Case no. 26-029: Cité RUBIX phase 2 at level 07 of building BH of the CHUV", CFC no. 244
- Procuring office
- CHUV - Constructions ingénierie technique et sécurité (CIT-S)
At a glance
- 21.12.2026, 11:3033 days left
- Not stated
- LausanneCanton VD
- Open procedure
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Bid languageNote
The bid must be in French.
No subcontractorsNote
Your company must deliver the entire work itself.
Paper onlyGood to know
Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.
1 more note
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
· Garantir la qualité de l'air intérieur : Assurer un apport d'air hygiénique suffisant pour la sécurité et le bien-être des utilisateurs, avec un besoin cible fixé à 13 000 m³/h.
· Assurer le confort thermique : Maintenir des conditions climatiques optimales et stables pour les occupants, aussi bien en période hivernale qu'estivale.
· Optimiser les équipements existants : Mettre en valeur la capacité du monobloc en place (capacité nominale de 13 900 m³/h, actuellement mesurée à 10 000 m³/h) afin d'en exploiter le plein potentiel.
· Assainir et moderniser l'infrastructure : Purger le réseau en supprimant les équipements obsolètes, notamment les batteries et les systèmes de régulation pneumatique vieillissants.
· Simplifier l'exploitation et la gestion : Centraliser et optimiser le pilotage des installations grâce à un contrôle global de la température dédié spécifiquement à la zone du nouvel HDJ.
· Maîtriser les coûts d'investissement : Limiter les dépenses financières en conservant et en réutilisant les installations existantes situées en façade.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Design and execution
- Procedure
- Open procedure
- Trades
- BKP 24 – HVAC installations, building automation
- OAG 1.6.3 – Hospital
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- CPV 45331210 – Ventilation installation work
- Options
- Not provided for
- Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 18.11.2026
- Express interest before
- 10.12.2026
- Documents available
- 18.11.2026 to 21.12.2026
- Questions untilnext
- 07.12.2026
- Submission deadline
- 21.12.2026, 11:30
Submission & documents
By post or delivery in person
CHUV - Constructions ingénierie technique et sécurité (CIT-S)Secretariat du CIT-SRue du Bugnon 211011 LausanneSource: simap data
- Documents on simap.ch (after signing in)
- French
- French
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required).
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Conditions
4 conditions
- Bidding consortia
- Allowed
- Subcontractors
- Not allowed
- Contract extension
- Possible
- Dialogue
- Not provided for
Official source
- simap project number
- 47826
- Publication number
- 47826-01
- Covered by international agreements
- No
- Notice of legal remedies
ShowHide
Le présent appel d’offres peut faire l’objet d’un recours à la Cour de droit administratif et public du Tribunal cantonal, Route du Signal 8 (Palais de Justice de l’Hermitage), 1014 Lausanne, dans les vingt jours dès sa notification par publication ; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.