Awarded
- Construction and installation
Modification de la géométrie des giratoires de la Métralie, de Cloux-Roussier et du Viaduc Nord, sur les RC no T9 St-Maurice - Brig et 630 Raccordement N9-T9 Sierre-Est, sur le territoire de la Ville de Sierre
- Location
- Canton VS
- Procuring office
- DMTE, Service de la mobilité, arrondissement 2, Valais central
Awarded
Awarded to
- Epiney Construction SA, SierreCHF 2’767’359.40
What is being procured?
Scope of work
Réaménagement complet de 3 giratoires, réseaux souterrains, signalisation et
marquage, ouvrages en métal et systèmes de retenue
Quantités principales :
Terrassements (déblais et fouilles) : 2’675 m3
Grave non traitée : 1’070 m3
Béton bitumineux : 3’255 t
Bordures : 2’255 m1
Réseaux souterrains – eaux claires : 905 m1
Béton : 65 m3
Potences de signalisation : 2 p
Panneaux avancés de signalisation : 7 p
Marquage : 3'000 m
Systèmes de retenue : 250 m
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Design and execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 7774
- Publication number
- 7774-02
- Covered by international agreements
- No
More in the guide