- Construction and installation
New Building 07B / Cost Group 241 / Geothermal Boreholes
- Procuring office
- Spitalanlagengesellschaft HOCH Health Ostschweiz
- Requesting office
- Spitalanlagengesellschaft Kantonsspital St. Gallen
At a glance
- 08.12.2026, 23:5927 days left
- Construction and installation
- Open procedure
- Not stated
- In the documents
- Not stated
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in German.
No bidding consortiumNote
A joint bid with other companies is not allowed.
Subcontracting limitedGood to know
The publication limits subcontracting, for example by share or by requiring consent.
2 more notes
Online via simap onlyGood to know
Bids are submitted on simap.ch; you need a bidder account there.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
The tender for geothermal boreholes covers the installation of the geothermal probe system for Building 07B at St. Gallen Cantonal Hospital. The scope of work includes site establishment, drilling operations, and the supply, installation, and complete backfilling of the geothermal probes in accordance with the tender documents.
The scope also includes the horizontal connection pipes and their connection to the geothermal probe manifolds, including all required earthworks. The system must be flushed, tested for tightness and flow rate, and filled in accordance with the design specifications. All completed works and tests must be documented.
The interface with the building-side heating system is defined by the handover points specified in the tender documents. All works must be coordinated with the contractors involved and the construction management team.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Provided for
Zusätzlich zum oben definierten Ausschreibungsgegenstand können zusätzliche notwendige Erweiterungen
der Erdwärmesonden und weitere Ersatzinvestitionen für HOCH auf der Basis dieser Ausschreibung und der
angebotenen Preise gestützt auf Art. 21 Abs. 2 der IVöB im freihändigen Verfahren vergeben werden. - Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 28.10.2026
- Questions untilpast
- 09.11.2026
- Submission deadlinenext
- 08.12.2026, 23:59
- Opening of bids
- 09.12.2026, not public
- Bid valid
- until 10.06.2027
- Contract
- 04.01.2027 to 20.12.2030
- Execution
- 04.01.2027 to 30.10.2029
Submission & documents
Online via simap.ch
Source: simap data
- Documents on simap.ch (after signing in)
- German
- German
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Conditions of participation, Documents to submit.
Award criteria
AC 1 Prise
Price criterion
TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.
Net tendered contract price, including VAT, as stated in the tender summary reviewed and adjusted by the Client (Part B, Tender and Supporting Documents for the Award Procedure for Construction Works; KBOB Document No. 13).
AC 2 Company References
TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.
Company references demonstrating the completion of five projects comparable to the intended assignment, particularly with regard to execution in a hospital environment, within the five years preceding the tender submission deadline.
Form 4 (Part B, Tender and Supporting Documents for the Award Procedure for Construction Works; KBOB Document No. 13) must be used to provide the required information.
AC 3 Sustainability
TEXFY assessment: What this means: Sustainability – environmental and social aspects of your offer, such as energy, materials or transport.
Is not assessed separately. The sustainability requirements stipulated in the other tender documents remain binding.
AC 4 Quality
TEXFY assessment: What this means: Quality – how well your service meets the requirements, assessed on the information requested.
Development of an effective, project-specific quality management system (PQM), including an analysis of the risks, potential mitigation measures and opportunities (contract analysis). Compliance with the concepts specified by the client and the specialist planners. Complete provision of all information required in the bill of quantities.
Particular emphasis will be placed on the key personnel designated for the project (Project Manager and Deputy Project Manager). They must demonstrate at least five years of industry experience. Supporting evidence must be submitted as appendices to Forms 5, 6 and 8 (Part B, Tender and Supporting Documents for Procurement Procedures for Construction Works; KBOB Document No. 13).
AC 5 Organisation
TEXFY assessment: What this means: Organisation – how your company and team are set up for the contract.
Project-specific organizational chart showing the designated personnel and their responsibilities; overview of human and technical resources, particularly the site facilities and installations; machinery concept, including the equipment and drilling rigs to be used; resource concept describing resource allocation and deployment planning; work processes and execution methods; and a description of the planned inspection, monitoring, and testing procedures.
The supporting documentation must be submitted as annexes to Form 3 (Part B, Tender and Supporting Documents for Procurement Procedures for Construction Works; KBOB Document No. 13).
Jedes Kriterium wird mit einer Note (N) zwischen 0 - 5 in Schritten von ganzen Punkten bewertet.
Anschliessend werden pro Kriterium die Wertungen mit den Gewichtungen (G) multipliziert. Das Angebot mit
der höchsten Punktzahl (P) erhält den Zuschlag.
Conditions
4 conditions
- Bidding consortia
- Not allowed
- Subcontractors
- Allowed
Die charakteristische Leistung ist vom Anbieter zu erbringen und die Beteiligten sind mit den ihnen
zugewiesenen Rollen (Funktion/Verantwortung) aufzuführen. Sub-Subunternehmer sind nicht zugelassen. - Contract extension
- Not provided for
- Dialogue
- Not provided for
Official source
- simap project number
- 46513
- Publication number
- 46513-01
- Covered by international agreements
- Yes
- Notice of legal remedies
ShowHide
Gegen diese Verfügung kann innert 20 Tagen seit Publikation auf www.simap.ch beim Verwaltungsgericht des Kantons St.Gallen, Webergasse 8, 9001 St.Gallen, schriftlich Beschwerde erhoben werden (Art. 52 Abs. 1 i.V.m. Art. 56 der Interkantonalen Vereinbarung über das öffentliche Beschaffungswesen [sGS 841.51]). Die Frist ist eingehalten, wenn die Beschwerde spätestens am letzten Tag der Frist beim Gericht eingereicht oder zu dessen Handen der Schweizerischen Post oder einer schweizerischen diplomatischen oder konsularischen Vertretung übergeben wird (Art. 143 Abs. 1 der Schweizerischen Zivilprozessordnung [SR 272] i.V.m. Art. 30 Abs. 1 des Gesetzes über die Verwaltungsrechtspflege [sGS 951.1]). Die Beschwerde muss einen Antrag sowie eine Darstellung des Sachverhaltes und eine Begründung enthalten. Sie ist zu unterzeichnen und im Doppel einzureichen. Diese Verfügung ist beizulegen. Es gelten keine Gerichtsferien.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.