All tenders
Awarded
  • Construction and installation
  • BKP 272.2 General metalwork

Balkonsanierung Bienenstrasse 34/36, Binningerstrasse 28/30, 4104 Oberwil

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton BL
Procuring office
Rahbaran Hürzeler Architekten
Requesting office
Aedificura AG
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 25.08.20255 bids

    • Iromet AG, Alpnach DorfCHF 258’222.57 incl. VAT
Awards of this contracting authority

What is being procured?

Scope of work

Die Wohnüberbauung aus den 60er Jahren steht an leichter Hanglage an der Hauptstrasse zwischen Basel und dem Dorfkern von Oberwil. Die vier baugleichen Punktgebäude sind dem Terrain folgend in südöstlicher Ausrichtung in die parkähnliche Anlage gebettet. Erschlossen wird die Parzelle über die Quartierstrassen Bienenstrasse und Fürstenrein. Die zentral angelegte Piazza mit Spielplatz bilden den Angelpunkt der Freiraumgestaltung der Siedlung.

Die Gebäude sind in Massivbauweise erstellt und sind an jeweils drei Ecken mit Balkonen versehen. Die Deckenplatten sind zusammen mit den Balkonbrüstungen in Ortbeton gegossen worden. Die unzureichende Betonüberdeckung der Brüstungen hat zu Korrosionsbefall der Armierungseisen geführt. Dies hat an verschiedenen Stellen zu Abplatzungen des Betons geführt.

Das Sanierungskonzept sieht vor die bestehenden Betonbrüstungen von den Deckenplatten abzutrennen und mit einer verkleideten Metallkonstruktion zu ersetzten. Zusätzlich werden die Balkone mittels Spachtelung abgedichtet und mit Rinnen und Fallrohren versehen.

Um die Sichtbarkeit der im Erdreich versenkten Hauseingänge zu verbessern werden diese mit lackierten Wellbandprofilen versehen.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Design and execution
Procedure
Open procedure
Trades
  • BKP 272.2 – General metalwork
  • OAG 1.1.2 – Apartment building
CPV
  • CPV 45262670 – Metalworking
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
5455
Publication number
5455-02
Covered by international agreements
No

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Basel-Landschaft: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.