Das Angebot der Zuschlagsempfängerin hat die höchste Gesamtpunktzahl erreicht und gilt als das vorteilhafteste Angebot. Ausschlaggebend hierfür waren insbesondere das Zuschlagskriterium 1 (Wirtschaftlichkeit) sowie das Zuschlagskriterium 3 (projektbezogene Auftragsanalyse), in welchem die Anbieterin eine gute Bewertung erzielt hat.
- Service
Depot G Zürich - Generalplaner für die SIA Phasen 31 - 53
- Location
- Cantons SG, ZH
- Procuring office
- SBB Immobilien Finanzen und Beschaffung
- Requesting office
- SBB Immobilien Development Betriebsobjekte
Awarded
Awarded to
- Gähler und Partner AG, EnnetbadenCHF 2’748’652.20
What is being procured?
Scope of work
Das Projekt umfasst die Generalplanerleistungen für das Depot G Zürich über alle SIA Phasen (SIA Teilphasen 31 bis 53).
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Service
- Procedure
- Open procedure
- Trades
- Not evident from the available publication data.
- CPV
- CPV 71000000 – Architectural, construction, engineering and inspection services
- CPC
- CPC 3d347dc3-c815-4ec1-8e39-637046ba6f27 – Architectural services; engineering services and integrated engineering services, urban planning and landscape architectural services; related scientific and technical consulting services; technical testing and analysis services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
- simap project number
- 28049
- Publication number
- 28049-02
- Covered by international agreements
- Yes