All tenders
Open · 61 days left
  • Construction and installation
  • BKP 1 Enabling works
  • BKP 2 Building
  • +3

EPFL - General contractor - Rehabilitation and looping of an industrial water network, incl. creation of a hydraulic decoupling station on the lakeshore to combat the spread of Quagga mussels

Published in French. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
EPFL VPF ACHATS
Requesting office
EPFL VPO-SE INFRA
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
11.01.2027, 16:0061 days left
Type
Construction and installation
Procedure
Open procedure
Award weighting
In the documents
Eligibility
In the documents
Site visit
Not mandatory

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Bid languageNote

    The bid must be in French.

    From «Bid languages»

  • Securities per contractGood to know

    Whether a surety or guarantee is needed is set out in the contract or the documents. Check there.

    Veuillez consulter le chapitre 10.3 du cahier des charges. From «Securities and guarantees»

  • Online via simap onlyGood to know

    Bids are submitted on simap.ch; you need a bidder account there.

    From «Submission»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Le marché porte sur l’étude et la construction en Entreprise Totale des parties d’ouvrages suivantes :

1. Nouvelle station de découplage (SDD) y compris les adaptations hydrauliques dans les stations de pompage (SPP), les conduites de liaison SPP et SDD et les conduites de rejet au lac entre le bâtiment SDD et la chambre de visite d’interface des conduites CCU/SDD.

2. Nouvelles conduites de liaison (terrestres) SDD-PDR jusqu’au poste de redistribution PDR, y compris la création d’un nouveau local de pompes dans l’actuel parking au sous-sol du bâtiment BS de l’EPFL.

3. Rénovation du réseau de distribution dans les galeries EPFL depuis le poste PDR jusqu’aux différentes sous-stations propres à chaque bâtiment du campus y compris la nouvelle conduite de retour et les adaptations hydrauliques à la CCT.

L’Entreprise Totale interviendra de la phase « 32. Projet d’ouvrage » jusqu’à la phase « 53. Mise en service, achèvement ».

L’élément déclencheur et l’objectif primordial du projet est la protection contre la prolifération des moules Quagga dans nos conduites et la sécurisation du réseau de refroidissement. Cependant, la vétusté des conduites ainsi que nos capacités en refroidissement actuelles, induisent une réflexion globale sur l’avenir de l’ensemble du site de l’EPFL et l’UNIL à Ecublens.

De ce fait, le projet comprend les trois objectifs ci-dessous :

1. Protection totale des conduites du réseau de refroidissement contre la prolifération des moules Quagga, grâce au découplage hydraulique et à un nouveau réseau en boucle fermée.

2. Augmentation des capacités en refroidissement afin de subvenir aux besoins futurs dus aux nouveaux bâtiments et à l’augmentation de la demande des bâtiments existants.

3. Réduction des coûts d’exploitation et optimisation énergétique grâce au bouclage du réseau.

Veuillez consulter le cahier des charges et ses annexes pour plus de renseignement.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Design and execution
Procedure
Open procedure
Trades
  • BKP 1 – Enabling works
  • BKP 2 – Building
  • BKP 3 – Special equipment and services
  • BKP 4 – External works
  • BKP 5 – Incidental costs
CPV
  • CPV 45200000 – Works for complete or part construction and civil engineering work
  • CPV 45213250 – Construction work for industrial buildings
  • CPV 71300000 – Engineering services
Options
Provided for

Option: Démontage réseau ouvert y compris adaptations CCT

Variants
Admitted

Veuillez consulter le chapitre 9.12 du cahier des charges.

Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
14.09.2026
Questions untilpast
12.10.2026

Réponses de l'adjudicateur jusqu'au 30.10.2026

Submission deadlinenext
11.01.2027, 16:00
Bid valid
180 days after the deadline

Voir chapitre 9.16 du cahier des charges.

Execution

Veuillez consulter le chapitre 3.5.5 du cahier des charges.

Site visit

Délai inscription à la Visite du sitepast
22.09.2026

Une visite des sites est prévue le vendredi 25.09.2026 et est fortement conseillée. La visite est commune à tous les soumissionnaires et permet de prendre connaissance des lieux.

Les visites sont sous inscription. Chaque soumissionnaire est autorisé à convier un maximum de 3 collaborateurs.

Les demandes d’inscription sont à envoyer à carlos.ruizluna@epfl.ch jusqu’au 22.09.2026.

Les questions devront être posées sur le forum Simap exclusivement.

Visite du sitepast
25.09.2026

Les détails concernant la visite (heure et lieu de rendez-vous, temps prévu, etc.) seront communiqués aux soumissionnaires inscrits à la visite en temps utile.

Note of the contracting authority (date, time and place as published)

Veuillez consulter le chapitre 8.2 du cahier des charges.

Special deadlines and formal requirements

Veuillez consulter attentivement le chapitre 8.4 du cahier des charges.

Submission & documents

According to the simap data. We submit nothing for you.

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
French
Language of the documents
French
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

Note of the contracting authority

Veuillez consulter le chapitre 4.4 du cahier des charges.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

Note of the contracting authority

Veuillez consulter le chapitre 5 du cahier des charges.

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

9 conditions
Bidding consortia
Allowed

Veuillez consulter le chapitre 9.14 du cahier des charges.

Subcontractors
Allowed

Veuillez consulter le chapitre 9.15 du cahier des charges.

Contract extension
Not provided for
Dialogue
Not provided for
Securities and guarantees

Veuillez consulter le chapitre 10.3 du cahier des charges.

Terms of payment

Les modalités applicables au paiement sont prévues dans les Conditions générales (CG) de la Confédération relatives à l'achat de services (Annexe A02).

Terms and conditions

Veuillez consulter le chapitre 10.2 du cahier des charges.

Previously involved bidders

Veuillez consulter le chapitre 3.5 du cahier des charges. Les entreprises ayant participé aux études de faisabilité et d'avant-projets ne sont pas considérées comme pré-impliquées. Les rapports complets de ces études sont joints en annexe (B112, B121, B122, B131, B141 et B211) en guide de mesures compensatoires. Par ailleurs, un délai de transmission des offres supérieur au minimum légal a été prévu.

Further information on the conditions

Veuillez consulter le chapitre 4.3 du cahier des charges.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
43585
Publication number
43585-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Conformément à l'art. 56, al. 1, de la loi fédérale sur les marchés publics (LMP), la présente décision peut être attaquée, dans un délai de 20 jours à compter de sa notification, auprès du Tribunal administratif fédéral, case postale, 9023 Saint-Gall. Présenté en deux exemplaires, le mémoire de recours doit indiquer les conclusions, les motifs et les moyens de preuve et porter la signature de la partie recourante ou de son représentant ; y seront jointes une copie de la présente décision et les pièces invoquées comme moyens de preuve, lorsqu'elles sont disponibles.
Conformément à l'art. 56, al. 2, LMP, les dispositions de la Loi fédérale sur la procédure administrative (PA) relatives à la suspension des délais ne s'appliquent pas.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Vaud: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.