Road projects of the cantons

Projects on cantonal roads that are not yet being built, from the construction programmes, project lists and project pages of the cantons of Aargau, Graubünden, Lucerne, St. Gallen, Schwyz, Zug and Zurich. The cantons put works and planning out to tender later, mostly on simap.ch; the programmes do not say whether or when.

Aargau and Lucerne keep their data up to date without a date for the stage; we show a change from the day we see it. Zurich keeps a page per project. Schwyz, Zug, St. Gallen and Graubünden adopt their programme for several years; rows whose period has passed are no longer shown. From Zurich, St. Gallen and Graubünden we take over only facts, with a link to the original. Projects in tender, under construction, completed or suspended are not shown.

1’238 road projects not yet being built

  • in the road programmeSt. Gallen

    Langsamverkehr Hofstrasse Salez

    Municipality
    Sennwald
    Milestone in the programme
    Bauende
    Kind of work
    Fuss- und Veloverkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B28.2.070.001
    Total cost in the programme
    CHF 4.19 million
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 78 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 78, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Langäulistrasse; Totalsanierung, Knotensanierung, Umbau Trottoir

    Municipality
    Buchs
    Milestone in the programme
    Bauende
    Kind of work
    Strassenkorrektionen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B31.2.114.001
    Total cost in the programme
    CHF 4.2 million
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 75 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 75, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Lenggenwil Einmündung Zuckerrieterstrasse

    Municipality
    Niederhelfenschwil
    Kind of work
    Fuss- und Veloverkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 98 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 98, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Lukassstrasse; Lukasmühle - Knoten Lindenstrasse

    Municipality
    St.Gallen
    Kind of work
    Fuss- und Veloverkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 95 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 95, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    MIV 2.1 Zentrumsgestaltung Henau

    Municipality
    Uzwil
    Kind of work
    Strassenraumgestaltungen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 107 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 107, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Martinsbruggstrasse

    Municipality
    St.Gallen
    Kind of work
    Fuss- und Veloverkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 96 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 96, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 152a Knoten Herisauerstrasse-Talstrasse LSA zur öV Bevorzugung

    Municipality
    Gossau
    Milestone in the programme
    Projektierung
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.05 million
    Remark of the canton
    Neues Projekt / Kantonales Begehren
    Services
    Road construction and surfacing

    Page 82 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 82, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 152a Knoten Multstrasse-Herisauerstrasse LSA zur öV Bevorzugung

    Municipality
    Gossau
    Milestone in the programme
    Projektierung
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.05 million
    Remark of the canton
    Neues Projekt / Kantonales Begehren
    Services
    Road construction and surfacing

    Page 82 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 82, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 159a Knoten Hirschenstrasse-St.Gallerstrasse LSA zur öV Bevorzugung

    Municipality
    Gossau
    Milestone in the programme
    Projektierung
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.05 million
    Remark of the canton
    Neues Projekt / Kantonales Begehren
    Services
    Road construction and surfacing

    Page 82 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 82, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 210b öV-Bevorzugung am Kreisel prüfen

    Municipality
    Tübach
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 103 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 103, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 301b Studie zur Schwachstellenbehebung zwischen Bahnhof Altstätten-Altsätten Rathaus-Kesselbrücke

    Municipality
    Altstätten
    Milestone in the programme
    Projektierung
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.1 million
    Remark of the canton
    Neues Projekt / Kantonales Begehren
    Services
    Road construction and surfacing

    Page 82 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 82, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 622a Knoten Bahnhofplatz Optimierung LSA zugunsten öV

    Municipality
    Rapperswil-Jona
    Milestone in the programme
    Projektierung
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.1 million
    Remark of the canton
    Neues Projekt / Kantonales Begehren
    Services
    Road construction and surfacing

    Page 82 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 82, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 631b Studie zur öV Bevorzugung zwischen Neuhaus und Neuhaus Industrie

    Municipality
    Eschenbach
    Milestone in the programme
    Projektierung
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.1 million
    Remark of the canton
    Neues Projekt / Kantonales Begehren
    Services
    Road construction and surfacing

    Page 82 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 82, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Massnahmen zur Verbesserung der Fahrplanstabilität; Schwachstelle 734a öV- Bevorzugung Knoten Winkelriedstrasse-Zürcherstrasse

    Municipality
    Wil
    Kind of work
    Infrastrukturen für den öffentlichen Verkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 103 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 103, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Mattenhof

    Municipality
    Berg
    Kind of work
    Strassenraumgestaltungen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 107 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 107, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Mehrzweckstreifen Bahnhofstrasse / Kreuzung Zehntfeldstrasse

    Municipality
    Widnau
    Kind of work
    Strassenraumgestaltungen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 106 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 106, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Metzgergasse

    Municipality
    St.Gallen
    Kind of work
    Fuss- und Veloverkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 95 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 95, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Mobilitätszukunft

    Municipality
    Rapperswil-Jona
    Milestone in the programme
    Projektierung
    Kind of work
    Umfahrungsstrassen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B52.3.017.726
    Total cost in the programme
    CHF 5 million
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 74 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 74, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Murgstrasse, Dorf Mühlrüti bis Bennenmoos (mit Abzweiger KS Nr. 40/45 im Bennenmoos)

    Municipality
    Mosnang
    Milestone in the programme
    Bauende
    Kind of work
    Kantonsstrassensanierungsprojekte
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B72.4.040.004
    Total cost in the programme
    CHF 2.27 million
    Services
    Road construction and surfacing

    Page 85 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 85, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    N01/56 Anschluss Witen mit Zubringer Rorschach

    Municipality
    Goldach
    Milestone in the programme
    Projektierung
    Kind of work
    Umfahrungsstrassen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B06.1.104.005
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 74 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 74, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    NTB-BZB (Langäulistrasse / Fegerenhof)

    Municipality
    Buchs
    Kind of work
    Fuss- und Veloverkehr
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 2. Priorität (B), Ersatzprojekte
    Services
    Road construction and surfacing

    Page 96 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 96, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Netzergänzung Grünaustrasse

    Municipality
    Wil
    Milestone in the programme
    Projektierung
    Kind of work
    Umfahrungsstrassen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Total cost in the programme
    CHF 0.5 million
    Remark of the canton
    Neues Projekt
    Services
    Road construction and surfacing

    Page 74 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 74, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Netzergänzung Nord

    Municipality
    Wil
    Milestone in the programme
    Projektierung
    Kind of work
    Umfahrungsstrassen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B81.5.023.017
    Total cost in the programme
    CHF 3 million
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 74 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 74, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Netzstrategie DHAMK

    Municipality
    Diepoldsau
    Milestone in the programme
    Studie
    Kind of work
    Umfahrungsstrassen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B20.1.041.021
    Total cost in the programme
    CHF 0.5 million
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 74 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 74, as of 08.04.2024. Facts only; only the original is binding.

  • in the road programmeSt. Gallen

    Netzstrategie MIV, Region Sargans

    Municipality
    Sargans
    Milestone in the programme
    Projektierung
    Kind of work
    Umfahrungsstrassen
    Construction programme
    18. Strassenbauprogramm 2024–2028, Bauvorhaben der 1. Priorität (A)
    Project number
    B34.2.001.664
    Total cost in the programme
    CHF 1 million
    Remark of the canton
    Laufendes Projekt
    Services
    Road construction and surfacing

    Page 74 of the document (opens the canton's PDF in a new tab)

    Source: Kanton St.Gallen, Kantonsratsbeschluss über das 18. Strassenbauprogramm (Arbeitsfassung des Bau- und Umweltdepartementes), 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss, p. 74, as of 08.04.2024. Facts only; only the original is binding.

© 2026, rawi Kanton Luzern

Data: construction programme of the cantonal roads of the transport and infrastructure department (vif), geoportal of the canton of Lucerne (www.geoportal.lu.ch). Selection and presentation of the details by TEXFY.

The reuse of these data is subject to the terms of use of the geoportal of the canton of Lucerne.

These details have no legal effect and are for information only. The competent offices of the canton give binding information.

The information comes from an external source (Kanton Luzern – Bauprogramm Kantonsstrassen) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 09.11.2026, 06:20 (last successful retrieval)

Use: Open-By of the geoportal of the canton of Lucerne: free use, also commercial; attribution is required (Art. 30 GeoIO)

Source dataset(Kanton Luzern – Bauprogramm Kantonsstrassen, opens in a new tab)Terms of use(Kanton Luzern – Bauprogramm Kantonsstrassen, opens in a new tab)

Source: Daten des Kantons Aargau (Abteilung Tiefbau, Geodatensatz 44-AG Strassenbauprojekte an Kantonsstrassen)

Data: geodata set 44-AG “Strassenbauprojekte an Kantonsstrassen” of the civil engineering department (Abteilung Tiefbau), geoportal of the canton of Aargau (www.ag.ch/geoportal). Selection and presentation of the details by TEXFY.

These details are for information only; the canton gives no guarantee that they are correct and complete. The documents of the public display and of the tender are binding.

The information comes from an external source (Kanton Aargau – Strassenbauprojekte an Kantonsstrassen) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 09.11.2026, 06:25 (last successful retrieval)

Use: opendata.swiss “Open use” (terms_open) and the terms of use of the canton of Aargau for publicly accessible geodata (note of origin “Daten des Kantons Aargau”)

Source dataset(Kanton Aargau – Strassenbauprojekte an Kantonsstrassen, opens in a new tab)Terms of use(Kanton Aargau – Strassenbauprojekte an Kantonsstrassen, opens in a new tab)

Quelle: Regierungsrat des Kantons Schwyz, Strassenbauprogramm 2026–2040, Beschluss Nr. 774/2025 vom 14. Oktober 2025

Extract from the canton's document: for each project the name, period and amount as they stand there, with the page. Selection and presentation by TEXFY; the document is authoritative.

A road programme is a plan: periods and amounts change with every update, and it does not say whether or when a contract will be put out to tender.

The information comes from an external source (Kanton Schwyz – Strassenbauprogramm) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 09.11.2026, 00:45 (last successful retrieval)

Use: Official document: decisions and reports of authorities are not protected by copyright (Art. 5 para. 1 let. a and c CopA)

Source dataset(Kanton Schwyz – Strassenbauprogramm, opens in a new tab)

Quelle: Kanton Zug, Strassenbauprogramm 2023–2030, Objektliste (Kantonsratsbeschluss vom 30. März 2023, BGS 751.12)

Extract from the canton's document: for each project the name, period and amount as they stand there, with the page. Selection and presentation by TEXFY; the document is authoritative.

A road programme is a plan: periods and amounts change with every update, and it does not say whether or when a contract will be put out to tender.

The information comes from an external source (Kanton Zug – Strassenbauprogramm) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 09.11.2026, 00:45 (last successful retrieval)

Use: Official document: decisions and reports of authorities are not protected by copyright (Art. 5 para. 1 let. a and c CopA)

Source dataset(Kanton Zug – Strassenbauprogramm, opens in a new tab)

Quelle: Kanton Zürich, Tiefbauamt, Geplante Strassenprojekte (zh.ch)

Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.

A road programme is a plan: periods and amounts change with every update, and it does not say whether or when a contract will be put out to tender.

The information comes from an external source (Kanton Zürich – Geplante Strassenprojekte) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 10.11.2026, 23:19 (last successful retrieval)

Use: zh.ch, Nutzungshinweise «Urheber- und verwandte Rechte»: «Jede weitere Verwendung von Inhalten aus den kantonalen Internetseiten und insbesondere das Einbinden (über Frames oder Inlinelinks) in andere Seiten ist nur mit Einverständnis der Rechteinhabenden gestattet.» Übernommen werden nur Tatsachen je Projekt, mit Link auf die Projektseite (Entscheid des Betreibers vom 10.11.2026).

Operator's page(Kanton Zürich – Geplante Strassenprojekte, opens in a new tab)Operator's legal notice(Kanton Zürich – Geplante Strassenprojekte, opens in a new tab)

Quelle: Kanton St.Gallen, 18. Strassenbauprogramm 2024–2028, Anhang zum Kantonsratsbeschluss (Arbeitsfassung vom 8. April 2024)

Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.

A road programme is a plan: periods and amounts change with every update, and it does not say whether or when a contract will be put out to tender.

The information comes from an external source (Kanton St.Gallen – 18. Strassenbauprogramm) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 10.11.2026, 23:03 (last successful retrieval)

Use: sg.ch, Impressum «Rechte an Inhalten»: «Von solchen gesetzlichen Schranken und Ausnahmen abgesehen dürfen Sie die bereitgestellten Inhalte nur mit Zustimmung des jeweiligen Rechteinhabers verwenden.» Übernommen werden nur Tatsachen je Vorhaben, mit Link auf die Seite im Dokument (Entscheid des Betreibers vom 10.11.2026).

Operator's page(Kanton St.Gallen – 18. Strassenbauprogramm, opens in a new tab)Operator's legal notice(Kanton St.Gallen – 18. Strassenbauprogramm, opens in a new tab)

Quelle: Kanton Graubünden, Bericht zum Strassenbau und Strassenbauprogramm 2025–2028 (Botschaft Heft Nr. 7/2023–2024)

Only facts per project are taken over (name, place, kind, phase, dates, amounts), with a link to the original; TEXFY does not take over the source's texts, files or layout. Only the original is binding.

A road programme is a plan: periods and amounts change with every update, and it does not say whether or when a contract will be put out to tender.

The information comes from an external source (Kanton Graubünden – Strassenbauprogramm) and is not an official publication of this platform. The original publication is authoritative.

Data as of: 10.11.2026, 23:03 (last successful retrieval)

Use: gr.ch, Impressum «Copyright»: «Ohne vorherige schriftliche Zustimmung der Urheberrechtsträger sind Reproduktionen, Modifikationen und das Weiterverwenden von urheberrechtlich geschützten Inhalten der Website für öffentliche oder kommerzielle Zwecke untersagt.» Übernommen werden nur Tatsachen je Vorhaben, mit Link auf die Seite im Dokument (Entscheid des Betreibers vom 10.11.2026).

Operator's page(Kanton Graubünden – Strassenbauprogramm, opens in a new tab)Operator's legal notice(Kanton Graubünden – Strassenbauprogramm, opens in a new tab)