All tenders
Open
  • Construction and installation
  • BKP 24 HVAC installations, building automation
  • BKP 25 Sanitary installations
  • +1

HVAC installations + Pellet boiler

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Procuring office
DIB - Elektrizitätswerk der Stadt Zürich (ewz)
Go to the official tender(simap.ch, opens in a new tab)

At a glance

Deadline
14.01.2027, 12:0050 days left
Questions until
07.12.2026
Site visit
Not stated
Place
ZürichCanton ZH
Procedure
Open procedure
Contract
01.02.2027 to 31.12.2027
Eligibility
In the documents

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication; in another language it is machine-translated.

Checked against simap: 25.11.2026, 12:03

What is being procured?

Scope of work

Language of the publication

Das ewz betreibt im Zürcher Stadtkreis 4 den Wärmeverbund Hardau. Aufgrund des

zunehmenden Leistungs- und Energiebedarfes im WV Hardau ist eine Erweiterung der

Energiezentrale Bullingerstrasse 39 erforderlich, um auch künftig den vertraglich

geschuldeten fossilfreien Deckungsgrad zu gewährleisten. Vorgesehen sind eine dritte Wärmepumpe (Luft/ Wasser) mit ca. 1.5 MW und zwei Pelletkessel mit insgesamt 3 MW Wärmeleistung. Dafür entsteht auf der Nordostseite des Bestandsbaus ein Erweiterungsbau. Im oberirdischen Teil werden die neuen Pelletkessel aufgestellt, im Untergeschoss wird das Pelletlager errichtet. Die Rückkühleranlage für die Luft-Wasser-WP wird auf dem Dach der bestehenden Energiezentrale platziert. Die Ausschreibung umfasst die Gewerke Heizung, Kälte, Lüftung und Sanitär. Der

Schwerpunkt liegt in den Gewerken Heizung und Kälte. Dazu gehören:

  • die Pelletlagerung mit Befüll- und Austragssystem
  • zwei Pelletkessel à 1.5 MW Wärmeleistung mit Abgasreinigung, Rauchgaskondensation sowie einer neuen Rauchgas- und Kaminanlage
  • neue Wärmespeicher (total 75'000l)
  • die Rückkühler mit Solekreis
  • die Einbindung der Wärmepumpe in Quellen- und Verflüssigerkreis [1]
  • der Anschluss der neuen Wärmeerzeuger an das bestehende Wärmenetz

[1] Die Wärmepumpe wird durch die Bauherrschaft in einer separaten Ausschreibung vergeben.

Das Gewerk Lüftung umfasst primär neue Anlagen für die Räume im Erweiterungsbau und

die Ertüchtigung bestehender Anlagen. Im Rahmen des Umbaus werden bestehende

Lüftungskomponenten im Zwischengeschoss des Bestands umverlegt und stellenweise

demontiert. Das Sanitärgewerk umfasst im Wesentlichen den Anschluss neuer Frischwasser- und Schmutzwasserleitungen im Rahmen des Neubaus sowie Anpassungen an Bestandsinstallationen. Zudem wird die Verteilerbatterie der Trinkwasserversorgung mit einer neuen Zuleitung erschlossen. Im Rahmen des Zubaus müssen bestehende Brauchwarmwasser-Speicher demontiert, versetzt und neu angeschlossen werden. Gearbeitet wird im laufenden Betrieb der Energiezentrale, die Wärmeversorgung des Netzes darf nicht unterbrochen werden. Zum Auftrag gehören neben Lieferung und Montage auch die Abstimmung mit dem Wärmepumpen-Lieferanten, Inbetriebsetzung,

Dokumentation und Instruktion des Betriebspersonals.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Building construction
Construction service
Execution
Procedure
Open procedure
Trades
  • BKP 24 – HVAC installations, building automation
  • BKP 25 – Sanitary installations
  • BKP 342 – Heating installations
CPV
  • CPV 45331000 – Heating, ventilation and air-conditioning installation work
  • CPV 45332400 – Sanitary fixture installation work
CPC
CPC 055b4cc7-28ee-44a3-bf95-49daa431070a – Construction work for buildings
Options
Not provided for
Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
25.11.2026
Documents available
25.11.2026 to 07.12.2026
Questions untilnext
07.12.2026
Submission deadline
14.01.2027, 12:00
Bid valid
200 days after the deadline
Contract
01.02.2027 to 31.12.2027
Execution
01.03.2027 to 31.12.2027

Submission & documents

The tender names 2 routes. We submit nothing for you.

  • Online via simap.ch

    Once submitted, the bid can no longer be changed on simap.ch.

    Source: simap data

  • By post or delivery in person

    DIB - Elektrizitätswerk der Stadt Zürich (ewz)Martin MüllerTramstrasse 358050 Zürich

    The information in the tender and the tender documents is authoritative. Check in particular whether the postmark or receipt counts.

    Source: simap data

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required).TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Weighting in percent, as published.

In the documents according to the source: Content only in the tender documentsIn the tender documents: Suitability criteria, Conditions of participation, Documents to submit.

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK 1

    55 %Price criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Preis - Prix

  2. ZK 2

    15 %

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Referenzen des Unternehmens - Références de l'entreprise

  3. ZK 3

    15 %

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Referenzen der Mitarbeitenden / Schlüsselrollen - Références des collaborateurs / Postes clés

  4. ZK 4

    10 %

    TEXFY assessment: What this means: Approach – how you tackle the contract, described in a concept or an analysis of the task.

    Organisation und Auftragsanalyse - Organisation et analyse des commandes

  5. ZK 5

    5 %

    TEXFY assessment: What this means: Sustainability – environmental and social aspects of your offer, such as energy, materials or transport.

    Nachhaltigkeit im Unternehmen - Le développement durable dans l'entreprise

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

4 conditions
Bidding consortia
Allowed
Subcontractors
Allowed
Contract extension
Not provided for
Dialogue
Not provided for

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
48219
Publication number
48219-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Verfügung kann innert 20 Tagen seit deren Eröffnung durch Publikation beim Verwaltungsgericht des Kantons Zürich, Freischützgasse 1, Postfach, 8090 Zürich, schriftlich Beschwerde eingereicht werden. Die Beschwerdeschrift ist im Doppel einzureichen, sie muss einen Antrag und dessen Begründung enthalten. Die angefochtene Verfügung ist beizulegen. Die angerufenen Beweismittel sind genau zu bezeichnen und soweit möglich beizulegen.

La présente décision peut faire l’objet d’un recours écrit à la Cour de droit administratif et public du Tribunal cantonal de Zurich, Freischützgasse 1, case postale, 8090 Zurich, dans les vingt jours dès sa notification par publication; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours.

Checked against simap: 25.11.2026, 12:03

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Zurich: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.