Awarded
- Construction and installation
- BKP 281.6 Floor tiling
- BKP 282.4 Wall tiling
- +1
Transformation EMS de l'Orme - 28160 - Carrelages
- Location
- Canton VD
- Procuring office
- Fondation de l'Orme (AAPA SA)
- Requesting office
- Fondation de l'Orme
Awarded
Awarded to
- Entreprise Jean Lanoir SA, Les AcaciasCHF 690’610.00
What is being procured?
Scope of work
Travaux de réalisation de revêtement de sol et de parois en carrelage dans le cadre de la transformation de l'EMS de l'Orme. Le bâtiment doit attendre une performance équivalente au standard Minergie ECO
Étendu du marché :
- Surface de plancher (SP) : 4'464 m2
- Surface nette (SN) : 3'931 m2
- Surface de référence énergétique (SRE) : 3'991 m2
- Volume bâti (VB) : 13'261 m3
- Nombre de chambres/lits : 58
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 281.6 – Floor tiling
- BKP 282.4 – Wall tiling
- NPK 645 – Tiling
- OAG 1.6.1 – Retirement and nursing home
- CPV
- CPV 45431000 – Tiling work
- CPV 45432000 – Floor-laying and covering, wall-covering and wall-papering work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 3922
- Publication number
- 3922-02
- Covered by international agreements
- Yes