- Construction and installation
MP-100138, N01/42 maintenance depot Wallisellen, new construction - IP network connection
- Procuring office
- Bundesamt für Strassen ASTRA - Filiale Winterthur
At a glance
- 16.12.2026, 23:5935 days left
- Construction and installation
- Open procedure
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in German.
References requiredNote
For eligibility you need comparable reference projects. Check number, age and size.
Securities per contractGood to know
Whether a surety or guarantee is needed is set out in the contract or the documents. Check there.
3 more notes
Subcontracting limitedGood to know
The publication limits subcontracting, for example by share or by requiring consent.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
Das Ziel des vorliegenden Projekts ist es, den neuen Standort des WHW physisch und technisch so zu erschliessen, dass alle geltenden Anforderungen des ASTRA und der GE VII erfüllt werden. Im Rahmen des vorliegenden Auftrags soll die Netzwerkerschliessung des WHW nachhaltig sowie gemäss den geltenden Richtlinien geplant und umgesetzt werden. Dabei erfolgen die Arbeiten in den Zentralen EON, SZG und EBR sowie im Werkhof Wallisellen. Weiter beinhaltet das Los die LWL-Ertüchtigung sowie die LWL-Patchungen und Messungen.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Design and execution
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 45314310 – Installation of cable laying
- CPV 32424000 – Network infrastructure
- CPV 32562000 – Optical-fibre cables
- CPV 45314320 – Installation of computer cabling
- Options
- Not provided for
- Variants
- Not admitted
Pauschal- und Globalangebote und/oder Angebote mit Zeitmitteltarif werden ausgeschlossen.
- Partial offers
- Not admitted
Die Angebote sind vollständig ausgefüllt einzureichen. Abänderungen am Angebotstext sind nicht zulässig. Teilangebote sind ungültig und scheiden aus der Bewerbung aus.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 06.11.2026
- Questions untilnext
- 23.11.2026
Fragen sind in deutscher Sprache unter www.simap.ch im "Forum" einzureichen. Sie werden bis am 03.12.2026 allen Bezügern der Ausschreibungsunterlagen gleichlautend unter www.simap.ch im "Forum" beantwortet. Nach dem 23.11.2026 eintreffende Fragen werden nicht mehr beantwortet.
- Submission deadline
- 16.12.2026, 23:59
- Opening of bids
- 05.01.2027, not public
- Bid valid
- 180 days after the deadline
180 Tage ab Schlusstermin für den Eingang der Angebote.
- Contract
- 30.03.2027 to 30.04.2028
- Execution
- 30.03.2027 to 30.12.2027
Site visit
Es findet keine Begehung statt.
Submission & documents
By post or delivery in person
Bundesamt für Strassen ASTRA - Filiale WinterthurGrüzefeldstrasse 418404 WinterthurSource: simap data
Special submission route
Es ist ein (1) Exemplar des Angebots (der Angebotsunterlagen) in Papierform mit Originalunterschriften einzureichen. Zusätzlich ist das Angebot in elektronischer Form (z.B. auf USB-Stick) einzureichen. Dabei hat es aus einer einzigen PDF-Datei zu bestehen, welche das gesamte physische Angebot umfasst. Einzig Dateien in Spezialformaten sind von dieser Regelung ausgenommen und können separat (nebst dem PDF-File) eingereicht werden.
Einreichung auf dem Postweg:
A-Post oder PostPac Priority (Datum Poststempel einer Schweizerischen oder staatlich anerkannten ausländischen Poststelle; Firmenfrankaturen gelten nicht als Poststempel). Die Anbieter bzw. der Anbieter hat in jedem Fall den Beweis für die Rechtzeitigkeit der Angebotseinreichung sicherzustellen. Verspätete Angebote werden nicht mehr berücksichtigt. Auf dem Couvert ist neben der Projektbezeichnung deutlich der Vermerk "Nicht öffnen - Offertunterlagen" anzubringen.
Persönliche Abgabe:
Die Abgabe hat bis spätestens am oben erwähnten Abgabetermin während den Öffnungszeiten der Loge (07:45 - 11:45 Uhr und 13:15 – 16:45 Uhr (Freitag bis 16:00 Uhr)) gegen Ausstellung einer Empfangsbestätigung zu erfolgen.
Übergabe an eine diplomatische oder konsularische Vertretung der Schweiz:
Ausländische Anbieter können ihr Angebot bis spätestens am oben erwähnten Abgabetermin einer diplomatischen oder konsularischen Vertretung der Schweiz in ihrem Land, während den Öffnungszeiten gegen Ausstellung einer Empfangsbestätigung, übergeben.
Die Anbieter sind in diesem Fall verpflichtet, die Empfangsbestätigung vor dem Abgabetermin per E-Mail der Beschaffungsstelle zu senden.
Auf Angebote, die per E-Mail oder Fax zugestellt werden, wird nicht eingetreten!
Source: simap data
- Documents on simap.ch (after signing in)
- German
- German
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation.
Participation & suitability
4 eligibility criteria
EK 1
TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.
Technische Leistungsfähigkeit
1 Referenzobjekt über abgeschlossene Arbeiten mit vergleichbarer Komplexität und aus dem gleichen Fachbereich.
EK 2
TEXFY assessment: What this means: Obligations – whether your company is registered and complies with taxes, social security contributions and working conditions.
Wirtschaftliche/finanzielle Leistungsfähigkeit
Bestätigung/Nachweis, dass die Jahresumsätze des Anbieters für die Jahre 2024 und 2025 mehr als das doppelte des Jahresumsatzes des Auftrages betragen.
Nach Angebotseingabe auf Verlangen des Auftraggebers einzureichende Eignungsnachweise/Bestätigungen:
- Handelsregister- und Betreibungsregisterauszug,
- Auszug Ausgleichskasse
- AHV/IV/EO/ALV
- Bestätigung UVG-Versicherer
- Bestätigung (der bezahlten Steuern) Steuerverwaltung: Quellensteuer, Bundessteuer, kantonal- und kommunale Steuer oder Mehrwertsteuer Versicherungsnachweise
Allesamt nicht älter als 3 Monate.
EK 3
TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.
Referenz der Schlüsselperson: Baustellenleiter
1 Referenzobjekt über abgeschlossene Arbeiten in gleichwertiger Funktion oder Stv.-Funktion mit vergleichbarer Komplexität und aus dem gleichen Fachbereich.
EK 4
TEXFY assessment: What this means: Subcontracting – how much of the work you may pass on to other companies.
Leistungsanteil Unterakkordant
Bestätigung/Nachweis, dass die Leistungen Subunternehmer maximal 70% betragen.
Alle wirtschaftlich und technisch leistungsfähigen Firmen, die zudem die nachfolgenden Eignungsnachweise erbringen, sind aufgerufen, ein Angebot in CHF zu unterbreiten.
Award criteria
ZK 1
40 %Price criterion
TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.
Preis
ZK 2
30 %
TEXFY assessment: What this means: Schedule – whether your timetable meets the deadlines and is realistic.
Qualität der Ausrüstungen und der Ausführungen beinhaltend:
- ZK2.1 Bauprogramm = 15%
- ZK2.2 Eingesetzte Produkte = 15%
ZK 3
30 %
TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.
Organisation beinhaltend:
- ZK3.1 Organigramm = 10%
- ZK3.2 Schlüsselperson = 20%
Die Angaben betreffend Zuschlagskriterien müssen zusammen mit den (vorgegebenen) Angebotsunterlagen eingereicht werden:
Preisbewertung
Das tiefste bereinigte Angebot erhält die maximale Note (5). Angebote, deren Preis 50% oder mehr über dem tiefsten Angebot liegen, erhalten die Note 0. Dazwischen erfolgt die Bewertung linear (auf 2 Stellen nach dem Komma gerundet). Allfällig offerierte Skonti werden bei der Bewertung des Preises nicht berücksichtigt.
Benotung der übrigen Zuschlagskriterien
Die Bewertung erfolgt immer mit Noten von 0 bis 5:
0 = Nicht beurteilbar; keine Angabe
1 = Sehr schlecht erfüllt; ungenügende, unvollständige Angaben
2 = Schlecht erfüllt; Angaben ohne ausreichenden Projektbezug
3 = Erfüllt, den Anforderungen der Ausschreibung entsprechend
4 = Gut erfüllt; Qualitativ gut
5 = Sehr gut erfüllt; Qualitativ ausgezeichnet, sehr grosser Beitrag zur Zielerreichung
Sofern ein Hauptkriterium aus Subkriterien besteht, werden diese benotet.
Die Punktzahl des Hauptkriteriums ergibt sich aus der Summe der Noten der Subkriterien multipliziert mit ihrer Gewichtung.
Punkteberechnung: Summe aller Noten multipliziert mit ihrer Gewichtung (Maximalpunktzahl: Note 5 x 100 = 500 Punkte).
Conditions
12 conditions
- Bidding consortia
- Allowed
Zugelassen. Die Federführung muss einem Unternehmen der Bietergemeinschaft übertragen werden. Die weiteren Beteiligten sind in den Angebotsunterlagen bekannt zu geben. Mitglieder der Bietergemeinschaft dürfen nach Eingabe der Offerte nicht ausgewechselt werden.
- Subcontractors
- Allowed
Zugelassen. Subunternehmer können zu max. 70% beigezogen werden. Sie sind in den Angebotsunterlagen entsprechend aufzuführen. Angaben betreffend Subunternehmern werden mitbewertet. Die charakteristische Leistung ist grundsätzlich vom Auftragnehmer zu erbringen.
- Contract extension
- Possible
Eine Verlängerung erfolgt abhängig von der Verfügbarkeit der Kredite, des Projektfortschrittes, allfälligen Projektänderungen, der Zustimmung in Linie und nicht zuletzt von der Qualität der bereits erbrachten Leistungen.
- Dialogue
- Not provided for
- Securities and guarantees
Gemäss Ziffer 5 der vorgesehenen Vertragsurkunde.
- Terms of payment
30 Tage nach Rechnungseingang im ASTRA.
- Costs included in the bid price
Die Vergütung und die Preise umfassen sämtliche Leistungen, die in den Ausschreibungsunterlagen genannt und zur Vertragserfüllung notwendig sind.
Die Umlagerung von Einheitspreisen in Globalpositionen wie zum Beispiel die Baustelleneinrichtungen ist strikt verboten.
Der Unternehmer hat alle Positionen des Leistungsverzeichnisses auszufüllen; er schreibt „0“ bei allen Positionen, bei welchen er formell auf die Angabe eines Betrags sowie darauf verzichtet, später eine Vergütung für die betreffende Leistung zu verlangen. Ein solcher Eintrag muss im technischen Bericht begründet werden.
Die Aufsichts- und Führungskosten sowie die Kosten des Zeitaufwands für den Personaltransport dürfen nicht in den Baustelleneinrichtungskosten enthalten sein, sondern müssen gemäss Kalkulationsschema des SBV in den Einheitspreisen enthalten sein.
Gleichermassen müssen alle Endkostenzuschläge wie beispielsweise die technische und die kaufmännische Leitung, die Baustellenführung sowie die Finanzkosten im Kalkulationsschema des SBV in den entsprechenden Rubriken erfasst sein. Diese Kosten dürfen auf keinen Fall in den Baustelleneinrichtungen enthalten sein.
- Terms and conditions
Gemäss vorgesehener Vertragsurkunde.
- Other requirements
1. Vorbehalten bleiben die Beschaffungsreife des Projektes sowie die Verfügbarkeit der Kredite;
2. Die Erarbeitung der Angebote wird nicht vergütet. Die Angebotsunterlagen werden nicht zurückgegeben;
3. Ausschreibungsunterlagen sind in deutscher Sprache erhältlich. Bei Widersprüchen zwischen den Fassungen ist die deutsche Version massgeben;
4. Angebote der Firma Sensor Elektronic GmbH, Adlikerstrasse 79, 8105 Regensdorf oder Angebote, an welchen sich die Sensor Elektronic GmbH in irgendeiner Weise beteiligt, sei es in Bietergemeinschaft, sei es als Subunternehmerin oder Lieferantin, werden gestützt auf Art. 44 Abs. 1 lit. h BöB vom Beschaffungsverfahren ausgeschlossen.- Previously involved bidders
Keine.
- Bidders from states outside the WTO agreement
Keine.
- Further information on the conditions
Gemäss Ausführungen im Pflichtenheft.
Documents to submit
4 pieces of evidence according to the publication
1 Referenzobjekt über abgeschlossene Arbeiten mit vergleichbarer Komplexität und aus dem gleichen Fachbereich.
Bestätigung/Nachweis, dass die Jahresumsätze des Anbieters für die Jahre 2024 und 2025 mehr als das doppelte des Jahresumsatzes des Auftrages betragen.
Nach Angebotseingabe auf Verlangen des Auftraggebers einzureichende Eignungsnachweise/Bestätigungen:
- Handelsregister- und Betreibungsregisterauszug,
- Auszug Ausgleichskasse
- AHV/IV/EO/ALV
- Bestätigung UVG-Versicherer
- Bestätigung (der bezahlten Steuern) Steuerverwaltung: Quellensteuer, Bundessteuer, kantonal- und kommunale Steuer oder Mehrwertsteuer Versicherungsnachweise
Allesamt nicht älter als 3 Monate.
1 Referenzobjekt über abgeschlossene Arbeiten in gleichwertiger Funktion oder Stv.-Funktion mit vergleichbarer Komplexität und aus dem gleichen Fachbereich.
Bestätigung/Nachweis, dass die Leistungen Subunternehmer maximal 70% betragen.
Official source
- simap project number
- 46548
- Publication number
- 46548-01
- Covered by international agreements
- Yes
- Notice of legal remedies
ShowHide
Gegen diese Verfügung kann gemäss Art. 56 Abs. 1 des Bundesgesetzes über das öffentliche Beschaffungswesen (BöB) innert 20 Tagen seit Eröffnung schriftlich Beschwerde beim Bundesverwaltungsgericht, Postfach, 9023 St. Gallen, erhoben werden. Die Beschwerde ist im Doppel einzureichen und hat die Begehren, deren Begründung mit Angabe der Beweismittel sowie die Unterschrift der beschwerdeführenden Person oder ihrer Vertretung zu enthalten. Eine Kopie der vorliegenden Verfügung und vorhandene Beweismittel sind beizulegen.
Die Bestimmungen des Verwaltungsverfahrensgesetzes (VwVG) über den Fristenstillstand finden gemäss Art. 56 Abs. 2 BöB keine Anwendung.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.