All tenders
Awarded
  • Construction and installation
  • BKP 232.4 Main circuits and risers

N09.48 MP-160035 - Ant.Villars-Ste-Croix-Vennes - Lot 119 Trav. préparatoires BSA - Dévoiement bus d'énergie (ID 11070)

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton VD
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 22.08.20252 bids

    • Groupe E Connect SA, Granges-PaccotCHF 1’566’056.70 incl. VAT
Awards of this contracting authority

Justification

Es handelt sich um das vorteilhafteste Angebot auf Basis aller Kriterien.

What is being procured?

Scope of work

Language of the publication

Das ASTRA plant die Substanzerhaltung auf dem Abschnitt Villars-Ste-Croix - Vennes (N09-km 1.170 bis 7.180) durch vorgezogene Massnahmen. Die Unterhaltsstrategie für diesen Abschnitt ist die gezielte Sanierung der Infrastruktur, um sicherzustellen, dass während der Realisierung der grossen ASTRA-Baustellen in der Agglomeration Lausanne-Morges keine Eingriffe notwendig sind.

Die vorliegende Ausschreibung betrifft die Vorbereitungsarbeiten für die Umlegung der bestehenden Niederspannungssammelschienen im BSA-Rohrnetz der Autobahn zur Versorgung der Betriebsanlagen der N09. Diese Arbeiten bestehen aus:

- Der Verlegung der zu erhaltenden Feldkästen, die auf provisorischen Trägern versorgt werden, die in unmittelbarer Nähe der bestehenden Schächte installiert werden,

- Den provisorischen Anschlüssen der zu wartenden Geräte, die von den versetzten Feldkästen aus versorgt werden.

- Die Einrichtung einer NS-Energieverteilungsschiene entlang der Autobahnzäune,

- Auf die eventuell notwendigen Anpassungen der bestehenden Schaltkästen, um die provisorischen Kabel aufzunehmen,

- Auf die Trennung der bestehenden Energiebusse,

- Den Anschluss der provisorischen Kabel an die Hauptverteilerschalttafeln und die versetzten Feldkästen,

- Die Kabel der abgeschalteten Energiebusse zu entfernen.

Die Arbeiten erstrecken sich über den Abschnitt N09 zwischen der Sorges-Brücke und der Flon-Brücke.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • BKP 232.4 – Main circuits and risers
CPV
  • CPV 45311100 – Electrical wiring work
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
12120
Publication number
12120-02
Covered by international agreements
Yes

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Vaud: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.