Projects
Planned projects before they are put out to tender: large alpine PV plants with their permit status, transmission lines and rail expansions from the federal sectoral plans, building projects of the City of Zurich under construction, construction and planning credits of the parliaments, neighbourhood plans and urban projects in Geneva, planned public purchases in the French border region and at the SBB, SBB rail projects, Swissgrid grid projects, wastewater plants planning or building a micropollutant stage, the investment plans of Basel-Stadt and the City of Geneva, and the measures of the federal rail expansion and agglomeration programmes.
A project is not a tender. The clients decide whether, when and in which lots contracts are awarded; the tenders follow later, mostly on simap.ch.
Large private and semi-public buyers award many contracts by invitation only. Where to register as a supplier: Supplier portals
- Rail infrastructureInterim resultTicino
Raccordo di Lugano (TI)
Anschluss
- Rail infrastructurePreliminary informationSolothurn
Reaktivierung Solothurn – Subingen
- Rail infrastructureInterim resultBern
Spange Önz
- Rail infrastructureInterim resultBasel-Stadt
St. Johann
Anschluss Euroairport
- Rail infrastructureDefinitiveZurich
Stadelhofen
Ausbau Bahnhof, Viertes Gleis
- Rail infrastructureDefinitiveGraubünden
Strahlegg
- Rail infrastructureInterim resultNeuchâtel
Suppression du tracé actuel
Aufhebung Stammlinie
- Rail infrastructureDefinitiveBasel-Stadt
Trimodaler Terminal Basel Nord
- Rail infrastructureDefinitiveZurich
Tössmühle
Vierspurausbau Bassersdorf/Dietlikon – Winterthur, Variante Brüttenertunnel kurz
- Rail infrastructureDefinitiveUri
Umfahrung Flüelen
- Rail infrastructurePreliminary informationAargau
Verlängerung Gütergleis Suhr
Kapazitätsausbauten Lenzburg – Zofingen
- Rail infrastructureDefinitiveZurich
Vierspurausbau Dorfnest – Bassersdorf
- Rail infrastructureDefinitiveBern
Vollausbau Adelrain-Mitholz
Lötschberg-Basistunnel
- Rail infrastructurePreliminary informationZurich
Weiningen
Güterumfahrungslinie Limmattal – Furttal, Variante Süd
- Rail infrastructureDefinitiveThurgau
Wil-West
In the status report on the rail expansion programmes: Wil West: Neue Haltestelle (Planned)
- Rail infrastructureDefinitiveSchwyz
Überholgleis Siebnen – Wangen
In the status report on the rail expansion programmes: Siebnen-Wangen: Überholgleis (Planned)
- Rail infrastructureInterim resultAargau
Überholgleis Wettingen
Biel/Bienne – Zürich und Bern – Zürich: Leistungssteigerung und Kapazitätsausbau
- Investment planCredit approvedBasel-Stadt
Sanität Standorte Sanierung/Neu
Amount in the plan: CHF 42’562’000
Source: Canton of Basel-Stadt, Finance Department, Budgetbericht 2026, Kap. 5.1.3 Investitionsübersichtsliste, S. 340, as of 23.10.2025
- Investment planCredit approvedBasel-Stadt
Schifflände - Marktplatz, Projektierung
Amount in the plan: CHF 350’000
Source: Canton of Basel-Stadt, Finance Department, Budgetbericht 2026, Kap. 5.1.3 Investitionsübersichtsliste, S. 339, as of 23.10.2025
- Investment planCredit approvedBasel-Stadt
MWA Erlenmatt Parkanlage Grün 3
Amount in the plan: CHF 2’900’000
Source: Canton of Basel-Stadt, Finance Department, Budgetbericht 2026, Kap. 5.1.3 Investitionsübersichtsliste, S. 337, as of 23.10.2025
- Investment planCredit approvedGeneva
Etude de réaménagement
Amount in the plan: CHF 1’200’000
Source: City of Geneva, 21ème Plan financier d'investissement 2026-2037, Crédits votés, p. 43, as of Situation au 29.08.2025
- Investment planCredit approvedGeneva
6ème PSIC - Plan biennal systèmes d'information
Amount in the plan: CHF 3’980’000
Source: City of Geneva, 21ème Plan financier d'investissement 2026-2037, Crédits votés, p. 47, as of Situation au 29.08.2025
- Investment planCredit approvedGeneva
Remise aux normes des équipements
Amount in the plan: CHF 1’150’000
Source: City of Geneva, 21ème Plan financier d'investissement 2026-2037, Crédits votés, p. 28, as of Situation au 29.08.2025
- Investment planCredit approvedBasel-Stadt
RAB Ausbau Tagesstrukturen
Amount in the plan: CHF 45’750’000
Source: Canton of Basel-Stadt, Finance Department, Budgetbericht 2026, Kap. 5.1.3 Investitionsübersichtsliste, S. 340, as of 23.10.2025
- Investment planCredit approvedGeneva
Renouvellement du progiciel intégré SAP
Amount in the plan: CHF 10’370’115
Source: City of Geneva, 21ème Plan financier d'investissement 2026-2037, Crédits votés, p. 47, as of Situation au 29.08.2025
Quelle: Bundesamt für Energie (BFE), Photovoltaik-Grossanlagen in der Schweiz
The information comes from an external source (BFE – Photovoltaik-Grossanlagen in der Schweiz) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BFE – Photovoltaik-Grossanlagen in der Schweiz, opens in a new tab)Terms of use(BFE – Photovoltaik-Grossanlagen in der Schweiz, opens in a new tab)
Quelle: Bundesamt für Energie (BFE), Sachplan Übertragungsleitungen (SÜL)
The information comes from an external source (BFE – Sachplan Übertragungsleitungen (SÜL)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BFE – Sachplan Übertragungsleitungen (SÜL), opens in a new tab)Terms of use(BFE – Sachplan Übertragungsleitungen (SÜL), opens in a new tab)
Quelle: Bundesamt für Verkehr (BAV), Sachplan Verkehr, Teil Infrastruktur Schiene (SIS)
The information comes from an external source (BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS), opens in a new tab)Terms of use(BAV – Sachplan Verkehr, Teil Infrastruktur Schiene (SIS), opens in a new tab)
Quelle: Stadt Zürich, Amt für Hochbauten, AHB-Hochbauprojekte in Ausführung OGD
The information comes from an external source (Stadt Zürich – AHB-Hochbauprojekte in Ausführung) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(Stadt Zürich – AHB-Hochbauprojekte in Ausführung, opens in a new tab)Terms of use(Stadt Zürich – AHB-Hochbauprojekte in Ausführung, opens in a new tab)
Source: OpenParlData.ch
Business with construction and planning credits selected by TEXFY; titles, statuses and dates as delivered.
The information comes from an external source (OpenParlData.ch – Bau- und Projektierungskredite der Parlamente) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(OpenParlData.ch – Bau- und Projektierungskredite der Parlamente, opens in a new tab)Terms of use(OpenParlData.ch – Bau- und Projektierungskredite der Parlamente, opens in a new tab)
Quelle: APProch – Projets d'achats publics, Direction des Achats de l'État, über data.gouv.fr, Licence Ouverte 2.0, Stand der Daten 10.11.2026. Geplante Beschaffungen sind unverbindlich und nicht vollständig; keine Ausschreibung.
The information comes from an external source (APProch – Projets d'achats publics (Frankreich)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(APProch – Projets d'achats publics (Frankreich), opens in a new tab)Terms of use(APProch – Projets d'achats publics (Frankreich), opens in a new tab)
Source : Portail des données SITG (État de Genève), téléchargé et/ou extrait en date du 10.11.2026.
Fields selected and presented by TEXFY (compilation under condition 5.3.2 of the SITG).
Further use of these data is subject to the terms of use of the Portail des données SITG (condition 5.5.1).
The information comes from an external source (SITG Genève – Plans localisés de quartier (adoptés et en procédure)) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(SITG Genève – Plans localisés de quartier (adoptés et en procédure), opens in a new tab)Terms of use(SITG Genève – Plans localisés de quartier (adoptés et en procédure), opens in a new tab)
Source : Portail des données SITG (État de Genève), téléchargé et/ou extrait en date du 10.11.2026.
Fields selected and presented by TEXFY (compilation under condition 5.3.2 of the SITG).
Further use of these data is subject to the terms of use of the Portail des données SITG (condition 5.5.1).
The information comes from an external source (SITG Genève – Projets urbains du plan directeur cantonal) and is not an official publication of this platform. The original publication is authoritative.
Source dataset(SITG Genève – Projets urbains du plan directeur cantonal, opens in a new tab)Terms of use(SITG Genève – Projets urbains du plan directeur cantonal, opens in a new tab)
Quelle: Schweizerische Bundesbahnen SBB, Bahnprojekte und regionale Bauprogramme (company.sbb.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (SBB – Bahnprojekte und regionale Bauprogramme) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(SBB – Bahnprojekte und regionale Bauprogramme, opens in a new tab)Operator's legal notice(SBB – Bahnprojekte und regionale Bauprogramme, opens in a new tab)
Quelle: Schweizerische Bundesbahnen SBB, Geplante Beschaffungen SBB Infrastruktur (Excel-Liste)
Die veröffentlichten Einträge dienen ausschliesslich zu Informationszwecken. Aus der Veröffentlichung entsteht kein Anspruch auf den Rechtsweg oder sonstige rechtliche Ansprüche gegenüber dem Herausgeber.
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (SBB – Geplante Beschaffungen SBB Infrastruktur) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(SBB – Geplante Beschaffungen SBB Infrastruktur, opens in a new tab)Operator's legal notice(SBB – Geplante Beschaffungen SBB Infrastruktur, opens in a new tab)
Quelle: Swissgrid AG, Projektübersicht der Netzprojekte (swissgrid.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Dates as written on the project page, sorted by kind by TEXFY; Swissgrid states them for an optimal course without court proceedings.
The information comes from an external source (Swissgrid – Netzprojekte (Projektübersicht)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Swissgrid – Netzprojekte (Projektübersicht), opens in a new tab)Operator's legal notice(Swissgrid – Netzprojekte (Projektübersicht), opens in a new tab)
Quelle: VSA-Plattform «Verfahrenstechnik Mikroverunreinigungen», Liste der ARA mit MV-Stufe (micropoll.ch)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The information comes from an external source (VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe, opens in a new tab)Operator's legal notice(VSA-Plattform Mikroverunreinigungen – Liste der ARA mit MV-Stufe, opens in a new tab)
Quelle: Kanton Basel-Stadt, Budgetbericht 2026, Investitionsübersichtsliste (Kap. 5.1.3)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Only the building and infrastructure part of the list is taken over: urban development and public space infrastructure, public transport, administrative buildings.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht), opens in a new tab)Operator's legal notice(Kanton Basel-Stadt – Investitionsübersichtsliste (Budgetbericht), opens in a new tab)
Source : Ville de Genève, 21ème Plan financier d'investissement 2026-2037
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
The lists of voted and submitted credits and of the plan's active projects are taken over, without the revenue.
The information comes from an external source (Ville de Genève – Plan financier d'investissement (PFI)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(Ville de Genève – Plan financier d'investissement (PFI), opens in a new tab)Operator's legal notice(Ville de Genève – Plan financier d'investissement (PFI), opens in a new tab)
Quelle: Bundesamt für Verkehr BAV, Kennzahlen zu Standbericht Eisenbahnausbauprogramme (Datenbeilage zum Standbericht 2025)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
Measures as of the report's reference date; TEXFY does not show measures marked as suspended (“sistiert”) or finished (“beendet”) as projects.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme, opens in a new tab)Operator's legal notice(BAV – Kennzahlen zum Standbericht der Bahnausbauprogramme, opens in a new tab)
Quelle: Bundesamt für Raumentwicklung ARE, Factsheets «Mitfinanzierte Agglomerationsprogramme der 5. Generation» (Vernehmlassung Verkehr ’45)
Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.
State of the consultation “Transport ’45” of 19.06.2026: Parliament decides on the federal contributions. Measures of priority B and C are not co-financed by the Confederation in this generation.
Amounts as written in the document (in francs, thousand or million francs); TEXFY converts them to francs.
The information comes from an external source (ARE – Massnahmen der Agglomerationsprogramme (5. Generation)) and is not an official publication of this platform. The original publication is authoritative.
Operator's page(ARE – Massnahmen der Agglomerationsprogramme (5. Generation), opens in a new tab)Operator's legal notice(ARE – Massnahmen der Agglomerationsprogramme (5. Generation), opens in a new tab)