Adjudication prononcée en exécution de l’arrêt de la Cour de droit administratif et public du Tribunal cantonal vaudois (CDAP) du 31 mars 2026 (cause MPU.2025.0049). Le recours de schaerholzbau AG a été admis et la décision d’adjudication de la Municipalité de Champagne du 1er octobre 2025 a été réformée : le marché est adjugé à schaerholzbau AG, dont l’offre obtient le premier rang après correction de la notation, pour un montant de CHF 3'848'188.30.
- Construction and installation
- BKP 214.0 Site facilities
- BKP 214.1 Carpentry
- +1
School and sports campus in Champagne. Lot 2142 Timber structure
- Location
- Canton VD
- Procuring office
- Commune de Champagne (Fesselet Krampulz architectes)
Awarded
Awarded to
- schaerholzbau ag, AltbüronCHF 3’848’188.25
What is being procured?
Scope of work
Construction d'un campus scolaire et sportif à Derrière-Ville sur la Commune de Champagne.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Building construction
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- BKP 214.0 – Site facilities
- BKP 214.1 – Carpentry
- BKP 214.3 – Prefabricated timber unit construction
- OAG 1.10.1 – Sports hall
- OAG 1.2.1 – Child daycare centre
- OAG 1.2.2 – General education school
- CPV
- CPV 45214200 – Construction work for school buildings
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 16287
- Publication number
- 16287-02
- Covered by international agreements
- Yes