All early signals
Early signal: Prior information notice
  • Construction and installation

Wildpark-Höfli Double Track: Construction Work

Published in German. Sign in and TEXFY shows the texts in English. Sign in

Location
Canton ZH
Procuring office
Sihltal Zürich Uetliberg Bahn SZU AG
Go to the official publication(simap.ch, opens in a new tab)

Early signal

Prior information notice

This publication is not a running tender.

With a prior information notice, the contracting authority announces a planned tender. Whether and when it appears is only certain with the tender itself.

Published
18.09.2026
Tender expected (stated by the contracting authority)
30.11.2026

What is being procured?

Scope of work

Language of the publication

The increase in traffic volume on the Sihltal Railway has been accommodated in recent years through measures relating to rolling stock and operations, such as increased service frequency and increased train capacity. However, the introduction of a 10-minute service interval has resulted in very limited time reserves at the crossing points, meaning that delays are frequently transferred to trains travelling in the opposite direction.

The anticipated further increase in passenger numbers can no longer be accommodated by the existing infrastructure. The service planning resulting from an overall assessment and coordinated with the ZVV requires further infrastructure expansion, taking into account the requirements of the Swiss Disability Equality Act (BehiG).

The project area extends from km 8.8 to km 10.2. A double-track section is planned between km 9.0 and km 10.2, which also requires the existing Wildpark-Höfli stop to be reconstructed.

The works in the track area and the railway-related civil engineering structures will be carried out during a six-month total closure of the railway line.

The scope of the civil engineering contractor's works includes the following:

  • Construction of a new double-track section, including sub-ballasting (track superstructure by third parties)
  • Construction of the track substructure, drainage systems, foundations for overhead line and signalling systems, and cable ducts
  • Construction of two side platforms at Wildpark-Höfli stop, including ramps, fences, railings and similar elements, as well as platform canopies (platform furniture by third parties)
  • Construction of the foundation for a railway technology building
  • Replacement construction of the Zelgweg pedestrian underpass at km 9.395
  • Extension of the pedestrian underpass in the Breitwiesenweg area at km 10.047
  • Construction of a new retaining wall at the sports field and the adjacent properties, approximately from km 9.78 to km 10.06
  • Replacement construction of two noise barriers (320 m and 110 m in length)
  • Realignment of the cantonal road Sihltalstrasse, including road drainage and public lighting
  • Further adaptation and reinstatement works
  • Relocation of utility lines, in particular the DN600 spring water pipeline of the City of Zurich and the water supply pipeline of the Municipality of Langnau am Albis (installation of the water pipeline and associated installations by third parties)
  • Temporary traffic light system and temporary replacement bus stops during the railway closure

The following elements are not included in the scope of the tender:

  • Renewal of the track superstructure, including replacement of the cable duct between Sihlau and Wildpark-Höfli (km 8.4–8.8); carried out concurrently during the total railway closure
  • Railway technology building (supply and construction by third parties)
  • Railway signalling system, including the signalling system for the Sonvico level crossing
  • Modification of the traffic light system at the Sonvico level crossing on Sihltalstrasse
  • Overhead line system
  • Cable systems
  • Point heating system
  • Telecommunications systems
  • Control and automation systems
  • Electrical works
  • Furniture and equipment elements at Wildpark-Höfli stop
  • Road markings / passenger guidance markings
  • Safety services
  • Surveying services for the client
  • Sanitary works

Key facts, codes and options

Type of contract
Construction and installation
Type of construction
Civil engineering
Construction service
Execution
Procedure
Open procedure
Trades
Not evident from the available publication data.
CPV
  • CPV 45000000 – Construction workCPV general: general code without a field
  • CPV 45233120 – Road construction works
  • CPV 45234116 – Track construction works
Options
Not provided for
Variants
Not admitted
Partial offers
Not admitted

TEXFY assessment: Products, installations, quantities, technical specifications and exclusions are not structured fields of the publication. TEXFY does not analyse the free text on them: check the original text and the tender documents.

Official source

Go to the official publication(simap.ch, opens in a new tab)
simap project number
43741
Publication number
43741-01
Covered by international agreements
Yes

Checked against simap: 10.11.2026, 18:02

Export

This is not an official publication. Only the data published on the platform www.simap.ch is authoritative. Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten. Anyone who reuses this data complies with the conditions of simap.ch: terms, section 6.

Report a data error

Is something on this page wrong, missing or badly translated? We check every report. We correct our own classification and translations ourselves; what simap publishes can only be changed by the contracting authority.

Kind of error

Please do not write personal data into it. If you are signed in, we store the report with your account.