The price is not published under public procurement law.
Awarded
- Construction and installation
Submission (offenes Verfahren), Schutzkonzept Süd Phase 2, Etappe 3 (2026), Lieferung und Montage von Schalldämmlüftern
- Location
- Place open, contracting authority in canton ZH
- Procuring office
- Flughafen Zürich AG, Schutzkonzept Süd
Awarded
Awarded to
- SIEGENIA-AUBI AG, UetendorfPrice not published
What is being procured?
Scope of work
Im Rahmen des Schutzkonzepts Süd (SKS) bietet die Flughafen Zürich AG den Hauseigentümern in bestimmten Gebieten an, in Schlafräumen Schalldämmlüfter (SDL) oder wahlweise Fensterschliessmechanismen (FSM) einbauen zu lassen. Mit der vorliegenden Ausschreibung vergibt die Flughafen Zürich AG einen Auftrag für die Lieferung, den Einbau sowie die Inbetriebnahme von Schalldämmlüftern, inklusive Nebenarbeiten, an einen Unternehmer.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- OAG 1.1 – Residential
- OAG 1.6 – Care and health
- OAG 1.9.3 – Hotel
- OAG 1.9.4 – Hostel
- CPV
- CPV 45331210 – Ventilation installation work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 24765
- Publication number
- 24765-02
- Covered by international agreements
- No
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.