Massgebende Merkmale und Vorteile des berücksichtigten Angebotes: Unter Berücksichtigung und Anwendung der in den Ausschreibungsunterlagen festgelegten Zu-schlagskriterien erweist sich das Angebot der Schultheis-Möckli AG als das vorteilhafteste Angebot (Art. 41 IVöB).
- Construction and installation
- BKP 232 Power wiring
- BKP 233 Luminaires and lamps
- +6
ARA Frauenfeld- Elektroinstallationen Neubau EMV-Stufe und Biologie
- Location
- Canton TG
- Procuring office
- Abwasserverband Region Frauenfeld
Awarded
Awarded to
- Schultheis-Möckli AG, WinterthurCHF 1’737’791.65
What is being procured?
Scope of work
Neubau EMV-Stufe, und Sanierung und Erweiterung der Biologie für die ARA Frauenfeld.
Ausführung aller Elektroinstallationen für die verschiedenen Anlageteile.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 232 – Power wiring
- BKP 233 – Luminaires and lamps
- BKP 236 – Low-current wiring
- BKP 237 – Building automation wiring
- BKP 239 – Miscellaneous
- NPK 510 – General wiring conditions
- NPK 520 – Conductors
- NPK 560 – Building automation
- CPV
- CPV 31300000 – Insulated wire and cable
- CPV 31500000 – Lighting equipment and electric lamps
- CPV 31600000 – Electrical equipment and apparatus
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 1390
- Publication number
- 1390-02
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.