- Construction and installation
Tender for masonry work «Substructures SES and AP Avegno-Gordevio»
- Procuring office
- Società Elettrica Sopracenerina SA (SES)
At a glance
- 09.12.2026, 10:0028 days left
- Construction and installation
- Open procedure
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Mandatory site visit: check the dateImportant
According to the publication, attending is mandatory; date and place are in the note. Check there whether the visit is still ahead: missing it risks exclusion.
Bid languageNote
The bid must be in Italian.
No bidding consortiumNote
A joint bid with other companies is not allowed.
3 more notes
Subcontracting limitedGood to know
The publication limits subcontracting, for example by share or by requiring consent.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
Posa di un nuovo bauletto portacavi elettrico della Società Elettrica Sopracenerina SA (SES) quale collegamento per la linea 50 kV della Vallemaggia e posa di una nuova condotta dell'acqua potabile comunale. Le nuove infrastrutture saranno posate nel tratto compreso tra i grotti di Avegno e la discarica di Gordevio, su una tratta complessiva di 1'160 m.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45231000 – Construction work for pipelines, communication and power lines
- Options
- Not provided for
- Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 06.11.2026
- Express interest beforenext
- 18.11.2026
- Documents available
- 06.11.2026 to 18.11.2026
- Questions until
- 25.11.2026
Le risposte alle domande verranno trasmesse a tutti i concorrenti iscritti.
- Submission deadline
- 09.12.2026, 10:00
- Opening of bids
- 09.12.2026, 10:05, 6600 Locarno, public
Presso la Società Elettrica Sopracenerina SA (SES) a Locarno.
- Bid valid
- 360 days after the deadline
- Execution
I lavori sono da eseguire nel periodo tra metà gennaio 2027 e metà marzo 2027, successivamente tra metà ottobre 2027 e metà marzo 2028.
I lavori per le tappe all'esterno della ciclopista possono essere eseguite al di fuori dei periodi sopra indicati.
Site visit
Mandatory according to the publicationSopralluogo obbligatorio in comune previsto per mercoledì 18.11.2026 alle 10.00
Luogo di incontro presso il posteggio del grotto "Mai Morire" ad Avegno (coordinate CN 2'700'817 / 1'118'447).
La partecipazione è Obbligatoria. L'orario è perentorio, è determinante l'orologio del numero tel. 161.
Submission & documents
By post or delivery in person
Società Elettrica Sopracenerina SA (SES)Direzione lavori genio civilePiazza Grande 56600 LocarnoSource: simap data
- Documents on simap.ch (after signing in)
- Italian
- Italian
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Award criteria, Conditions of participation, Documents to submit.
Participation & suitability
2 eligibility criteria
1
Ottemperare gli art. 34 RLCPubb.
2
TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.
Aver conseguito, negli ultimi 3 anni (dal 2023 al 2025), lavori da impresario costruttore per condotte sotterranee con importo complessivo superiore a 100'000 CHF, in cui almeno 2 lavori superiori a 30'000 CHF (IVA esclusa). Per lavori iniziati prima del 2023 o lavori in corso fa stato l'importo equivalente ai lavori realizzati durante gli anni 2023-2025.
Award criteria
50% Economicità
25% Attendibilità dell'offerta
17% Referenze in lavori analoghi
5% Formazione apprendisti
3% Perfezionamento professionale
Conditions
4 conditions
- Bidding consortia
- Not allowed
- Subcontractors
- Not given
Possono essere subappaltati unicamente i lavori specialistici.
- Contract extension
- Not provided for
- Dialogue
- Not provided for
Official source
- simap project number
- 46837
- Publication number
- 46837-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
Contro il bando e i documenti di gara è data facoltà di ricorso al Tribunale cantonale amministrativo del Cantone Ticino, Via Pretorio 16, 6900 Lugano, entro 10 giorni dalla messa a disposizione dei documenti di gara. Il ricorso non ha effetto sospensivo.