Awarded
- Service
- BKP 291 Architect
- BKP 292 Structural/civil engineer
- +4
Rahmenvertrag Generalplanerleistung UZH I Teilportfolio Campus Irchel Mitte + technisch komplexe Bauvorhaben Teilportfolio Zentrum
- Location
- Canton ZH
- Procuring office
- Direktion Immobilien und Betrieb I Abteilung Baumanagement
Awarded
Awarded to
- ahochn AG (per 01.01.26 Enerpeak AG), DübendorfCHF 145.95
- C/O Architektur AG, ZürichCHF 145.95
- Macieczyk Borer Burch, ZürichCHF 149.15
What is being procured?
Scope of work
siehe Pflichtenheft Kapiel 1 und 2.
Key facts, codes and options
Key facts, codes and options
- Type of contract
- Service
- Procedure
- Selective procedure
- Trades
- BKP 291 – Architect
- BKP 292 – Structural/civil engineer
- BKP 293 – Electrical engineer
- BKP 294 – HVAC engineer
- BKP 295 – Sanitary engineer
- eBKP-H V01.06 – Lead designer, design consortium
- CPV
- CPV 71000000 – Architectural, construction, engineering and inspection services
- CPC
- CPC 3d347dc3-c815-4ec1-8e39-637046ba6f27 – Architectural services; engineering services and integrated engineering services, urban planning and landscape architectural services; related scientific and technical consulting services; technical testing and analysis services
- Options
- Not evident from the available publication data.
- Variants
- Not evident from the available publication data.
- Partial offers
- Not evident from the available publication data.
TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.
Official source
Go to the official tender(simap.ch, opens in a new tab)
- simap project number
- 11604
- Publication number
- 11604-04
- Covered by international agreements
- Yes
More in the guide
Report a data error
Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.