All tenders
Awarded
  • Construction and installation
  • BKP 221.0 Timber windows
  • BKP 221.1 Timber/metal windows

Umbau Kirchgasse 16-22

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton ZH
Procuring office
Stadt Kloten
Requesting office
Stadt Kloten, Abteilung Liegenschaften
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 31.03.20266 bids

    • G. Baumgartner AG, HagendornCHF 338’889.61 incl. VAT
Awards of this contracting authority

Justification

Gemäss Stadtratsbeschluss vom 18.02.2026 Gemäss Stadtratsbeschluss vom 31.03.2026

What is being procured?

Scope of work

Wohnhaus mit Gewerbe

Die Liegenschaft besteht aus 5 Geschossen welche über Total 3 Treppenhäuser erschlossen werden. Der Anbau an Haus 22 erstreckt sich ausschliesslich über 2 Geschosse und beherbergt 1 Mietwoh-nung. Das Untergeschoss verfügt über die gewohnten Allgemeinräumen wie auch Lagerräumlichkeiten der Gewerbemieter-/innen Erdgeschoss (Archiv Zivilstandsamt, Lager Bibliothek, Lager Papeterie und Lager Res- tauration Baracca). Im Erdgeschoss liegen die Büro-/ und Gewerberäumlichkeiten der Mieter wie oben be-schrieben, welche jedoch von den Sanierungsmassnahmen soweit als möglich ausgeschlossen sind.

Die 13 Mietwohneinheiten verteilen sich über das 1.+ 2.Obergeschoss mit einer Maisonettewohnung erweitert ins Dachgeschoss. Die Wohnungen weisen grösstenteils die gleichen Grundrisse auf, wenn auch gespiegelt. Alle Wohnungen haben eine ähnliche Grundriss-Struktur. Diese besteht im Wesentlichen aus einem Wohnungszugang mit Treppenhaus, welches pro Geschoss jeweils zwei Wohnungseinheiten erschliesst.

Für den Fensterersatz sind die U-Werte gemäss aktuellen Wärmedämmvorschriften einzuhalten. In jedem Fall ist eine Energienutzungsdeklaration abzugeben.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Execution
Procedure
Open procedure
Trades
  • BKP 221.0 – Timber windows
  • BKP 221.1 – Timber/metal windows
  • OAG 1.1.2 – Apartment building
  • OAG 1.3.5 – Retail outlet
  • OAG 1.3.7 – Office and administrative building
CPV
  • CPV 45421130 – Installation of doors and windows
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
20867
Publication number
20867-02
Covered by international agreements
No

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Zurich: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.