Das Angebot weist insgesamt die beste Erfüllung der Zuschlagskriterien auf.
- Construction and installation
- BKP 231 Power equipment
- BKP 232 Power wiring
- +4
442 San BehiG Waldburg inkl. OE bis Rehalp, Elektroinstallation
- Location
- Place open, contracting authority in canton ZH
- Procuring office
- Forchbahn AG
Awarded directly
Awarded to
- Pfanner + Frei AG, Elektro-Anlagen, ZürichCHF 280’817.25
What is being procured?
Scope of work
Erstellen der Elektroinstallation im Projektperimeter Waldburg - Rehalp, insbesondere alle Elektroinstallationen im Bereich der Haltestelle Waldburg.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 231 – Power equipment
- BKP 232 – Power wiring
- BKP 236 – Low-current wiring
- BKP 238 – Temporary wiring
- BKP 239 – Miscellaneous
- BKP 33 – Electrical installations
- CPV
- CPV 45311000 – Electrical wiring and fitting work
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 7226
- Publication number
- 7226-01