Baumeister Fahrbahnerneuerung Interlaken Ost - Instandsetzung untere und obere Aarebrücke

Published in German / French. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton BE
Go to the official tender(simap.ch, opens in a new tab)

Awarded

According to the simap publication. Values that are not given are deliberately missing here.

Awarded to

As published on simap.ch: winner and price (with or without VAT, as stated).

  • Award of 16.10.20252 bids

    • Walo Bertschinger AG Bern, BernCHF 13’589’833.30 incl. VAT
Awards of this contracting authority

Justification

Das Angebot der Firma Walo Bertschinger AG überzeugte mit einer detaillierten und schlüssigen Auftragsanalyse, ausführlichen und projektbezogenen technischen Konzepten, einer durchdachten und nachvollziehbaren, wie geforderte Termin- und Ressourcenplanung und geeigneten und qualifizierten Schlüsselpersonen.

What is being procured?

Scope of work

Language of the publication

Die Ausschreibung des Projektes «Bahnhof Interlaken Ost: Optimierung Westkopf & Fahrbahnerneuerung» umfasst folgende Projektelemente:

  • Gesamtsanierung des Unterbaus zwischen der unteren Aarebrücke (km 26.76) bis zur westlichen Personenunterführung (km 28.0) im Bahnhof Interlaken Ost
  • Neubau einer Stützmauer beim Steinschlagschutzdamm und beim Bahnübergang Du Lac
  • Erneuerung der Abdichtungen und lokale Betoninstandsetzung der Kunstbauten (Personenunterführungen und Bachdurchlässe) im Projektperimeter
  • Schrämmen der Felsnase und Netzabdeckungen (km 27.5 – 27.6)
  • Anpassen der Perronkanten an die neue Gleisgeometrie
  • Anpassen und Erweiterung des Bahnüberganges Du Lac und des Höheweges an die neue Gleissituation

Die Ausschreibung des Projektes «Erneuerung Untere und Obere Aarebrücke» umfasst folgende Projektelemente:

  • Instandsetzung und neuer Kolkschutz des Pfeilers der unteren Aarebrücke
  • Instandsetzung und Verstärkung des Widerlager Nord der unteren Aarebrücke
  • Verstärkung der Fundation des Pfeilers der oberen Aarebrücke mit neuen Bohrpfählen (d=90cm)
  • Verstärkung der Fundation des Widerlagers Ost der oberen Aarebrücke mit neuen Bohrpfählen (d=90cm)

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
  • BKP 16 – Adaptations to existing transport facilities
  • BKP 17 – Special foundation and geotechnical works
  • BKP 211 – Builder's work
  • OAG 3.1 – Bridge
  • OAG 3.2 – Retaining structure
CPV
  • CPV 45221100 – Construction work for bridges
  • CPV 45000000 – Construction work
Options
Not evident from the available publication data.
Variants
Not evident from the available publication data.
Partial offers
Not evident from the available publication data.

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official tender(simap.ch, opens in a new tab)
simap project number
16743
Publication number
16743-03
Covered by international agreements
Yes

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Contract awards in Bern: monthly reports
Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.