Vorteilhaftestes Angebot
- Construction and installation
- NPK 111 Daywork
- NPK 113 Site establishment
- +4
Ringschluss Puzzainas
- Location
- Canton GR
- Procuring office
- Gemeinde St. Moritz, Infrastruktur & Umwelt
Awarded
Awarded to
- D. Martinelli AG, St. MoritzCHF 327’062.50
What is being procured?
Scope of work
Gegenstand des Auftrags sind die Baumeisterarbeiten für die Wasserleitung des Ringschlusses Puzzainas in St. Moritz.
Hauptmassen (erschöpfende Liste und unverbindliche Mengen):
- Aushub: 1'835 m3;
- Überschüssiges Aushubmaterial in Deponie: 365 m3;
- Spriessung: 2'540 m2;
- Lieferung und Auffüllung mit UG 0/45: 190 m3;
- Rohrumhüllung mit gesiebtem Aushubmaterial: 105 m3;
- Lieferung und Rohrumhüllung mit Betonkies 0/16: 105 m3;
- Auffüllung mit Aushubmaterial: 1'470 m3;
- Lieferung Planiekies für Wald (Verschleissschicht) UG 0/16: 45 m3;
- Feinplanie: 1'380 m2.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Construction and installation
- Type of construction
- Civil engineering
- Construction service
- Execution
- Procedure
- Open procedure
- Trades
- NPK 111 – Daywork
- NPK 113 – Site establishment
- NPK 117 – Demolition and dismantling
- NPK 151 – Construction works for utility mains
- NPK 213 – Hydraulic engineering
- NPK 221 – Sub-bases for transport routes
- CPV
- CPV 45000000 – Construction workCPV general: general code without a field
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 32263
- Publication number
- 32263-02
- Covered by international agreements
- No