All tenders
Open · 8 days left
  • Service

Fire and explosion protection and control consultancy services – Leistungen der Brandschutzplanung nach Ziffer 1.4. des Heftes Nr. 17 der AHO-Fachkommission "Brandschutz"

Procuring office
Stadt Bad Wörishofen
Go to the official tender(TED, opens in a new tab)

At a glance

Deadline
19.11.2026, 10:008 days left
Place
Bad Wörishofen, Germany
Type
Service
Procedure
Open procedure

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

TEXFY assessment: by fixed rules, no AI. Everything else comes from the notice on TED.

Taken from TED: 05.11.2026, 08:10

What is being procured?

Scope of work

Original language: German

Leistungen der Brandschutzplanung nach Ziffer 1.4. des Heftes Nr. 17 der AHO-Fachkommission "Brandschutz", Leistungsphasen (LPH) 1 bis 5 und 8 - stufenweise - für den Ersatzneubau und die Umstrukturierung der Pfarrer-Kneipp Grund- und Mittelschule.

Key facts

Status
Open, deadline 19.11.2026, 10:00
Notice
Contract notice767692-2026
Type of contract
Service
Procedure
Open procedure
CPV
71317100 – Fire and explosion protection and control consultancy services71320000 – Engineering design servicesCPV names: © European Union, Publications Office (CPV 2008).
Place of performance
Bad Wörishofen, Swabia region, Germany
Contracting authority
Stadt Bad Wörishofen, Bad Wörishofen, Germany
Treaty scope (WTO GPA)
No

TED publishes corrections and cancellations as separate notices; TEXFY does not take them over. Check them on TED before you bid.

TED source

Source: TED – Tenders Electronic Daily, Publications Office of the EU. Not an official publication; the notice on TED is authoritative.

Go to the official tender(TED, opens in a new tab)
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.