All tenders
Awarded
  • Construction and installation

Tiefbahnhof Luzern mit Dreilindentunnel; Sondierbohrungen, Untersuchungen Geologie / Hydrogeologie

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton LU
Requesting office
Schweizerische Bundesbahnen SBB, Infrastruktur, Ausbau- und Erneuerungsprojekte, Knoten Luzern
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 06.08.202518 bids

    • Fretus AG, Bad ZurzachCHF 1’263’599.30 incl. VAT
Awards of this contracting authority

Justification

Beste Gesamtwirtschaftlichkeit.

What is being procured?

Scope of work

Language of the publication

Projektbeschreibung:

Die erste Etappe des Projektes Knoten Luzern besteht aus den Teilprojekten (TP) Tiefbahnhof Luzern (TP1) und Dreilindentunnel (TP2).

Das Teilprojekt 1 umfasst den Tiefbahnhof im 2. Untergeschoss mit vier Gleisen sowie zwei 14m breiten und 420m langen Mittelperrons. Darüber liegt die neue Verteilebene, welche im Norden in das neu geordnete 1. Untergeschoss des bestehenden Aufnahmegebäudes mündet. Das Untergeschoss wird um eine unterirdische Anlieferung unter dem Bahnhofplatz erweitert.

Das Trassee des Dreilindentunnels (Teilprojekt 2, TP2) beginnt beim Anschluss Ebikon, im Rontal, im Nord-Osten der Stadt Luzern. Der Tunnel unterquert anschliessend die Stadt Luzern und das Seebecken bis er im Bereich des Bahnhofplatzes an den Tiefbahnhof (TP1) anschliesst. Der Dreilindentunnel ist ein Doppelspurtunnel mit einer Auffächerung der Gleise im Anschlussbereich zum Tiefbahnhof. Der ganze Abschnitt TP2 vom Anschluss ans Stammgleis in Ebikon bis zur Schnittstelle mit dem Tiefbahnhof hat eine Länge von ca. 3.8 km.

Ziele der Untersuchungen:

Als Grundlage für die Planung der Arbeiten Phase Bauprojekt sind mehrere geologische und hydrogeologische Untersuchungen vorgesehen, um die in der Projektphase zu Grunde gelegte Modelle zu verifizieren:

- Kernbohrungen inkl. Versuche während Abteufen der Bohrung, Pumpversuche, Laborversuche (Clusterbohrungen, Filterbrunnen, Sondierbohrungen);

- Rammsondierung mit Piezometer

Losaufteilung:

Es sind 4 Lose vorgesehen; Pro Los ca. 7-10 Sondierungen

Es ist ein Angebot pro Los zulässig

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 45000000 – Construction workCPV general: general code without a field
  • CPV 45120000 – Test drilling and boring work
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
8041
Publication number
8041-03
Covered by international agreements
No

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Lucerne: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.