Son offre remplit en effet pleinement les conditions qui lui permettent d’être adjudicataire selon le Règlement sur la passation des marchés publics du 17 décembre 2007 (L 6 05.01) et a ainsi été jugée économiquement la plus avantageuse.
- Service
- BKP 293 Electrical engineer
- eBKP-H D01 Electrical installations
- +3
FIPOI - CICG 2028 - Mandat de prestations d’ingénieur électricien - CFC293
- Location
- Canton GE
- Procuring office
- FIPOI - Service immobilier
Awarded
Awarded to
- MAB-Ingénierie S.A., MorgesCHF 464’244.00
What is being procured?
Scope of work
Mandat d’ingénierie électricien CFC 293 pour la réalisation des phases SIA 32 à 53 dudit projet
Voir dossier d'appel d'offres pour plus de détails
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Service
- Procedure
- Open procedure
- Trades
- BKP 293 – Electrical engineer
- NPK 500 – Electrical installations
- eBKP-H D01 – Electrical installations
- eBKP-H D03 – Security systems
- eBKP-H D04 – Active fire protection systems
- CPV
- CPV 71334000 – Mechanical and electrical engineering services
- CPC
- CPC 3d347dc3-c815-4ec1-8e39-637046ba6f27 – Architectural services; engineering services and integrated engineering services, urban planning and landscape architectural services; related scientific and technical consulting services; technical testing and analysis services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 35084
- Publication number
- 35084-03
- Covered by international agreements
- No