte und regionale Bauprogramme) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(SBB – Bahnprojekte und regionale Bauprogramme, opens in a new tab)Operator's legal notice(SBB – Bahnprojekte und regionale Bauprogramme, opens in a new tab)
Quelle: Schweizerische Bundesbahnen SBB, Geplante Beschaffungen SBB Infrastruktur (Excel-Liste)
Die veröffentlichten Einträge dienen ausschliesslich zu Informationszwecken. Aus der Veröffentlichung entsteht kein Anspruch auf den Rechtsweg oder sonstige rechtliche Ansprüche gegenüber dem Herausgeber.
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (SBB – Geplante Beschaffungen SBB Infrastruktur) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(SBB – Geplante Beschaffungen SBB Infrastruktur, opens in a new tab)Operator's legal notice(SBB – Geplante Beschaffungen SBB Infrastruktur, opens in a new tab)
Quelle: Swissgrid AG, Projektübersicht der Netzprojekte (swissgrid.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Dates as written on the project page, sorted by kind by TEXFY; Swissgrid states them for an optimal course without court proceedings.
The information comes from an external source (Swissgrid – Netzprojekte (Projektübersicht)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Swissgrid – Netzprojekte (Projektübersicht), opens in a new tab)Operator's legal notice(Swissgrid – Netzprojekte (Projektübersicht), opens in a new tab)
Quelle: VSA-Plattform «Verfahrenstechnik Mikroverunreinigungen», Liste der ARA mit MV-Stufe (micropoll.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe, opens in a new tab)Operator's legal notice(VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe, opens in a new tab)
Quelle: Kanton Basel-Stadt, Budgetbericht 2026, Investitionsübersichtsliste (Kap. 5.1.3)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Only the building and infrastructure part of the list is taken over: urban development and public space infrastructure, public transport, administrative buildings.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht), opens in a new tab)Operator's legal notice(Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht), opens in a new tab)
Source : Ville de Genève, 21ème Plan financier d'investissement 2026-2037
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The lists of voted and submitted credits and of the plan's active projects are taken over, without the revenue.
The information comes from an external source (Ville de Genève – Plan financier d'investissement (PFI)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Ville de Genève – Plan financier d'investissement (PFI), opens in a new tab)Operator's legal notice(Ville de Genève – Plan financier d'investissement (PFI), opens in a new tab)
Quelle: Bundesamt für Verkehr BAV, Kennzahlen zu Standbericht Eisenbahnausbauprogramme (Datenbeilage zum Standbericht 2025)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Measures as of the report's reference date; TEXFY does not show measures marked as suspended (“sistiert”) or finished (“beendet”) as projects.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme, opens in a new tab)Operator's legal notice(BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme, opens in a new tab)
Quelle: Bundesamt für Raumentwicklung ARE, Factsheets «Mitfinanzierte Agglomerationsprogramme der 5. Generation» (Vernehmlassung Verkehr ’45)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
State of the consultation “Transport ’45” of 19.06.2026: Parliament decides on the federal contributions. Measures of priority B and C are not co-financed by the Confederation in this generation.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (ARE – Massnahmen der Agglomerationsprogramme (5. Generation)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(ARE – Massnahmen der Agglomerationsprogramme (5. Generation), opens in a new tab)Operator's legal notice(ARE – Massnahmen der Agglomerationsprogramme (5. Generation), opens in a new tab)