At a glance

Deadline
01.12.2026, 17:0020 days left
Type
Construction and installation
Procedure
Open procedure
Award weighting
Not stated
Site visit
Not mandatory

Is a bid worth it?

With a free profile, TEXFY checks this tender against your services and cantons: a relevance grade from A to E and a recommendation with reasons.

Start for free

TEXFY assessment: Risks and notes

2 more notes
  • Via a platform onlyGood to know

    Bids are submitted on an external platform. Register there in good time.

    From «Submission»

  • No variantsGood to know

    Only the requested bid counts; your own alternative solutions are not allowed.

    From «Variants»

TEXFY assessment: by fixed rules, no AI. Everything else comes from the publication.

Checked against simap: 11.11.2026, 08:08

What is being procured?

Scope of work

Language of the publication

Tiefbau- und Baumeisterarbeiten für die Erstellung einer Trinkwasserleitung inklusive Grabenbau, Unterstützung des Rohrverlegers sowie Verlegung und Kalibrierung von Kabelschutzrohren.

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • NPK 111 – Daywork
  • NPK 113 – Site establishment
  • NPK 116 – Felling and site clearance
  • NPK 117 – Demolition and dismantling
  • NPK 151 – Construction works for utility mains
  • NPK 222 – Segmental (sett, block and flag) paving, kerbing and steps
  • NPK 223 – Asphalt and concrete pavements
CPV
  • CPV 45112000 – Excavating and earthmoving work
  • CPV 45112100 – Trench-digging work
  • CPV 45232000 – Ancillary works for pipelines and cables
Options
Not provided for
Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Dates

Published
11.11.2026
Questions untilnext
18.11.2026
Submission deadline
01.12.2026, 17:00
Bid valid
until 30.05.2027
Contract
04.01.2027 to 29.10.2027
Execution

Der Ausführungsbeginn ist voraussichtlich auf Ende Januar / Anfang Februar 2027 vorgesehen. Die Ausführung erfolgt unter Vorbehalt der Erteilung der erforderlichen Baubewilligung. Der definitive Ausführungstermin wird nach Vorliegen der Baubewilligung durch die Bauherrschaft festgelegt.

Site visit

Note of the contracting authority (date, time and place as published)

Es ist keine gemeinsame Begehung vorgesehen. Die Anbieter haben sich selbstständig über die örtlichen Gegebenheiten zu informieren. Gute Ortskenntnisse werden vorausgesetzt.

Submission & documents

According to the simap data. We submit nothing for you.

Tender documents
Documents on simap.ch (after signing in)
Languages of the bid
German
Language of the documents
German
Cost of the documents
Free of charge
Questions to the contracting authority
Through the question forum on simap.ch (registration as a bidder required). Go to the official tender (simap.ch, opens in a new tab)TEXFY sends no questions. The deadlines of the question rounds are under “Dates”.

Participation & award

Abbreviations in the publication (German): EK = eligibility criterion, ZK = award criterion.

Participation & suitability

Must-have criteria: a bidder who fails one or leaves out the required proof is excluded before the bids are scored.

3 eligibility criteria
  1. EK 1

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Erfahrung mit vergleichbaren Randbedingungen

    Evidence

    Erfahrung mit vergleichbaren Randbedingungen im Tief- und Werkleitungsbau unter Verkehr und bei aufrechtzuerhaltender Erschliessung.

  2. EK 2

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Mindestens zwei vergleichbare Referenzprojekte

    Evidence

    Mindestens zwei vergleichbare Referenzprojekte im Trinkwasser- oder Werkleitungsbau aus den letzten fünf Jahren.

  3. EK 3

    TEXFY assessment: What this means: Experience – whether you have carried out comparable contracts, shown with references.

    Qualifikation, Erfahrung

    Evidence

    Qualifikation, Erfahrung und gesicherte Verfügbarkeit von Bauführer und Polier.

Award criteria

How valid bids are compared: each criterion counts with its weighting, the bid with the most points wins the contract.

  1. ZK 1

    Price criterion

    TEXFY assessment: What this means: Price – what your offer costs. Usually the cheapest offer gets full points, more expensive ones fewer.

    Preis

  2. ZK 2

    TEXFY assessment: What this means: Approach – how you tackle the contract, described in a concept or an analysis of the task.

    Auftragsanalyse und Bauablauf

  3. ZK 3

    TEXFY assessment: What this means: Organisation – how your company and team are set up for the contract.

    Baustellenorganisation und Logistik

  4. ZK 4

    TEXFY assessment: What this means: Personnel – how qualified and experienced the people carrying out the contract are, such as the project manager.

    Referenzen und Erfahrung der Schlüsselpersonen

  5. ZK 5

    TEXFY assessment: What this means: Schedule – whether your timetable meets the deadlines and is realistic.

    Terminprogramm und Ressourceneinsatz

  6. ZK 6

    TEXFY assessment: What this means: Training – whether your company trains apprentices.

    Ausbildung von Lernenden

Conditions

Rules for the bid and the contract, for example whether consortia or subcontractors are allowed and how payment works.

5 conditions
Bidding consortia
Not allowed
Subcontractors
Not given
Contract extension
Not provided for
Dialogue
Not provided for
Further information on the conditions

Die detaillierten Anforderungen und erforderlichen Nachweise werden in den Ausschreibungsunterlagen geregelt.

Documents to submit

Only evidence that the publication itself names. This evidence belongs in the bid. The tender documents may ask for more.

3 pieces of evidence according to the publication
  • Suitability · EK 1

    Erfahrung mit vergleichbaren Randbedingungen im Tief- und Werkleitungsbau unter Verkehr und bei aufrechtzuerhaltender Erschliessung.

  • Suitability · EK 2

    Mindestens zwei vergleichbare Referenzprojekte im Trinkwasser- oder Werkleitungsbau aus den letzten fünf Jahren.

  • Suitability · EK 3

    Qualifikation, Erfahrung und gesicherte Verfügbarkeit von Bauführer und Polier.

The glossary explains terms such as eligibility criteria, self-declaration or reference. To the glossary

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
47414
Publication number
47414-01
Covered by international agreements
Yes
Notice of legal remedies
Show

Gegen diese Ausschreibung kann innert 20 Tagen, von der Publikation an gerechnet, beim Verwaltungsgericht des Kantons Zürich, Freischützgasse 1, Postfach, 8090 Zürich, schriftlich Beschwerde eingereicht werden. Die Beschwerdeschrift ist im Doppel einzureichen. Sie muss einen Antrag und dessen Begründung enthalten. Die angefochtene Ausschreibung ist beizulegen. Die angerufenen Beweismittel sind genau zu bezeichnen und, soweit möglich, beizulegen.

Checked against simap: 11.11.2026, 08:08

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Zurich: monthly reports
Report a data error