- Supply
framework agreement for the manufacture, testing an delivery of 123kV gas-insulated circuit breakers (SF6-free)
- Procuring office
- Axpo Grid AG
Corrected publication
Changed according to simap: Submission deadline, Opening of bids
At a glance
- 13.11.2026, 23:592 days left
- All of Switzerland
- Supply
- Open procedure
- In the documents
- In the documents
Is a bid worth it?
With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.
TEXFY assessment: Risks and notes
Tight deadlineImportant
2 days left to submit. Plan documents, proofs and delivery now.
Bid languageNote
The bid must be in German.
No bidding consortiumNote
A joint bid with other companies is not allowed.
3 more notes
Publication correctedNote
The contracting authority changed details. The current version applies.
Online via simap onlyGood to know
Bids are submitted on simap.ch; you need a bidder account there.
No variantsGood to know
Only the requested bid counts; your own alternative solutions are not allowed.
What is being procured?
Scope of work
In connection with this tender, a framework agreement is to be concluded for the manufacture, testing, and delivery of 123 kV gas-insulated circuit breakers (SF_6-free).
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Supply
- Type of supply
- Purchase
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 31212000 – Circuit breakers
- CPV 31200000 – Electricity distribution and control apparatus
- Options
- Not provided for
- Variants
- Not admitted
- Partial offers
- Not admitted
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Dates
- Published
- 02.10.2026 (first published 05.09.2026)
- Questions untilpast
- 23.09.2026
Beantwortung der Fragen bis spätestens 02.10.2026
- Submission deadlinenext
- 13.11.2026, 23:59
- Opening of bids
- 16.11.2026, 13:30, not public
- Bid valid
- 90 days after the deadline
- Contract
- Term 1460 days
- Execution
Siehe Teil 0 Angebotsbedingungen
Site visit
Es findet keine Begehung statt
Special deadlines and formal requirements
Special deadlines and formal requirements
Siehe Teil 0 Angebotsbedingungen
Submission & documents
Online via simap.ch
Source: simap data
- Documents on simap.ch (after signing in)
- German
- German
- Free of charge
- Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)
Participation & award
In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.
Participation & suitability
Siehe Teil 0 Angebotsbedingungen
Award criteria
Siehe Teil 0 Angebotsbedingungen
Conditions
5 conditions
- Bidding consortia
- Not allowed
- Subcontractors
- Not given
Siehe Teil 0 Angebotsbedingungen
- Contract extension
- Possible
4 Jahre fest, 1 Jahr optional mit automatischer Verlängerung
- Dialogue
- Not provided for
- Further information on the conditions
Siehe Teil 0 Angebotsbedingungen
Official source
- simap project number
- 43730
- Publication number
- 43730-02
- Covered by international agreements
- Yes
- Notice of legal remedies
ShowHide
1.Gegen diese Ausschreibung kann innert einer nicht erstreckbaren Frist von 20 Tagen seit der Publikation beim Verwaltungsgericht des Kantons Aargau, Obere Vorstadt 40, 5000 Aarau, Beschwerde erhoben werden. Der Stillstand der Fristen gemäss Zivilprozessrecht gilt nicht.
2.Die Beschwerde ist schriftlich einzureichen und muss einen Antrag sowie eine Begründung enthalten. Das heisst, es ist
a)anzugeben, wie das Verwaltungsgericht entscheiden soll, und
b)darzulegen, aus welchen Gründen diese andere Entscheidung verlangt wird.3.Auf eine Beschwerde, welche den Anforderungen gemäss den Ziffern 1. und 2. nicht entspricht, wird nicht eingetreten.
4.Die angefochtene Ausschreibung ist anzugeben, allfällige Beweismittel sind zu bezeichnen und soweit möglich beizulegen. Die Eingabe ist zu unterzeichnen.
5.Das Beschwerdeverfahren ist mit einem Kostenrisiko verbunden, das heisst die unterliegende Partei hat in der Regel die Verfahrenskosten sowie gegebenenfalls die gegnerischen Anwaltskosten zu bezahlen.
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.