Die ARGE Tschudin Urech Bolt AG & EMP präsentierte sich mit einem kompetent besetzten Team und der insgesamt günstigsten Honorarofferte. Die detaillierte Auftrags- und Risikoanalyse sowie die passenden Referenzen zeigen eine klare fachliche Eignung, während die Gestaltungsvision und das Haustechnikkonzept sorgfältig ausgearbeitet sind, jedoch in der weiteren Bearbeitung noch Präzisierungen benötigen.
- Service
- BKP 291 Architect
- BKP 292 Structural/civil engineer
- +8
Planner selection process for the refurbishment and conversion of the building at Hauptstrasse 1, 5200 Brugg
- Location
- Canton AG
- Procuring office
- Stadt Brugg, Abteilung Planung & Bau
Awarded
Awarded to
- Tschudin Urech Bolt AG, Brugg AGCHF 1’519’117.00
What is being procured?
Scope of work
Planerwahlverfahren
Generalplanerteam
Verwaltungsgebäude
Gemäss Dokument A_Allg. Verfahrensbed. Pflichtenheft
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Service
- Procedure
- Open procedure
- Trades
- BKP 291 – Architect
- BKP 292 – Structural/civil engineer
- BKP 293 – Electrical engineer
- BKP 294 – HVAC engineer
- BKP 295 – Sanitary engineer
- BKP 297.3 – Building physicist
- BKP 297.4 – Acoustic engineer
- BKP 297.5 – Technical co-ordinator
- BKP 297.6 – Building automation engineer
- BKP 298.5 – Fire engineer
- CPV
- CPV 71000000 – Architectural, construction, engineering and inspection services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 27770
- Publication number
- 27770-02
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.