- Qualités techniques de l’offre - Organisation de base du candidat ou du soumissionnaire - Références du candidat ou du soumissionnaire
- Construction and installation
- BKP 211.0 Site facilities
- BKP 211.3 Trench and minor excavations
- +4
Construction d'un EMS & AEMS - St-Maurice - CFC 211 Maçonnerie-BA + Préfabriqués
- Location
- Canton VS
- Procuring office
- Foyer Saint-Jacques à St-Maurice (Quartal)
- Requesting office
- Foyer Saint-Jacques p.a Quartal Sàrl
Awarded
Awarded to
- Cuénod et Payot Chablais SA, succursale de Collombey-Muraz, CollombeyCHF 6’020’482.80
What is being procured?
Scope of work
Extension d'un EMS et construction d'un AEMS
211 Travaux de maçonnerie BA + préfabriqués
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 211.0 – Site facilities
- BKP 211.3 – Trench and minor excavations
- BKP 211.4 – Drains in building
- BKP 211.5 – Plain and reinforced concrete works
- BKP 211.6 – Masonry
- BKP 212.2 – Precast concrete units
- OAG 1.1.2 – Apartment building
- OAG 1.6.1 – Retirement and nursing home
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 28753
- Publication number
- 28753-02
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.