All tenders
Open · 99 days left
  • Supply

GIS Container Verbois

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
Swissgrid AG - Asset & Maintenance
Requesting office
Swissgrid AG
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
18.02.2027, 23:5999 days left
Type
Supply
Procedure
Open procedure
Site visit
Not mandatory

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • Securities requiredNote

    The publication names a surety, guarantee or deposit. Clarify costs with your bank early.

    Die Erfüllungsgarantie, Mängelhaftungsgarantie und Gewährleistung sind in den Verträgen geregelt. From «Securities and guarantees»

  • No bidding consortiumNote

    A joint bid with other companies is not allowed.

    From «Bidding consortia»

4 more notes
  • References requiredNote

    For eligibility you need comparable reference projects. Check number, age and size.

    EK2 – Referenzen GIS des Unternehmens From «Eligibility criteria»

  • Subcontracting limitedGood to know

    The publication limits subcontracting, for example by share or by requiring consent.

    Die nachträgliche Beauftragung oder Austausch von Subunternehmen darf erst nach vorgängiger schriftlicher Zustimmung der Swissgrid erfolgen. From «Subcontractors»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    From «Variants»

  • Price counts 60 %Good to know

    Price makes up 60 % of the evaluation.

    From «Award criteria»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Language of the publication

Lieferung, Montage und Inbetriebnahme von zwei 220-kV-GIS Felder, installiert in Containern mit folgenden Leistungen:

▪ Projektleitung und Engineering

▪ Zwei GIS Module in Container

▪ Prüfung und Abnahme im Werk (FAT)

▪ Verpackung und Transport

▪ Montage vor Ort mit Funktionskontrolle

▪ Hochspannungsprüfung

▪ Prüfung der gesamten Messkette

▪ Inbetriebsetzung (IBS) / Inbetriebnahme

▪ Probebetrieb

▪ Schulung

Die detaillierten Leistungen sind im Verzeichnis C100 spezifiziert.

Key facts, codes and options

Type of contract
Supply
Type of supply
Contract for work
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 31200000 – Electricity distribution and control apparatus
  • CPV 31214000 – Switchgear
  • CPV 31230000 – Parts of electricity distribution or control apparatus
  • CPV 45315700 – Switching station installation work
Options
Provided for

Details in den Dokumenten C100

Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
04.11.2026
Express interest beforenext
08.12.2026
Documents available
04.11.2026 to 08.12.2026
Questions untilnext
08.12.2026

Es werden keine mündlichen Auskünfte erteilt. Fragen zu den Ausschreibungsunterlagen werden nur
schriftlich mittels Formular «02_Anbieterinnenfragen_und_Antworten.docx» bis zum Datum unter Kapitel 5 via SAP Ariba «Event Messenger Funktion» mit dem Betreff: «GIS_Container_Verbois-

Doc3315112875 Anbieterinnenfragen [Firmennamen]» entgegengenommen. Fragen, die verspätet eintreffen, können nicht mehr beantwortet werden. Die anonymisierten Fragen und deren Antworten werden allen Anbieterinnen, welche sich für diese Ausschreibung in Ariba angemeldet haben in SAP Ariba zur Verfügung gestellt. Fragen, die verspätet eintreffen, können nicht mehr beantwortet werden. Die Fragestellerinnen bleiben anonym. Den Anbieterinnen obliegt es, bis zum Zuschlag unter den E-Mail-Adressen, die sie für die Anmeldung bei SIMAP sowie Ariba verwendet haben, erreichbar zu sein, z.B. für Mitteilungen der Vergabestelle. Sind nach Auffassung der Anbieterin Leistungen, welche für das beschriebene Projekt notwendig sind, unklar, unvollständig, unmöglich oder nicht im Leistungsverzeichnis bzw. Technische Spezifikation enthalten oder beschrieben, so sind bei der Fragestellung diese zu erwähnen bzw. nachzufragen.

Submission deadline
18.02.2027, 23:59
Opening of bids
19.02.2027, not public
Bid valid
180 days after the deadline
Contract
01.06.2027 to 06.08.2029
Execution
01.06.2027 to 06.08.2029

Details in den Dokumenten C100

Site visit

Note of the contracting authority (date, time and place as published)

Keine

Special deadlines and formal requirements

Die Anmeldung zur Teilnahme, die Anmeldung im SAP-Ariba Netzwerk, die offizielle Bestätigung der Teilnahme, die Angebotsstellung, die Qualifizierung für die ausgeschriebene Warengruppe und die Angebotseinreichung erfolgen gemäss Dokument «DE-FR-IT-EN-Angebotseinreichung-Submissions_OV_SAP_Ariba.pdf» und gemäss Kapitel 3.5 der «01_Verfahrensanweisung.pdf».
Es empfiehlt sich für die im Dokument «DE-FR-IT-EN-Angebotseinreichung-Submissions_OV_SAP_Ariba.pdf» geforderten Prozessschritte genügend Zeit einzurechnen und diese frühzeitig vorzusehen. Insbesondere auch für die in Eignungskriterium EK1 geforderten Angaben zur Qualifizierung für die ausgeschriebene Warengruppe.

Das Angebot ist schriftlich, vollständig und fristgerecht auf SAP-Ariba elektronisch einzureichen. Zugelassen sind lediglich Komprimierte Dateien im *.ZIP Format. Andere Formate wie *.7z etc. sind nicht zugelassen.

Angebote dürfen nicht per E-Mail und nicht per Postdienstleiter eingereicht oder persönlich überbracht werden, respektive werden nicht vor Ort bei Swissgrid entgegengenommen.
Es obliegt der Anbieterin genügend Zeit für die Angebotseinreichung via SAP-Ariba vorzusehen und das Angebot zeitgerecht hochzuladen.

Nicht vollständig ausgefüllte Angebote werden von der Evaluation und Vergabe ausgeschlossen.

Submission & documents

According to the simap data. We submit nothing for you.

  • Special submission route

    Das Angebot ist schriftlich, vollständig und fristgerecht auf SAP-Ariba elektronisch einzureichen. Zugelassen sind lediglich Komprimierte Dateien im *.ZIP Format. Andere Formate wie *.7z etc. sind nicht zugelassen.

    Angebote dürfen nicht per E-Mail und nicht per Postdienstleiter eingereicht oder persönlich überbracht werden, respektive werden nicht vor Ort bei Swissgrid entgegengenommen.

    Es obliegt der Anbieterin genügend Zeit für die Angebotseinreichung via SAP-Ariba vorzusehen und das Angebot zeitgerecht hochzuladen.

    Nicht vollständig ausgefüllte Angebote werden von der Evaluation und Vergabe ausgeschlossen.

    Die Sprache für Angebote entspricht den definierten Ausnahmen in Art. 21 Abs. 2 und Abs. 3 lit. a, Art. 22 Abs. 2 sowie Art. 23 jeweils VöB .

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German

Dies entspricht den definierten Ausnahmen in Art. 21 Abs. 2 und Abs. 3 lit. a, Art. 22 Abs. 2 sowie Art. 23 jeweils VöB.

Cost of the documents
Free of charge
Note on obtaining the documents

Die vollständigen Ausschreibungsunterlagen stehen exklusiv hier auf SIMAP während dem angegebenen Zeit-Fenster zum Download bereit.

Für die Teilnahme an der Ausschreibung ist ein Account bei SAP-Ariba zwingend notwendig. Falls Sie ein Angebot abgeben wollen, bitten wir Sie frühzeitig ihre Teilnahme gemäss Dokument «DE-FR-IT-EN-Angebotseinreichung-Submissions_OV_SAP_Ariba.pdf» Kapitel 1 bei der in dieser Publikation aufgeführten E-Mail Adresse anzumelden.

Weitere Erläuterungen auch unter: https://www.swissgrid.ch/de/home/about-us/procurement.html#digital- procurement

Questions to the contracting authority
Through an external system as stated in the tender.TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

7 eligibility criteria
  1. EK1 – Lieferantenqualifizierung via SAP-Ariba

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

    Evidence

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  2. EK2 – Referenzen GIS des Unternehmens

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

    Evidence

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  3. EK3 – Eigene Fertigungsstätte für GIS

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

    Evidence

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  4. EK4 – QM-System (ISO 9001) / UM-System (ISO 14001) / ASM-System (ISO 45001) oder vergleichbare Systeme

    TEXFY assessment: What this means: Certificate – whether your company meets a required certificate or standard, such as ISO.

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

    Evidence

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  5. EK5 – Einhaltung der Generellen Teilnahmebedingungen

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

    Evidence

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  6. EK 6 - Erfüllung der zwingenden Anforderungen (Musskriterien)

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  7. EK7 – Akzeptanz der Konditionen in den Verträgen

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

    Evidence

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK1 – Preis

    60 %max. 600 pointsPrice criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Bewerteter Angebotspreis inkl. kapitalisierter Stundensätze und Optionen

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  2. ZK2 – Technik und Qualität

    20 %max. 200 points

    TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  3. ZK3 – Auftrags- und Risikoanalyse

    10 %max. 100 points

    TEXFY assessment: What this means: Approach – how you tackle the contract, described in a concept or an analysis of the task.

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  4. ZK4 – Schlüsselpersonen

    5 %max. 50 points

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  5. ZK5 – Nachhaltigkeitsbestrebungen

    5 %max. 50 points

    TEXFY assessment: What this means: Sustainability – environmental and social aspects of your offer, such as energy, materials or transport.

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

12 conditions
Bidding consortia
Not allowed
Subcontractors
Allowed

Subunternehmen sind zugelassen. Die Anbieterin kann für einzelne Teilarbeiten Subunternehmen zuziehen, jedoch nicht für die Rolle der Projektleitung. Subunternehmen sind durch die Anbieterin zu beauftragen. Deren Aufwand ist im Angebot einzurechnen. Es liegt jedoch in der Verantwortung der Anbieterin sicherzustellen, dass die von Swissgrid geforderten Verfahrensgrundsätze auch von deren Subunternehmen eingehalten werden. Die nachträgliche Beauftragung oder Austausch von Subunternehmen darf erst nach vorgängiger schriftlicher Zustimmung der Swissgrid erfolgen.
Die Umgehung einer Beauftragung von Subunternehmen mittels Personalverleih ist nicht zulässig.

Subunternehmen können durch die Bestellerin zurückgewiesen werden. Die Arbeiten dürfen nicht nochmals an eine weitere Subunternehmen weitergegeben werden.

Es dürfen maximal 50% der Leistungen durch Subunternehmen ausgeführt werden. (Nicht als Subunternehmerin gelten Konzerngesellschaften der Anbieterin oder Sublieferanten (Kaufvertrag))

Mehrfachbewerbungen von Subunternehmen ist zulässig.

Contract extension
Possible
Dialogue
Not provided for
Securities and guarantees

Die Erfüllungsgarantie, Mängelhaftungsgarantie und Gewährleistung sind in den Verträgen geregelt.

Terms of payment

Die Zahlungsbedingungen sind im Vertrag geregelt.

Costs included in the bid price

Alle anfallenden Kosten und Nebenkosten, die im Zusammenhang mit der ordentlichen Erfüllung des Auftrages stehen, sind einzubeziehen (wie z.B. Spesen, Mehrwertsteuer, Versicherung, Transportkosten etc.). Kosten, welche in den Formularen D2/D3 nicht speziell ausgewiesen sind (dazu gehören u.a. insbesondere EDV, Deplacement, Datentransfer, Datenverwaltung während der Bearbeitung, Sitzungen inkl. Protokollführung, telefonische Rückfragen bei Unklarheiten, Qualitätskontrollen, Materialkosten usw.), sind einzubeziehen. Für den Werkvertrag wird kein Teuerungsausgleich gewährt. Für die optionale SLA Leistung gelten die dafür vorgesehenen Regelungen zur Preisgleitung.

Terms and conditions

Allgemeine Geschäftsbedingungen für Werkverträge (Ausgabe 2024)

Other requirements

Es wird empfohlen zuerst das Dokument „01_Verfahrensanweisung.pdf“ zu lesen und anschliessend die Dokumente C100. Danach die restlichen Ausschreibungsunterlagen konsultieren.

Previously involved bidders

Keine

Bidders from states outside the WTO agreement

Keine

Further information on the conditions

Die Anbieterin trägt sämtliche Kosten, die mit der Erstellung des Angebotes in Zusammenhang stehen.

Das Submissionsverfahren kann aus den im Gesetz genannten Gründen, z.B. wegen fehlenden Wettbewerbs, entschädigungslos abgebrochen werden.

Weiter behält sich die Bestellerin das Recht vor, das Submissionsverfahren entschädigungslos abzubrechen, wenn die nötigen behördlichen Bewilligungen wie Konzessionserteilung, Baubewilligungen oder die internen Organe die finanziellen Mittel nicht sprechen oder keine Genehmigung erteilen. Die Zuschlagserteilung erfolgt jedenfalls nach Erhalt der Baubewilligung.

Das Angebot mit sämtlichen Dokumenten muss unter Berücksichtigung sämtlicher in der Schweiz im Zeitpunkt der Angebotseinreichung geltenden gesetzlichen Bestimmungen und technischen Standards, wie Normen, Richtlinien etc. (IEC / SIA / SNV oder gleichwertige) ausgearbeitet werden.

Sämtliche Bezügerinnen der Ausschreibungsunterlagen sind verpflichtet, diese vertraulich zu behandeln.
Sämtliche von der Bestellerin zur Verfügung gestellten Projektgrundlagen stehen im geistigen Eigentum der Bestellerin. Die Anbieterin hat einen urheberrechtlichen Schutz an ihrem Angebot. Die Bestellerin ist nur berechtigt, die darin enthaltenen Informationen im Zusammenhang mit dem vorliegenden Vergabeverfahren zu nutzen. Jede Veröffentlichung oder anderweitige Weitergabe dieser Informationen an Dritte bedarf der vorherigen schriftlichen Zustimmung der Anbieterin.

Die Angaben der Anbieterin müssen an den in den Dokumenten dafür vorgesehenen Tabellen, Textfelder oder Abschnitten erfolgen. Querverweise auf Anhänge, andere Abschnitte in den Dokumenten oder zusätzliche Dokumente der Anbieterin sind nicht zulässig, ausser wenn dies explizit durch die Beschaffungsstelle so gefordert wird (z.B. Projektplanung als A3 Anhang). Inhalte, welche explizit nicht an den geforderten Stellen/Abschnitten eingefügt und in der geforderten Abgabeform abgegeben wurden, werden als „nicht beurteilbar“ mit 0 Punkten bewertet.

Vorbefassung und Vermeidung von Interessenskonflikten (gemäss Art. 11 lit. b und Art. 14 Abs. 1 im BöB):

Die Gruner Stucky SA ist für dieses Projekt die von Swissgrid mandatierte Planerin. Damit hat sie
wesentliche Teile der Ausschreibungsspezifikation erstellt und nimmt diverse Funktionen innerhalb dieses

Projektes wahr. Die Gruner Stucky SA ist daher als Anbieterin und als Subunternehmerin nicht

zugelassen.

Mit der Einreichung eines Angebotes sowie Bestätigung und Erfüllung des EK5 – Einhaltung der Generellen

Teilnahmebedingungen bestätigt die Anbieterin folgendes:

• Die Anbieterin oder deren Subunternehmen sind keine Konzerngesellschaften der Gruner Stucky SA und haben auch in keiner Weise an der Angebotsstellung des Angebotes mitgewirkt.

• falls die Anbieterin und/oder ihre Subunternehmerinnen einen staatlichen und/oder teilöffentlichen

Hintergrund hat (vollständige oder teilweise Finanzierung und/ oder Beteiligung durch einen Staat,

den Bund, Kantone oder Gemeinden), bestätigt die Anbieterin und/oder ihre Subunternehmerinnen

das Vorhandensein einer gesetzlichen Marktbetätigungserlaubnis und die wettbewerbsneutrale, d.h.

nicht quersubventionierte, Ausgestaltung ihrer Offerte

• dass die Anbieterin keine unzulässigen Wettbewerbsabreden bei der Ausgestaltung dieser Offerte

getroffen hat

Sanktionsrecht:
Die Anbieterin bestätigt ausserdem, dass sie die «Verordnung vom 4. März 2022 über Massnahmen im Zusammenhang mit der Situation in der Ukraine» (SR 946.231.176.72) in der gegenwärtig bestehenden und künftigen Version einhält bzw. einhalten wird.

Documents to submit

Only evidence that the publication itself names. This evidence belongs in the bid. The tender documents may ask for more.

6 pieces of evidence according to the publication
  • Suitability · EK1 – Lieferantenqualifizierung via SAP-Ariba

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  • Suitability · EK2 – Referenzen GIS des Unternehmens

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  • Suitability · EK3 – Eigene Fertigungsstätte für GIS

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  • Suitability · EK4 – QM-System (ISO 9001) / UM-System (ISO 14001) / ASM-System (ISO 45001) oder vergleichbare Systeme

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  • Suitability · EK5 – Einhaltung der Generellen Teilnahmebedingungen

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

  • Suitability · EK7 – Akzeptanz der Konditionen in den Verträgen

    Details gemäss Dokument "01_Verfahrensanweisung.pdf"

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
46896
Publication number
46896-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Verfügung kann gemäss Art. 56 Abs. 1 des Bundesgesetzes über das öffentliche Beschaffungswesen (BöB) innert 20 Tagen seit Eröffnung schriftlich Beschwerde beim Bundesverwaltungsgericht, Postfach, 9023 St. Gallen, erhoben werden. Die Beschwerde ist im Doppel einzureichen und hat die Begehren, deren Begründung mit Angabe der Beweismittel sowie die Unterschrift der beschwerdeführenden Person oder ihrer Vertretung zu enthalten. Eine Kopie der vorliegenden Verfügung und vorhandene Beweismittel sind beizulegen.
Die Bestimmungen des Verwaltungsverfahrensgesetzes (VwVG) über den Fristenstillstand finden gemäss Art. 56 Abs. 2 BöB keine Anwendung.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Geneva: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.