Awarded
- Construction and installation
- BKP 24 HVAC installations, building automation
- eBKP-H D05.04 Heat distribution
- +1
Aarau, Telli-Hochhaus, BKP 243 Wärmeverteilung
- Location
- Canton AG
Awarded
Awarded to
- Kämpfer AG, OthmarsingenCHF 743’800.65
What is being procured?
Scope of work
Wärmeverteilung für das Projekt Erneuerung HLKS Telli-Hochhaus (Technikzentralen im 1., 9. und 23. OG):
- Demontage der Heizverteilung
- Wärmeverteilung (neue Ringleitung und diverse Lufterhitzeranschlüsse)
- Neuerschliessen der Klimakonvektoren-Verteiler
- Kälteverteilung (neue Ringleitung und diverse Luftkühleranschlüsse)
- Kreisverbundsystem zur Wärmerückgewinnung
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 24 – HVAC installations, building automation
- NPK 450 – Heating installations
- eBKP-H D05.04 – Heat distribution
- OAG 1.3.7 – Office and administrative building
- CPV
- CPV 45331000 – Heating, ventilation and air-conditioning installation work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 6488
- Publication number
- 6488-02
- Covered by international agreements
- No
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.