L’offerta più vantaggiosa ottiene l’aggiudicazione
- Service
- BKP 492 Structural/civil engineer
- BKP 497.4 Acoustic engineer
- +2
Nous avons élaboré des plans de protection contre le bruit pour les pl. d’armes d’Airolo, Isone et pour la place de tir de Fontana, afin de respecter l’ordonnance sur la protection contre le bruit. Le présent appel d'offres prévoit de confier à un pl
- Location
- Canton TI
- Procuring office
- armasuisse Immobilien
- Requesting office
- armasuisse Immobilien, Baumanagement Zentral
Awarded
Awarded to
- Filippini & Partner Ingegneria SA, BiascaCHF 991’550.50
What is being procured?
Scope of work
Per i poligoni di tiro Wpl Airolo, Spl Fontana e Wpl Isone sono stati elaborati piani di protezione dal rumore in modo di rispettare l'ordinanza sulla protezione dal rumore.
Il presente bando di gara prevede l'incarico a un progettista generale per la pianificazione e l'attuazione di misure strutturali di protezione dal rumore, comprese le misure di risanamento del terreno, per le fasi 32-53 del SIA.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Service
- Procedure
- Selective procedure
- Trades
- BKP 492 – Structural/civil engineer
- BKP 497.4 – Acoustic engineer
- BKP 498.4 – Environmental engineer
- BKP 499 – Miscellaneous
- CPV
- CPV 71300000 – Engineering services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 1852
- Publication number
- 1852-04