- Construction and installation
- BKP 273.0 Internal doors
Mont-sur-Rolle. Demolition of the existing hall and construction of a new hall with classrooms
Lot “Demolition and dismantling · Construction work”, one of 2 lots of this project. All lots
- Procuring office
- Commune de Mont-sur-Rolle - Ferrari Architectes
At a glance
- 14.01.2027, 16:3049 days left
- Mont-sur-RolleCanton VD
- Open procedure
- 15.02.2027 to 30.07.2027
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in French.
No bidding consortiumNote
A joint bid with other companies is not allowed.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
1 more note
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
Travaux de fourniture et pose de portes intérieures.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 273.0 – Internal doors
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not provided for
- Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Lots of this project
The contracting authority split the project into 2 tenders, one per lot. Each has its own deadline and is submitted on its own.
- Demolition and dismantling · Construction worktodayuntil 26.11.2026
- Demolition and dismantling · Construction work · This tender49 daysuntil 14.01.2027
Dates
- Published
- 26.11.2026
- Questions untilnext
- 03.12.2026
selon dossier de soumission
- Submission deadline
- 14.01.2027, 16:30
- Bid valid
- 365 days after the deadline
selon dossier de soumission
- Contract
- 15.02.2027 to 30.07.2027
- Execution
- 15.02.2027 to 30.07.2027
selon dossier de soumission, voir planning CFC 273
Site visit
Pas de visite organisée
Special deadlines and formal requirements
Special deadlines and formal requirements
selon dossier de soumission
Submission & documents
By post or delivery in person
Ferrari Architectes Lausanne SAAvenue Benjamin-Constant 11003 LausanneSource: simap data
- Documents on simap.ch (after signing in)
- French
- French
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required).
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Participation & suitability
selon dossier de soumission
Award criteria
selon dossier de soumission
Conditions
5 conditions
- Bidding consortia
- Not allowed
selon dossier de soumission
- Subcontractors
- Allowed
selon dossier de soumission
- Contract extension
- Not provided for
- Dialogue
- Not provided for
- Further information on the conditions
selon dossier de soumission
Official source
- simap project number
- 48331
- Publication number
- 48331-01
- Covered by international agreements
- Yes
- Notice of legal remedies
ShowHide
Le présent appel d’offres peut faire l’objet d’un recours à la Cour de droit administratif et public du Tribunal cantonal, Route du Signal 8 (Palais de Justice de l’Hermitage), 1014 Lausanne, dans les vingt jours dès sa notification par publication ; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.