All tenders
Awarded
  • Service
  • BKP 291 Architect
  • BKP 292 Structural/civil engineer
  • +9

Generalplaner Regional für armasuisse Immobilien, Baumanagement Ost

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
All of Switzerland
Procuring office
armasuisse Immobilien
Requesting office
armasuisse Immobilien, Baumanagement Ost
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Lot 1: GP Regional BMO, Kantone Zürich, Thurgau und SchaffhausenAward of 05.02.20266 bids

    • AFRY Schweiz AG, ZürichPrice not published
    • B + S AG, BernPrice not published
    • Hubatka Peyer Architektur AG, JonaPrice not published
  • Lot 2: GP Regional BMO, Kantone Appenzell IR und AR sowie St. Gallen (Nord)Award of 05.02.20265 bids

    • B3 Brühwiler AG Gossau, Gossau SGPrice not published
    • Gruner AG, BaselPrice not published
    • SJB Kempter Fitze AG, HerisauPrice not published
  • Lot 3: GP Regional BMO, Kantone Glarus und St. Gallen (Süd)Award of 05.02.20265 bids

    • Hubatka Peyer Architektur AG, JonaPrice not published
    • Studio Bellora AG, ZugPrice not published
  • Lot 4: GP Regional BMO, Kanton Graubünden (deutschsprachiger Raum)Award of 05.02.20263 bids

    • AFRY Schweiz AG, ZürichPrice not published
    • Studio Bellora AG, ZugPrice not published
Awards of this contracting authority

Justification

Es handelt sich um die zwei vorteilhaftesten Angebote.

Awarded

Justification

Es handelt sich um die zwei vorteilhaftesten Angebote.

Awarded

Justification

Es handelt sich um die drei vorteilhaftesten Angebote.

Awarded

What is being procured?

Scope of work

armasuisse Immobilien, Baumanagement Ost, beabsichtigt mittels Rahmenverträgen drei Generalplaner-Teams für Bauprojekte (Instandsetzungs- und Mieterbedürfnisse) in den Kantonen Zürich, Thurgau und Schaffhausen zu beauftragten. Der Beauftragte erbringt Planerleistungen gemäss SIA LM 112 bzw. fachspezifischen SIA LHO.

Je nach Projektumfang umfasst der Auftrag:

Teilphase 21/22: Machbarkeitsstudie/Projektpflichtenheft

Teilphase 31: Vorprojekt

Teilphase 32: Bauprojekt

Teilphase 33: Militärisches Plangenehmigungsverfahren (Bewilligungsverfahren)

Teilphase 41: Ausschreibung

Teilphase 51: Ausführungsplanung

Teilphase 52: Realisierung

Teilphase 53: Inbetriebnahme / Abschluss / Dokumentation

Das jährliche Stundenbudget für das Los 1 beträgt insgesamt rund 6'000 Stunden.

Key facts, codes and options

Type of contract
Service
Procedure
Selective procedure
Trades
  • BKP 291 – Architect
  • BKP 292 – Structural/civil engineer
  • BKP 293 – Electrical engineer
  • BKP 294 – HVAC engineer
  • BKP 295 – Sanitary engineer
  • BKP 297.3 – Building physicist
  • BKP 297.4 – Acoustic engineer
  • BKP 297.5 – Technical co-ordinator
  • BKP 297.6 – Building automation engineer
  • BKP 298.5 – Fire engineer
  • BKP 299 – Miscellaneous
CPV
  • CPV 71240000 – Architectural, engineering and planning services
CPC
CPC 3d347dc3-c815-4ec1-8e39-637046ba6f27 – Architectural services; engineering services and integrated engineering services, urban planning and landscape architectural services; related scientific and technical consulting services; technical testing and analysis services
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
20926
Publication number
20926-10
Covered by international agreements
Yes

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.