- Construction and installation
- BKP 213 Prefabricated steel construction
STEP EHVV - GC03 Metal structures
- Procuring office
- Groupement CSD-WSP-Erbat-DTP (CWED)
- Requesting office
- Association intercommunale pour l’épuration des eaux usées de la région Haute Venoge - Veyron (EHVV)
At a glance
- 13.01.2027, 11:0057 days left
- La SarrazCanton VD
- Open procedure
- 03.05.2027 to 07.05.2029
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in French.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
La future STEP de l'EHVV traitera les eaux usées du bassin versant Haute Venoge Veyron (comunes de Chavannes-le-Veyron, Chevilly, Cuarnens, Dizy, Eclépens, Fereyres, La Chaux, La Praz, La Sarraz, L'Isle, Mauraz, Moiry, Mont-la-Ville, Orny et Pompaples). L'objet de ce lot comprend la construction à neuf des ouvrages métalliques suivants :
- Gazomètre
- Hall photovoltaique
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 213 – Prefabricated steel construction
- CPV
- CPV 45223210 – Structural steelworks
- Options
- Not provided for
- Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 17.11.2026
- Documents available
- 17.11.2026 to 23.04.2027
- Questions untilnext
- 14.12.2026
- Submission deadline
- 13.01.2027, 11:00
- Bid valid
- until 12.01.2028
- Contract
- 03.05.2027 to 07.05.2029
- Execution
selon les éléments donnés dans les documents de l'appel d'offres
Site visit
Aucune
Special deadlines and formal requirements
Special deadlines and formal requirements
selon les éléments donnés dans le règlement de consultation
Submission & documents
By post or delivery in person
Association intercommunale pour l’épuration des eaux usées de la région Haute Venoge - Veyron (EHVV)Etienne Morier-GenoudCase postale 51312 EclépensSource: simap data
Special submission route
Mentionner sur le colis d'envoi du dossier de soumission:
"NE PAS OUVRIR - STEP de l'EHVV - Appel d'offres GC03"
Source: simap data
- Documents on simap.ch (after signing in)
- French
- French
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required).
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Participation & suitability
Conformément aux éléments donnés dans les documents de l'appel d'offres
Award criteria
Conformément aux éléments donnés dans les documents de l'appel d'offres
Conditions
4 conditions
- Bidding consortia
- Not given
Conformément aux éléments donnés dans les documents de l'appel d'offres
- Subcontractors
- Not given
Conformément aux éléments donnés dans les documents de l'appel d'offres
- Contract extension
- Not provided for
- Dialogue
- Provided for
Les échanges concernant les documents de la soumission se font via la plateforme SIMAP uniquement.
Official source
- simap project number
- 47710
- Publication number
- 47710-01
- Covered by international agreements
- Yes
- Notice of legal remedies
ShowHide
Le présent appel d’offres peut faire l’objet d’un recours à la Cour de droit administratif et public du Tribunal cantonal, Route du Signal 8 (Palais de Justice de l’Hermitage), 1014 Lausanne, dans les vingt jours dès sa notification par publication ; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.