All tenders
Open
  • Construction and installation
  • BKP 23 Electrical installations

SWW Moos bridging measures, pump station Horn, electrical installations

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
Stadt Zürich Wasserversorgung
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
11.01.2027, 10:0051 days left
Questions until
18.12.2026
Place
ZürichCanton ZH
Procedure
Open procedure
Eligibility and award
In the documents

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

  • Mandatory site visit: check the dateImportant

    According to the publication, attending is mandatory; date and place are in the note. Check there whether the visit is still ahead: missing it risks exclusion.

    Es findet eine obligatorische Begehung statt. From «Site visit»

  • Bid languageNote

    The bid must be in German.

    From «Bid languages»

  • No bidding consortiumNote

    A joint bid with other companies is not allowed.

    From «Bidding consortia»

2 more notes
  • Paper onlyGood to know

    Submission by post or in person. Allow for delivery and check whether the postmark or receipt counts.

    From «Submission»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    From «Variants»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 21.11.2026, 08:09

What is being procured?

Scope of work

Language of the publication

The Horn raw water pumping station is currently being operated via a temporary electrical infrastructure. Following the remediation of contaminants and the implementation of the necessary structural measures, all electrical installations will be completely renewed and rebuilt in accordance with current standards and fire safety requirements.

Throughout the construction period, the pumping station will remain in operation via the existing temporary system, which means that the raw water supply must be guaranteed at all times. This places high demands on the planning, coordination and execution of the works.

The plant shutdown scheduled for autumn 2027 will be used to switch the temporary operation over to the newly installed systems and control systems. During this period, the new infrastructure will be commissioned, the necessary switchover procedures carried out and the final functional tests conducted to lay the foundations for future routine operation.

Translated with DeepL.com (free version)

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Execution
Procedure
Open procedure
Trades
  • BKP 23 – Electrical installations
CPV
  • CPV 45310000 – Electrical installation work
  • CPV 45311000 – Electrical wiring and fitting work
  • CPV 45317000 – Other electrical installation work
Options
Not provided for
Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
21.11.2026
Questions untilnext
18.12.2026
Submission deadline
11.01.2027, 10:00
Opening of bids
11.01.2027, 11:00, not public
Bid valid
until 30.06.2027
Execution
15.03.2027 to 25.02.2028

Es gelten ausschliesslich die Termine vom definitiven Bauprogramm.

Site visit

Mandatory according to the publication
Note of the contracting authority (date, time and place as published)

Es findet eine obligatorische Begehung statt. Siehe A03 Art. 6.14.3

Special deadlines and formal requirements

Die Eingabekriterien sind in den Dokumenten hinterlegt.

Submission & documents

According to the simap data. We submit nothing for you.

  • By post or delivery in person

    Stadt Zürich WasserversorgungHardhof 98064 Zürich

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Note on obtaining the documents

Nach der Zustellung des Kontaktformulars und der Geheimhaltungserklärung wird der zweite Teil der Unterlagen zugestellt.

Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required).TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Award criteria, Conditions of participation, Documents to submit.

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

5 conditions
Bidding consortia
Not allowed
Subcontractors
Allowed
Contract extension
Possible
Dialogue
Not provided for
Further information on the conditions

Die Unternehmerin muss in Besitz einer gültigen allgemeinen Installationsbewilligung (NIV) vom eidgenössischen Starkstrominspektorat sein.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
47985
Publication number
47985-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Verfügung kann innert 20 Tagen seit deren Eröffnung durch Publikation beim Verwaltungsgericht des Kantons Zürich, Freischützgasse 1, Postfach, 8090 Zürich, schriftlich Beschwerde eingereicht werden. Die Beschwerdeschrift ist im Doppel einzureichen, sie muss einen Antrag und dessen Begründung enthalten. Die angefochtene Verfügung ist beizulegen. Die angerufenen Beweismittel sind genau zu bezeichnen und soweit möglich beizulegen.

Checked against simap: 21.11.2026, 08:09

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Zurich: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.