All tenders
Open · 13 days left
  • Construction and installation
  • BKP 212 Precast concrete and prefabricated masonry construction
  • BKP 213 Prefabricated steel construction
  • +21

Renewal of the Furka-Realp car transport infrastructure

Published in German / Italian. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
Beschaffungsstelle Matterhorn Gotthard Bahn
Requesting office
Matterhorn Gotthard Infrastruktur AG
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
24.11.2026, 23:5913 days left
Type
Construction and installation
Procedure
Open procedure
Site visit
Not mandatory

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • References requiredNote

    For eligibility you need comparable reference projects. Check number, age and size.

    EK1: Referenzen über die Ausführung von 2 mit der vorgesehenen Aufgabe vergleichbaren realisierten Projekten (insbesondere bezüglichStrassenbauarbeiten unter laufendem Verkehr und Bauen im Grundwasserr) in … From «Eligibility criteria»

  • Subcontracting limitedGood to know

    The publication limits subcontracting, for example by share or by requiring consent.

    Sub-Subunternehmungen sind nicht zugelassen From «Subcontractors»

4 more notes
  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    From «Variants»

  • Price counts 50 %Good to know

    Price makes up 50 % of the evaluation.

    From «Award criteria»

  • Documents for a feeGood to know

    A fee is charged for the tender documents.

    From «Documents»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Language of the publication

Die Matterhorn Gotthard Infrastruktur AG (MGI) plant den Autoverlad «Furkatunnel» mit einem neuen Vertriebs- und Zutrittssystem auszustatten. Die Erneuerung und Modernisierung des Zutrittssystems erfordert bauliche Anpassungen der Verladestationen. Gleichzeitig wird auch die mehrheitlich seit der Eröffnung des Furkatunnels 1982 in Betrieb stehende Infrastruktur des Autoverlades saniert und an Gesetze (z.B. BehiG), Vorschriften und heutigen Bedürfnissen angepasst. Die Verkehrsanlagen der Nutzer des Autoverlades Realp werden umgebaut. Es handelt sich im Wesentlichen um ein Strassenbauprojekt. Auf dem erwähnten Perimeter werden an den Arbeitsgattungen, Strassen und Arealplätze, Kunstbauten sowie ein Betriebsgebäude, Fahrbahn im Bereich Verladezone, Niederspannung und Telekommunikationsanlagen Arbeiten durchgeführt. In den Bahnstromanlagen und Sicherungsanlagen sind keine wesentlichen Arbeiten (kleinere Anpassungsarbeiten) vorgesehen bzw. erforderlich.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • BKP 212 – Precast concrete and prefabricated masonry construction
  • BKP 213 – Prefabricated steel construction
  • NPK 111 – Daywork
  • NPK 112 – Testing and inspection
  • NPK 113 – Site establishment
  • NPK 114 – Access scaffolding
  • NPK 116 – Felling and site clearance
  • NPK 117 – Demolition and dismantling
  • NPK 131 – Repair and protection of concrete structures
  • NPK 132 – Drilling and cutting of concrete and masonry
  • NPK 151 – Construction works for utility mains
  • NPK 161 – Dewatering
  • NPK 162 – Basement retaining structures and strutting
  • NPK 171 – Piling
  • NPK 172 – Waterproofing for below-ground structures and for bridges
  • NPK 211 – Excavation and earthworks
  • NPK 221 – Sub-bases for transport routes
  • NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
  • NPK 223 – Asphalt and concrete pavements
  • NPK 237 – Drainage and sewer systems
  • NPK 241 – In-situ concrete construction
  • NPK 281 – Vehicle restraint systems and guard rails
  • NPK 314 – Masonry
CPV
  • CPV 45000000 – Construction workCPV general: general code without a field
  • CPV 45234100 – Railway construction works
Options
Not provided for
Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
12.10.2026
Express interest beforenext
20.11.2026
Documents available
12.10.2026 to 20.11.2026
Questions untilpast
28.10.2026

Fragen werden ausschliesslich über Simap bearbeitet

Submission deadline
24.11.2026, 23:59
Opening of bids
26.11.2026, 3900 Brig, not public
Bid valid
180 days after the deadline
Contract
30.03.2027 to 30.07.2029
Execution
30.03.2027 to 30.05.2029

Site visit

Note of the contracting authority (date, time and place as published)

es findet keine Begehung statt

Submission & documents

According to the simap data. We submit nothing for you.

  • By post or delivery in person

    Beschaffungsstelle Matterhorn Gotthard BahnDammweg 803900 Glis

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

Tender documents
Request the documents by e-mail: einkauf@mgbahn.ch
Languages of the bid
German
Language of the documents
German
Cost of the documents
CHF 200.00
Note on obtaining the documents

Die Unterlagen werden nach Einzahlung der Kaution zugestellt.

Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

3 eligibility criteria
  1. EK 1

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    EK1: Referenzen über die Ausführung von 2 mit der vorgesehenen Aufgabe vergleichbaren realisierten Projekten (insbesondere bezüglichStrassenbauarbeiten unter laufendem Verkehr und Bauen im Grundwasserr) in den letzten 10 Jahren.

    Evidence

    gemäss Ausschreibungsunterlagen

  2. EK 2

    TEXFY assessment: What this means: Schedule – whether your timetable meets the deadlines and is realistic.

    Ausreichende personelle Ressourcen zur termingerechten Realisierung des Bauvorhabens.

    Evidence

    gemäss Ausschreibungsunterlagen

  3. EK 3

    TEXFY assessment: What this means: Finances – whether your company is financially sound and adequately insured, e.g. with a debt enforcement extract and proof of insurance.

    Erklärung über den Gesamtumsatz der Unternehmung in den der Ausschreibung vorangegangenen drei

    Jahren. Der gemittelte Jahresumsatz muss mindestens doppelt so gross sein wie die Angebotssumme für dievorgesehene Aufgabe.

    Evidence

    gemäss Ausschreibungsunterlagen

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK 1

    50 %Price criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Preis

  2. ZK 2

    25 %

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Fachkompetenz

  3. ZK 3

    25 %

    Technischer Bericht

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

4 conditions
Bidding consortia
Allowed

Nimmt die Anbieterin als Bietergemeinschaft am Verfahren teil, muss sie einen Gesellschafter bzw. eine Gesellschafterin bezeichnen, welche/-r die Federführung (Stellvertretung, Koordination) übernimmt. Die Anbieterin führt alle Beteiligten mit den ihnen zugewiesenen Rollen (Funktion/Verantwortung) auf.

Subcontractors
Allowed

Die charakteristische Leistung ist von der Anbieterin zu erbringen und die Beteiligten sind mit den ihnen zugewiesenen Rollen (Funktion/Verantwortung) aufzuführen.
Sub-Subunternehmungen sind nicht zugelassen

Contract extension
Not provided for
Dialogue
Not provided for

Documents to submit

Only evidence that the publication itself names. This evidence belongs in the bid. The tender documents may ask for more.

3 pieces of evidence according to the publication
  • Suitability · EK 1

    gemäss Ausschreibungsunterlagen

  • Suitability · EK 2

    gemäss Ausschreibungsunterlagen

  • Suitability · EK 3

    gemäss Ausschreibungsunterlagen

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
43907
Publication number
43907-01
Covered by international agreements
No
Notice of legal remedies
Show

Gegen diese Verfügung kann gemäss Art. 56 Abs. 1 des Bundesgesetzes über das öffentliche Beschaffungswesen (BöB) innert 20 Tagen seit Eröffnung schriftlich Beschwerde beim Bundesverwaltungsgericht, Postfach, 9023 St. Gallen, erhoben werden. Die Beschwerde ist im Doppel einzureichen und hat die Begehren, deren Begründung mit Angabe der Beweismittel sowie die Unterschrift der beschwerdeführenden Person oder ihrer Vertretung zu enthalten. Eine Kopie der vorliegenden Verfügung und vorhandene Beweismittel sind beizulegen.
Die Bestimmungen des Verwaltungsverfahrensgesetzes (VwVG) über den Fristenstillstand finden gemäss Art. 56 Abs. 2 BöB keine Anwendung. Gestützt auf Art. 52 Abs. 2 BöB kann mit der Beschwerde einzig die Feststellung, dass die vorliegende Verfügung Bundesrecht verletzt, nicht jedoch deren Aufhebung beantragt werden. Ausländische Anbieterinnen sind zur Beschwerde nur zugelassen, soweit der Staat, in dem sie ihren Sitz haben, Gegenrecht gewährt.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Uri: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.