All tenders
Awarded
  • Service

Installation von Smart Meter Systemkomponenten Lose 1-3

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
Place open, contracting authority in canton GR
Procuring office
Repower AG
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Lot 1: Installation von Smart Meter Systemkomponenten, EngadinAward of 02.04.20251 bid

    • esolva ag, WeinfeldenCHF 1’920’366.01 without VAT
  • Lot 2: Installation von Smart Meter Systemkomponenten, PrättigauAward of 02.04.20251 bid

    • esolva ag, WeinfeldenCHF 2’836’803.36 without VAT
  • Lot 3: Installation von Smart Meter Systemkomponenten, SurselvaAward of 02.04.20251 bid

    • esolva ag, WeinfeldenCHF 4’529’412.17 without VAT
Awards of this contracting authority

Justification

Unter Berücksichtigung der in den Ausschreibungsunterlagen festgelegten Zuschlagskriterien (Angebotspreis; Technischer Bericht, Projektreferenzen und Referenzen Schlüsselpersonen), erfüllt die Firma Esolva mit der eingereichten Offerte alle Vorgaben.

Awarded

Justification

Unter Berücksichtigung der in den Ausschreibungsunterlagen festgelegten Zuschlagskriterien (Angebotspreis; Technischer Bericht, Projektreferenzen und Referenzen Schlüsselpersonen), erfüllt die Firma Esolva mit der eingereichten Offerte alle Vorgaben.

Awarded

Justification

Unter Berücksichtigung der in den Ausschreibungsunterlagen festgelegten Zuschlagskriterien (Angebotspreis; Technischer Bericht, Projektreferenzen und Referenzen Schlüsselpersonen) erfüllt die Firma Esolva mit der eingereichten Offerte alle Vorgaben.

What is being procured?

Scope of work

Der Leistungsumfang dieser Ausschreibung beinhaltet folgende Dienstleistungen:

- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber

- Kundenavisierung, Koordination der Installationsarbeiten

- Logistik ab Lagerplätze Repower

- Installation von Smart Meter und Smart Manager

- Inbetriebnahme der Smart Meter und Smart Manager inklusive Kommunikation mit Head End System.

- Dokumentation des Installationsprozesses mittels ReTask Applikation

- Entsorgung alte Zähler und RS-Empfänger beim Auftraggeber

Weitere Details sind dem «Dok D_Technische_Spezifikationen» im Kap. 5 zu entnehmen.

Key facts, codes and options

Type of contract
Service
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 51100000 – Installation services of electrical and mechanical equipment
  • CPV 32571000 – Communications infrastructure
  • CPV 45311200 – Electrical fitting work
  • CPV 51210000 – Installation services of measuring equipment
  • CPV 65310000 – Electricity distribution
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
6617
Publication number
6617-02
Covered by international agreements
Yes

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.