All tenders
Open · 2 days leftCorrected
  • Construction and installation

Energy performance actions (APE) for the buildings of the CHUV hospital city - Upgrade works for air handling units BH10, MAT01, BH FASOL, BU19 - CFC 244

Published in French. Sign in and TEXFY shows the texts in English. Sign in

Go to the official tender(simap.ch, opens in a new tab)

Corrected publication

Changed according to simap: Site visit, Submission deadline, Question rounds

Remark of the contracting authority

Une seconde visite sera organisée le mercredi 28 octobre à 15h30 au même point de rendez-vous.

La date de remise des offres est repoussée au 13 novembre 2026 14h.

Un tour de question supplémentaire a été ajouté.

First published on 07.10.2026. The current version on simap.ch is authoritative.

At a glance

Deadline
13.11.2026, 14:002 days left
Type
Construction and installation
Procedure
Open procedure
Award weighting
In the documents
Eligibility
In the documents

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Mandatory site visit: check the dateImportant

    According to the publication, attending is mandatory; date and place are in the note. Check there whether the visit is still ahead: missing it risks exclusion.

    La visite du site est obligatoire pour une soumission valable et aura lieu le jeudi 15 octobre 2026 à 13h30. From «Site visit»

  • Tight deadlineImportant

    2 days left to submit. Plan documents, proofs and delivery now.

    From «Submission deadline»

  • Bid languageNote

    The bid must be in French.

    From «Bid languages»

2 more notes
  • Publication correctedNote

    The contracting authority changed details. The current version applies.

    From «Correction»

  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 10.11.2026, 18:02

What is being procured?

Scope of work

Ce marché intègre les travaux suivants:

  • Projet BH10: mise à niveau des périphériques de régulation pneumatiques, pompes, actionneurs des installations de la centrale de ventilation BH10 du bâtiment BH niveau 10
  • Projet MAT01: mise à niveau des périphériques de régulation pneumatiques, pompes, actionneurs des installations de centrale de ventilation MAT01 du bâtiment de la maternité:
  • Projet FASOL: Installation de VAV et mise à niveau de la régulation du de la ventilation de la zone FASOL du bâtiment BH niveau 04 ;
  • Projet BU 19 IST : Mise à niveau de la centrale de traitement d'air de la zone IST du bâtiment BU19 IST

Scope of work of the lots

  • Lot 1 – Projet BH10show

    Modernisation des installations CVC et suppression des commandes pneumatiques du projet BH10, comprenant le local technique en toiture et les équipements du foyer et des locaux annexes au BH08.

    Pour la partie hydraulique (CFC 244)

    • Remplacement des collecteurs et départs chaud/froid, avec circulateurs, vannes à commande électrique, adaptations des raccordements et isolations.
    • Repérage et remplacement des équipements hydrauliques pneumatiques et vétustes concernés au BH08, y compris en faux plafond.
    • Dépose des humidificateurs des cinq auditoires et du foyer, avec suppression du réseau vapeur associé et obturation définitive du branchement.

    Pour la partie ventilation (CFC 244)

    • Remplacement des registres motorisés et des clapets coupe-feu, avec adaptation des gaines.
    • Nettoyage des monoblocs conservés et des gaines concernés, avec réalisation des isolations prévues.

    Pour la partie E-MCR (CFC 236 et 237)

    • Création de nouveaux tableaux et coffrets MCR, avec alimentations électriques, câblage et raccordement des équipements.
    • Reprise des monoblocs existants et de la régulation des installations BH10 et BH08, avec intégration à la supervision CHUV.
    • Dépose du réseau pneumatique concerné.

    Les lots CVC assurent le montage mécanique ; le lot E-MCR assure les raccordements électriques et l’intégration à la régulation.

    Les interventions et mises en service seront phasées avec l’exploitation du CHUV, en tenant compte des accès en faux plafond et des recommandations de la notice amiante.

    Details of Lot 1
  • Lot 2 – Projet MAT01show

    Remplacement des vannes et registres à commande pneumatique par des équipements à commande électrique dans le local technique en sous-sol du projet MAT01, ainsi que suppression de l’humidificateur GP37.

    Pour la partie hydraulique (CFC 244)

    • Dépose des anciennes vannes de régulation, pose des nouvelles vannes de régulation, servomoteurs et sondes, adaptation des raccordements et réfection des isolations.
    • Suppression et obturation du branchement vapeur de l’humidificateur GP37.

    Pour la partie ventilation (CFC 244):

    • Remplacement des registres motorisés et adaptation des gaines existantes.
    • Dépose de l’humidificateur GP37, remplacement par une gaine droite, nettoyage et isolation des installations concernées.

    Pour la partie E-MCR (CFC 236, 237):

    • Adaptation du tableau MCR existant, câblage et raccordement électrique des équipements.
    • Adaptation de la régulation et de la supervision CHUV, puis dépose du réseau pneumatique concerné.

    Les lots CVC assurent le montage mécanique ; le lot E-MCR assure les raccordements électriques et l’intégration à la régulation. Les réglages et mises en service seront coordonnés entre les lots, avec des interventions phasées selon les contraintes d’exploitation du CHUV.

    Details of Lot 2
  • Lot 3 – Projet FASOLshow

    Mise à niveau des installations MCR de la zone avec pour objectif assigné par le CHUV la suppression totale de toute installation fonctionnant en pneumatique dans la zone FASOL

    De nombreux équipement datant de 2003 sont pilotés en pneumatique notamment les boites de détente à débit variables, le prise de mesure notamment les pressions, différentiels de pression

    D’une manière générale il sera prévu :

    Pour la partie CVCR (CFC 244)

    • Le démontage et mise au rebut des équipements obsolètes
    • Un remplacement 1 pour 1 est prévu pour les Boite de détente à débit variable (BDT) motorisés d’usine sur la partie extraction + les adaptions éventuelles mineures sur les raccordements sur réseau de ventilation existant
    • Un remplacement 1 pour 1 est prévu pour les Boite de détente à débit variable (BDT) sur la partie pulsion ou mise en œuvre de registre à débit variable avec organes de mesures stature sur équipement motorisés d’usine + les adaptions éventuels sur les raccordements sur réseau de ventilation existant
    • Fourniture du master de communication pilotant l’ensemble pour intégration dans les armoires MCR nouvellement envisagés

    Pour la partie E-MCR (CFC 236 et 237) :

    • Création de nouveau tableau MCR spécialement dédié en parallèle des installations existantes
    • Les raccordements électriques de ces tableaux depuis les tableaux forces existants situé dans la zone
    • Permutation de certains raccordements servomoteur électriques existants sur les nouveaux tableau MCR
    • Intégration des organes de mesures dorénavant prévue en électrique sur les nouveaux tableau MCR

    Les travaux se déroulement dans des zone sensible classées

    Les interventions seront prévues phasées.

    Details of Lot 3
  • Lot 4 – Projet BU19 ISTshow

    Remplacement des monoblocs de pulsion et d’extraction BU19 IST situés dans le local technique du niveau 05, avec renouvellement des raccordements hydrauliques et des installations E-MCR.

    Le projet est réalisé en interface avec le projet de réaménagement mené par le CHUV au 3ᵉ étage.

    Pour la partie hydraulique :

    • Dépose et réfection des raccordements chaud et froid, avec circulateurs, armatures, comptage et isolation.
    • Réalisation du circuit de récupération de chaleur à eau glycolée entre les deux monoblocs.

    Pour la partie ventilation :

    • Dépose et remplacement des deux monoblocs par des appareils à ventilateurs EC redondants, assemblés sur site.
    • Adaptation des gaines, registres et clapets coupe-feu, avec nettoyage et isolation des réseaux concernés.

    Pour la partie E-MCR :

    • Création d’un nouveau tableau MCR avec automate, alimentations électriques et raccordement des équipements.
    • Intégration des deux nouveaux monoblocs, programmation de leur régulation et raccordement à la supervision CHUV.
    • Reprise des informations des 16 VAV et de clapets coupe-feu.
    • Dépose du réseau pneumatique concerné.

    Le fournisseur des monoblocs assure leur précâblage interne ; les lots CVC assurent le montage mécanique et le lot E-MCR les raccordements électriques extérieurs.

    Les interventions et mises en service seront phasées et coordonnées avec l’exploitation du CHUV et les intervenants du projet de réaménagement du 3ᵉ étage.

    Details of Lot 4

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Stated per lot, see Lots
Construction service
Stated per lot, see Lots
Procedure
Open procedure
Trades
  • BKP 244 – Ventilation and air-conditioning installationsonly Lot 1, Lot 2, Lot 3, Lot 4
  • OAG 1.6.3 – Hospitalonly Lot 1, Lot 2, Lot 3, Lot 4
CPV
  • CPV 45331210 – Ventilation installation work
Options
Stated per lot, see Lots
Variants
Stated per lot, see Lots
Partial offers
Stated per lot, see Lots

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
24.10.2026 (first published 07.10.2026)
Questions until (round 1)past
20.10.2026

Les réponses seront transmises au plus tard le 26 octobre.

Questions until (round 2)past
02.11.2026
Submission deadlinenext
13.11.2026, 14:00
Bid valid
until 06.11.2028

Site visit

Mandatory according to the publication
Note of the contracting authority (date, time and place as published)

La visite du site est obligatoire pour une soumission valable et aura lieu le jeudi 15 octobre 2026 à 13h30.

Le point de rendez-vous est fixé devant l'entrée principale du bâtiment de la Rue du Bugnon 21, 1011 Lausanne.

Merci de confirmer votre présence au préalable à matthias.kohler@chuv.ch.

Une seconde visite sera organisée le mercredi 28 octobre à 15h30 au même point de rendez-vous.

Submission & documents

According to the simap data. We submit nothing for you.

  • By post or delivery in person

    Secrétariat de la Direction des constructions, ingénierie, technique et sécurité du CHUV CIT-SMatthias KöhlerRue du Bugnon 211011 Lausanne

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
French
Language of the documents
French
Cost of the documents
Free of charge
Note on obtaining the documents

L'ensemble des documents sont fournis sur la plateforme simap.ch.

Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

In the documents according to the source: Content only in the tender documentsIn the tender documents: Conditions of participation, Documents to submit.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

Suitability criteria are stated per lot: Lot 1, Lot 2, Lot 3, Lot 4.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

Award criteria are stated per lot: Lot 1, Lot 2, Lot 3, Lot 4.

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

4 conditions
Bidding consortia
Allowed

voir document Conditions générales CHUV

Subcontractors
Allowed

voir document Conditions générales CHUV section 4.6

Dialogue
Not provided for
Further information on the conditions

voir Conditions générales CHUV

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Lots (4)

  • Lot 1 – Projet BH10

    Type of contract
    Construction and installation
    Type of construction
    Building construction
    Construction service
    Execution
    Location

    local technique en toiture du BH10 et les équipements du foyer et des locaux annexes au BH08.

    CHUV
    Bâtiment hospitalier principal (BH) CHUV

    Rue du Bugnon 46, 1011 Lausanne

    Execution

    Voir calendrier prévisionnel fourni

    BKP
    BKP 244 – Ventilation and air-conditioning installations
    OAG
    OAG 1.6.3 – Hospital
    Options
    Not provided for
    Variants
    Not admitted

    Les variantes ne sont pas admises et ne seront donc pas prises en considération pour l’évaluation multicritères et lors de la décision d’adjudication.

    Partial offers
    Not admitted
    Contract extension
    Not provided for

    Suitability criteria

    Note of the contracting authority

    voir document "Conditions générales CHUV" section 10.11

    In the documents according to the source: Content only in the tender documentsThe suitability criteria are set out in the tender documents.

    Award criteria

    Note of the contracting authority

    voir document "Conditions générales CHUV" section 10.12

    In the documents according to the source: Content only in the tender documentsThe award criteria are set out in the tender documents.

  • Lot 2 – Projet MAT01

    Type of contract
    Construction and installation
    Type of construction
    Building construction
    Construction service
    Execution
    Location

    CHUV
    Maternité (MAT01)

    Av. Pierre-Decker 2

    1011 Lausanne

    Execution
    01.01.2027 to 31.10.2028

    Voir calendrier prévisionnel fourni les documents

    BKP
    BKP 244 – Ventilation and air-conditioning installations
    OAG
    OAG 1.6.3 – Hospital
    Options
    Not provided for
    Variants
    Not admitted

    Les variantes ne sont pas admises et ne seront donc pas prises en considération pour l’évaluation multicritères et lors de la décision d’adjudication.

    Partial offers
    Not given
    Contract extension
    Not provided for

    Suitability criteria

    Note of the contracting authority

    voir document "Conditions générales CHUV" section 10.11

    In the documents according to the source: Content only in the tender documentsThe suitability criteria are set out in the tender documents.

    Award criteria

    Note of the contracting authority

    voir document "Conditions générales CHUV" section 10.12

    In the documents according to the source: Content only in the tender documentsThe award criteria are set out in the tender documents.

  • Lot 3 – Projet FASOL

    Type of contract
    Construction and installation
    Type of construction
    Building construction
    Construction service
    Execution
    Location

    CHUV
    Bâtiment hospitalier principal (BH) CHUV

    Rue du Bugnon 46, 1011 Lausanne

    Execution

    Voir calendrier prévisionnel fourni

    BKP
    BKP 244 – Ventilation and air-conditioning installations
    OAG
    OAG 1.6.3 – Hospital
    Options
    Not provided for
    Variants
    Not admitted

    Les variantes ne sont pas admises et ne seront donc pas prises en considération pour l’évaluation multicritères et lors de la décision d’adjudication.

    Partial offers
    Not admitted
    Contract extension
    Not provided for

    Suitability criteria

    Note of the contracting authority

    voir conditions CHUV section 10.11

    In the documents according to the source: Content only in the tender documentsThe suitability criteria are set out in the tender documents.

    Award criteria

    Note of the contracting authority

    voir conditions CHUV section 10.12

    In the documents according to the source: Content only in the tender documentsThe award criteria are set out in the tender documents.

  • Lot 4 – Projet BU19 IST

    Type of contract
    Construction and installation
    Type of construction
    Building construction
    Construction service
    Execution
    Location

    CHUV
    Rue du Bugnon 19

    1005

    BKP
    BKP 244 – Ventilation and air-conditioning installations
    OAG
    OAG 1.6.3 – Hospital
    Options
    Not provided for
    Variants
    Not admitted

    Les variantes ne sont pas admises et ne seront donc pas prises en considération pour l’évaluation multicritères et lors de la décision d’adjudication.

    Partial offers
    Not admitted
    Contract extension
    Not provided for

    Suitability criteria

    Note of the contracting authority

    voir document "Conditions générales CHUV" section 10.11

    In the documents according to the source: Content only in the tender documentsThe suitability criteria are set out in the tender documents.

    Award criteria

    Note of the contracting authority

    voir document "Conditions générales CHUV" section 10.12

    In the documents according to the source: Content only in the tender documentsThe award criteria are set out in the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
44904
Publication number
44904-02
Covered by international agreements
No
Notice of legal remedies
Show

Le présent appel d’offres peut faire l’objet d’un recours à la Cour de droit administratif et public du Tribunal cantonal, Route du Signal 8 (Palais de Justice de l’Hermitage), 1014 Lausanne, dans les vingt jours dès sa notification par publication ; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours.

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Vaud: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.